Type - 1 T

S.No Description Qty Unit Rate Amount S.No

1 Earth work excavation 27 m³ 0 1

2 Blidng Concrete 1.8 m³ 0 2

3 RCC - Footing 7 m³ 0 3

4 RCC - Pedestal m³ 0 4

5 Reinorement MT 0 5

6 Grating 36 m² 0 6

7 Structural Steel MT 0 7

Total Amount =

Area of the Building (m²) = 36

Rate per Sq.m = #VALUE!


Type - 2 Type - 3

Description Qty Unit Rate Amount S.No Description

Earth work excavation 27 m³ 0 1 Earth work excavation

Blidng Concrete 1.8 m³ 0 2 Blidng Concrete

RCC - Footing 7 m³ 0 3 RCC - Footing

RCC - Pedestal 4 RCC - Pedestal

Reinorement MT 0 5 Reinorement

Chequered Plate 36 m² 0 6 Deck Slab (125 thk)

Structural Steel MT 0 7 Deck sheet

Total Amount = 8 Structural Steel

Area of the Building (m²) = 36

Rate per Sq.m = #VALUE! Area of the Buildi


Type - 3

Qty Unit Rate Amount

27 m³ 0

1.8 m³ 0

7 m³ 0

MT 0

4.5 m³ 0

36 m² 0

MT 0

Total Amount =

Area of the Building (m²) = 36


Rate per Sq.m = #VALUE!