Length = 6 m
Width = 6 m
Area = 36 m²
Loads
Member spaced = 1.5 m
DL (Gratings) = 0.35 kN/m²
Mid Span = 0.53 kN/m
End Span = 0.26 kN/m
RCC Qty
Foundation Qty = 7 m³
Pedestal Qty = 1.56 m³
Bliding Concrete = 1.716 m³
Reinforcement = 1.0272 MT
Steel Qty
Grating Qty = 36 m²
Structural Steel = 2.8 MT
Support Reaction
Node L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 3 101 DL + L 10.523 48.165 0 0 0 -13.295
Min Fx 4 105 DL + L -13.073 49.089 0 0 0 18.323
Max Fy 4 105 DL + L -13.073 49.089 0 0 0 18.323
Min Fy 1 102 DL + W -1.859 2.241 0 0 0 4.155
Max Fz 1 101 DL + L 10.523 48.165 0 0 0 -13.295
Min Fz 1 103 DL + W 0.691 3.165 -3.45 -11.4 0.043 -0.873
Max Mx 1 101 DL + L 10.523 48.165 0 0 0 -13.295
Min Mx 1 103 DL + W 0.691 3.165 -3.45 -11.4 0.043 -0.873
Max My 1 103 DL + W 0.691 3.165 -3.45 -11.4 0.043 -0.873
Min My 2 103 DL + W -0.691 3.165 -3.45 -11.4 -0.043 0.873
Max Mz 4 105 DL + L -13.073 49.089 0 0 0 18.323
Min Mz 3 101 DL + L 10.523 48.165 0 0 0 -13.295
Type - 2
General
Length = 6 m
Width = 6 m
Area = 36 m²
Loads
Member spaced = 1 m
DL (Chequered Plate) = 0.6 kN/m²
Mid Span = 0.60 kN/m
End Span = 0.30 kN/m
RCC Qty
Foundation Qty = 7 m³
Pedestal Qty = 1.69 m³
Bliding Concrete = 1.716 m³
Reinforcement = 1.0428 MT
Steel Qty
Grating Qty = 36 m²
Structural Steel = 3.2 MT
Support Reaction
Node L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 3 101 DL + L 10.523 48.165 0 0 0 -13.295
Min Fx 4 105 DL + L -13.073 49.089 0 0 0 18.323
Max Fy 4 105 DL + L -13.073 49.089 0 0 0 18.323
Min Fy 1 102 DL + W -1.859 2.241 0 0 0 4.155
Max Fz 1 101 DL + L 10.523 48.165 0 0 0 -13.295
Min Fz 1 103 DL + W 0.691 3.165 -3.45 -11.4 0.043 -0.873
Max Mx 1 101 DL + L 10.523 48.165 0 0 0 -13.295
Min Mx 1 103 DL + W 0.691 3.165 -3.45 -11.4 0.043 -0.873
Max My 1 103 DL + W 0.691 3.165 -3.45 -11.4 0.043 -0.873
Min My 2 103 DL + W -0.691 3.165 -3.45 -11.4 -0.043 0.873
Max Mz 4 105 DL + L -13.073 49.089 0 0 0 18.323
Min Mz 3 101 DL + L 10.523 48.165 0 0 0 -13.295
Type - 3
General
Length = 6 m
Width = 6 m
Area = 36 m²
Loads
Member spaced = 2 m
Wt of Deck sheet = 0.076 kN/m²
Wt of Deck slab (125mm thick) = 3.125 kN/m²
Mid Span = 6.40 kN/m
End Span = 3.20 kN/m
RCC Qty
Foundation Qty = 8 m³
Pedestal Qty = 1.82 m³
Bliding Concrete = 1.936 m³
Reinforcement = 1.7184 MT
Slab Qty = 4.5 m³
Deck sheet = 36 m²
Steel Qty
Support Reaction
Node L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 3 101 DL + L 10.523 48.165 0 0 0 -13.295
Min Fx 4 105 DL + L -13.073 49.089 0 0 0 18.323
Max Fy 4 105 DL + L -13.073 49.089 0 0 0 18.323
Min Fy 1 102 DL + W -1.859 2.241 0 0 0 4.155
Max Fz 1 101 DL + L 10.523 48.165 0 0 0 -13.295
Min Fz 1 103 DL + W 0.691 3.165 -3.45 -11.4 0.043 -0.873
Max Mx 1 101 DL + L 10.523 48.165 0 0 0 -13.295
Min Mx 1 103 DL + W 0.691 3.165 -3.45 -11.4 0.043 -0.873
Max My 1 103 DL + W 0.691 3.165 -3.45 -11.4 0.043 -0.873
Min My 2 103 DL + W -0.691 3.165 -3.45 -11.4 -0.043 0.873
Max Mz 4 105 DL + L -13.073 49.089 0 0 0 18.323
Min Mz 3 101 DL + L 10.523 48.165 0 0 0 -13.295
Type - 1 T
Civil
Civil Civil
Civil
8 m³ 5700 45600
36 m² 750 27000
Strucutral Work