SCHEDULE OF UNIT RATES

PIPING INSTALLATION

The rates entered herein shall be used for variation in the quantities of work carried out
and shall be applicable to both additional and deleted work.

Unit rates shall be include all overhead and profit and shall be cover supply, installation
with supports or mountings, painting and labeling, commissioning and testing.

1. Pipe work installed per metre run including pipe fittings, hangers, painting,
excavation, backfilling and removal of surplus and other accessories except
valves.

Per Metre Run


Pipe Copper
Diameter Light Gauge (Table X) to BS 2871
(mm) Without With
Insulation Insulation
13
19
25
32
38
50
65
75
100
125
150

Company’s Stamp : ………………………. Signature: …………………

PERUNDING AZFAR SUR..1 PAF316/SUR


SCHEDULE OF UNIT RATES

PIPING INSTALLATION

Per Metre Run


Cast Iron Vitrified Clay
Pipe Diameter Buried Exposed Buried
(mm) (to BS 1211) (to BS 416) (to BS 65)
50
65
75
100
125
150
200
250
300

Company’s Stamp : ………………………. Signature: …………………


SCHEDULE OF UNIT RATES

PIPING INSTALLATION

PERUNDING AZFAR SUR..2 PAF316/SUR


Per Metre Run
Pipe Diameter Stainless Steel Sch. 40 HDPE PN 12.5 UPVC Class D
(mm) To ASTM To BS 3505 & 3506
13
19
25
32
38
50
65
75
100
125
150
200
250
300

Company’s Stamp : ………………………. Signature: …………………


SCHEDULE OF UNIT RATES

PIPING INSTALLATION

Per Metre Run


Pipe Diameter Unplasticised Polininyl Chloride Modified Unplasticised Polivinyl
(mm) (UPVC) to BS 4514 and BS 5255 Chloride (MUPVC) to BS 5255
13
19
25

PERUNDING AZFAR SUR..3 PAF316/SUR


32
38
50
65
75
100
125
150
200
250
300

Company’s Stamp : ………………………. Signature: …………………


SCHEDULE OF UNIT RATES

PIPING INSTALLATION
Floor Trap and Gully Trap

(a) Cast Iron Floor Trap with Chrome Grating RM …………………

(b) Cast Iron Floor Trap with Stainless Steel Grating RM …………………

(c) Cast Iron Gully Trap with Cast Iron Grating RM …………………

(d) Cast Iron Gully Trap with Chrome Grating RM …………………

(e) PVC Floor Trap with Chrome Grating RM …………………

(f) PVC Floor Trap with Stainless Steel Grating RM …………………

(g) PVC Gully Trap with Cast Iron Grating RM …………………

(h) PVC Gully Trap with Chrome Grating RM …………………

PERUNDING AZFAR SUR..4 PAF316/SUR


External Manhole complete with
Cover (To Authority Approved Type)

(a) 1 metre deep RM …………………

(b) 1.5 metre deep RM …………………

(c) 2 metre deep RM …………………

(d) 2.5 metre deep RM …………………

(e) 3 metre deep RM …………………

(f) 3.5 metre deep RM …………………

Manhole Cover

(a) Medium duty class RM …………………

(b) Heavy duty class RM …………………

Company’s Stamp : ………………………. Signature: …………………

PERUNDING AZFAR SUR..5 PAF316/SUR


SCHEDULE OF UNIT RATES

PIPING INSTALLATION

Valves installed complete with flanges, gaskets, bolts and nuts etc.

Working Pressure : 862 kPa (125 psi) with insulation


Diameter Gate Globe Check Ball Sluice Chrome Plated Strainer Expansion Automatic
(mm) Valve Valve Valve Valve Valve Stop Cock Joint Air vent
13
19
25
32
38
50
65
75
100
125
150
200
250

PERUNDING AZFAR SUR..6 PAF316/SUR