You are on page 1of 1

Directorate of Erbil Borehole log

Construction Laboratory Based on ASTM D1587-00 & D6032-02

.Test Form No S - 12 Revision 05 Approve date 04.04.2019

″Field Data
Project Name Consttaction of Rozh Tawaer
Location Erbil BH No. C11 Lab No.
Drilling Method Augar Groundwater level N.W.T Starting Date 22-8-2021
Machine Name kores Level & Coordinate Sending Date

Climat
e&
Sample Lab Material Description CR RQD No. of Blows
S Depth (m) (%) (%) Field
Type No. (30 cm)
Remar
ks
1 0.0 2.0 D 2458
Br. Silt clay with gravel

2 2.0 2.5 SS 2459 Br. Silt clay with gravel


19 40 502″

3 2.5 4.0 D 2460 Br. Silt clay with gravel

4.0 4.5 2461 Br. Silt clay with gravel 505


4 SS 22

5 4.5 5.5 D 2462 Br. Silt clay with gravel

5.5 6.0 2463 Br. Silt clay with gravel 505


6 SS 28

7

Remarks 1-2

Tested by: Checked by: Approved by:


(Title/Name/Date/Signature)

You might also like