1-Basic PPE to be used while working. (Goggle ,Helmet ,Safety Gloves Anuj Sharma ,Safety Shoe, Gum Boot, ,Safety Mask for COVID-19 etc ) . 2-Site Area to be restricted and barricade for unauthorized person. Barricading of working Human Injury,Manual 1 Human Injury 3-Temporary Light to be provided to ensure sufficient lux level at site if area handling required. 5- Contractor Supervisor will monitor the labors and will keep on talking them to ensure their wellness. 1- Good condition of suction pump or Tanker will be used for removing GPSPL Team Human Injury,Manual 2 Bore well digging Human Injury, Raw water from tank. handling 2-Raw water will be shifted to Gutter directly to STP Plant. GPSPL Team 1- Labor will go inside the under ground tank to collect the Mud /sand Respiratory problem, Removal of Mud/sand dust contamination, and will shift out side through bucket manually. 3 Eye Infection, from bore well Manual Handling 2- Sand /Mud will be kept open area at out side the pump house Human Injury 3-Labour will ensure all required PPE as mentioned above.
1- Basic PPE still to be used while working. GPSPL Team
Removing of barricading Eye Infection, 4 Manual Handling 2-Surrounding area must be cleaned from unwanted materials after nearer to tank area . Human Injury completion the Job.
NOTE:- 1.ALL THE REQUIRED PPE WILL BE USED WHILE WORKING. 2.JCBIL SHALL DEPUTE A SAFTEY OFFICER THROUGH OUT THE WORKING PROCESS. 3- Date and time to do work :-
Prepared by : Utility Deptt Reviewed by : Deptt Head Approved by :Safety Deptt
(the Lean Guidebook Series) Mascitelli, Ronald_ Mascitelli, Ronald-The Lean Design Guidebook _ Everything Your Product Development Team Needs to Slash Manufacturing Cost-Technology Perspectives (2004)