Project Site Mobilisation Checklist

The Project incharge should be asked to visit the site immediately after the award of
Contract and submit the following report:

Sr. Task List By By Remark


No Whom When
01 Approach to the Site
02 Area for Labour camp, site office, storage of the materials like
Cement, reinforcement, structural steel should be drawn on the site
plan.
03 Water and electrical supply -- construction of temp water storage
tanks, panel board & requirement of G.I. pipes & fittings, electrical
wires and accessories etc. should be prepared.
04 Drawings: Sufficient drawings good for construction should be
available to start the work.
05 Security arrangement.
06 Mess for staff at site
07 Quarters or flats for staff
08 Vehicles required for the project.
09 Tools and plants required for the project.
10 Preparation of project bar chart.
11 Furniture required for site and staff quarters.
12 Material required for Labour camp.
13 Cash flow for the project work i.e. fund required every month to
complete the project on schedule time.
14 Schedule for release of Drawing for the project.
15 Schedule for requirement of materials like shuttering materials,
equipment and other facilities including customer-supplied
materials.
16 Labour requirement should be estimated and revised from time to
time. Advance planning should be done for procurement of skilled
workers like masons, carpenters, fitters, fabricators etc.
17 Appointment of specialised agency for waterproofing, plumbing,
road, structure steel, etc. should be planned.
18 Labour license should be obtained.
19 To arrange Insurance Policy -- CAR and Workmen Compensation
Policy
20 Sending stationery and blank report formats
21 If required, Permission for Blasting
22 Arrangement for Basic Raw Materials with Local Suppliers
Reviewed By Approved By Date