METHOD STATEMENT FOR

NSRP MAGNETIC FLUX LEAKAGE TEST *DOCUMENT NO :


D-P5-BV-MS-010
DCSM PROJECT
2019

Contractor’s Name : BUREAU VERITAS VIETNAM


Company’s Name : Nghi Son Refinery and Petrochemical LLC.
Plant Location : Nghi Son, Viet Nam
W/ Order No. :
Package No. :5
Scope of Work : METHOD STATEMENT FOR MAGNETIC FLUX LEAKAGE TEST
Discipline : DCSM
NSRP DCSM PROJECT 2019
Discipline
Receiving Date
Reviewed By
Review Date
Review Result code
Document Review codes:
1- Rejected (Revise and resubmit), 2- Comments as Noted (Revise and resubmit. Work may
proceed subject to full compliance with comments), 3- Minor Comments (Acceptable, Works
may proceed. Revise & Resubmit as “Certified Final), 4- No comments (Works may Proceed)
Returned on
Next Submission Due
Date

Rev. Date Description Prepared By Reviewed by Approved By

0 Issued For
26/09/2019
Approval
Nguyen Gia Annamalai Annamalai
Dinh Natarajan Natarajan
Project Manager

DESCRIPTION

Page 1 of 5
METHOD STATEMENT FOR

NSRP MAGNETIC FLUX LEAKAGE TEST *DOCUMENT NO :


D-P5-BV-MS-010
DCSM PROJECT
2019

Section Description Page No.

Scope of Work
1 3

2 Loading of MFL testing equipment 3

3 Site survey to do magnetic flux leakage 3

4 Mobilization of MFL inside Working area. 3

5 Unloading of MFL Equipment transfer to the site location. 4

6 MFL testing inspection at working on the ground level. 4

7 MFL inspection at working on Working at the height. 5

8 Loading of MFL equipment. 5

9 House Keeping 5

1. SCOPE OF WORK:

Page 2 of 5
METHOD STATEMENT FOR

NSRP MAGNETIC FLUX LEAKAGE TEST *DOCUMENT NO :


D-P5-BV-MS-010
DCSM PROJECT
2019

This documented is intended to detect the remaining thickness of pressure piping, boiler or power piping
and made of carbon steels using MFL Equipment with Required probes – Portable, Dry Cloth.

2. LOADING OF MFL TESTING EQUIPMENT:

 During Loading the equipment and accessories Leather hand glove shall be worn.

 Ensure all equipment is stack away from the edge of the lorry bed and secure properly to prevent
falling.

 Ensure provide training on safe handling & manual lift of material to the workforce.

 Leather hand glove shall be worn when perform the entire work.

3. SITE SURVEY TO DO MFL TESTING:

 Ensure the proper planning.

 Ensure the isometric drawing with site layout plan is in place.

4. MOBILIZATION OF MFL TESTING EQUIPMENT INSIDE WORKING AREA:

 Valid license, are required in Client.

 All personnel shall complete Client SIC training prior to enter the site.

 All personnel to obtain security pass prior to entry.

 Ensure that all the workers had sufficient rest prior starting the task.

 Ensure authorized an trained person involved in the live plant work are allowed to enter in the
area.

 General Work Permit shall be applied by Permit requestor and approved prior to start the work.

 Ensure that the entire worker had sufficient rest prior commencing the task.

 Safety glasses, hard hat, pants, protective industrial products hand gloves, safety boots, Safety
Goggle, Ear Plug as per Client PPE safety requirement.

 Driver shall follow the Client road safety regulation 15km/h on the road in the plant area.

 Ensure pickup / van operator shall obtain valid license during the entire work.

Page 3 of 5
METHOD STATEMENT FOR

NSRP MAGNETIC FLUX LEAKAGE TEST *DOCUMENT NO :


D-P5-BV-MS-010
DCSM PROJECT
2019

 Metal wheels choke for vehicle in place.

 Valid Fire Extinguisher with stands. (9kg, ABC type) for vehicle in place.

 No vehicle is allowed for parking except for short delivery during working hour. Working hour.

 Workers shall bring along their individual refill water bottle.

5. UNLOADING OF MFL TESTING EQUIPMENT TRANSFER TO THE SITE LOCATION:

 During Loading / unloading the equipment and accessories Leather glove shall be worn.

 Ensure all equipment is stack away from the edge of the pickup bed and secure properly to
prevent falling.

 Leather hand glove shall be worn when perform the entire work.

6. MFL INSPECTION AT WORKING ON THE GROUND LEVEL:

 Verify the cable is in good condition.

 Insufficient lighting will be informed to the concern supervisor.

 Ensure Gas tester done before carryout job.

 During the job 4 in one gas monitor available on site.

 Ensure all the obstruction materials shall remove from site immediately.

 Ensure the area is free from all obstruction materials prior to start work.

 Remind worker report to supervisor worker not feeling well or dizzy.

 Insufficient lighting will be informed to the concern supervisor.

 Ensure the proper lighting before entering the site.

 No proper lighting, no work activities.

7. MFL TESTING INSPECTION AT WORKING ON THE (WORKING AT HEIGHT)

Page 4 of 5
METHOD STATEMENT FOR

NSRP MAGNETIC FLUX LEAKAGE TEST *DOCUMENT NO :


D-P5-BV-MS-010
DCSM PROJECT
2019

 Ensure workers maintain communication with each other during passing of material

 Always stay away from line of fire when passing on different level of scaffold platform.

 Use tool bag to carry the equipment by using rope.

 Work Permit & WAH Form is issued and approved by relevant parties.

 The workers must complete the WAH course before entering to the work site.

 Hook up SRL at/ above waist level.

 100% tie-off at strong anchorage point.

 Harness & SRL to be inspected with tag and check prior to use.

 Ensure proper donning of harness and SRL by workers (Buddy system checks prior to use).

8. LOADING OF MFL QUIPMENT:

 During Loading the equipment and accessories Leather hand glove to be worn.

 Ensure all equipment is stack away from the edge of the lorry bed and secure properly to prevent
falling.

 Ensure provide training on safe handling & manual lift of material to the workforce.

 Leather hand glove shall be worn when perform the entire work.

9. HOUSEKEEPING:

 Housekeeping is a must "Before, During & End" of work day.

 Materials must never be left on the ground but stacked neatly on stillage and hard barricaded.

 Work area must be swept clean of all times.

 Work area must be swept clean of all times.