Revised BoQ (MCTLP) - Reviewed 02nov2021r1
Revised BoQ (MCTLP) - Reviewed 02nov2021r1
Quantity
Sl. No Desctiption of Towers Unit
DB DBR
1.1.1 Tension Tower DB
a.1) Basic tower Nos. 53.00 17.00
a.2) Total Stub Nos. 212.00 68.00
a.2.1) Normal Stub Nos. 199.00 65.00
a.2.2) +1m RC Nos. 10.00 1.00
a.2.3) +2m RC Nos. 2.00 2.00
a.2.4) +3m RC Nos. 1.00 -
a.2.5) +4m RC Nos. - -
a.2.6) +5m RC Nos. - -
a.2.7) +6m RC Nos. - -
b) -4.5 m Leg Extension Nos. - -
c) -3 m Leg Extension Nos. 3.00 2.00
d) -1.5 m Leg Extension Nos. 7.00 4.00
e) +/- 0 m Leg Extension Nos. 31.00 9.00
f) +1.5 m Leg Extension Nos. 10.00 4.00
g.1) +3 m Leg Extension with Basic Tower Body Nos. 7.00 5.00
g.2) +3 m Leg Extension with Normal Tower Body Nos. 26.00 6.00
h) +4.5 m Leg Extension Nos. 14.00 9.00
i) +6 m Leg Extension Nos. 45.00 12.00
j) +7.5 m Leg Extension Nos. 10.00 7.00
k) +9 m Leg Extension Nos. 57.00 10.00
0M LE SPARE Total
- 70.00
- 280.00
- 264.00
- 11.00
- 4.00
- 1.00
- -
- -
- -
- -
- 5.00
- 11.00
196.00 - 236.00
- 14.00
- 12.00
- 32.00
- 23.00
- 57.00
- 17.00
- 67.00
2.00 27.00
8.00 108.00
8.00 103.00
- 3.00
- 2.00
- -
- -
- -
- -
- -
- -
- 2.00
88.00 8.00 99.00
- 4.00
- 3.00
- 10.00
- 6.00
- 25.00
- 21.00
8.00 34.00
-
-
2.00 66.00
8.00 264.00
8.00 248.00
- 3.00
- 5.00
- 7.00
- 1.00
- -
- -
- -
- 1.00
- 7.00
191.00 8.00 232.00
- 8.00
- 16.00
- 33.00
- 51.00
- 23.00
- 17.00
4.00 47.00
- 12.00
12.00
-
2.00 22.00
8.00 88.00
8.00 71.00
- 3.00
- 7.00
- 5.00
- 2.00
- -
- 5.00
- -
68.00 8.00 78.00
1.00
4.00
15.00
16.00
8.00
6.00
8.00 31.00
-
-
- 7.00
- 28.00
- 28.00
- -
- -
- -
- -
- -
- -
- -
- 4.00
- -
4.00 - 8.00
- 4.00
- 12.00
- 4.00
- -
- -
- -
-
-
1.00 8.00
4.00 32.00
4.00 32.00
- -
- -
- -
- -
- -
- -
- 4.00
- -
- -
16.00 4.00 24.00
-
4.00
4.00
-
-
4.00 16.00
Date: 21/07/2021 A B C D A B C D
CP
Tower Body
Sl. No. New AP Down(+)/Rais Body Type Leg Extensions Raised Chimney Deflection Elevation Easting Northing
Type Extension
ed(-)
Revised as per Leg Profile
9 of Sheet 65
Date: 21/07/2021 A B C D A B C D
CP
Tower Body
Sl. No. New AP Down(+)/Rais Body Type Leg Extensions Raised Chimney Deflection Elevation Easting Northing
Type Extension
ed(-)
- - - - -
33 AP-43 DC 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 20 °
0 ' 12 " R 509.02 544,249.93 3,109,059.01
- - - - -
34 AP-43/1 DB 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 0 °
0 ' 3 " R 492.47 544,470.96 3,108,752.96
- - - - -
35 AP-44 DB 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 6 °
27 ' 36 " R 491.66 544,808.45 3,108,285.64
- - - - -
36 AP-45 DB 3.00 Normal 3N 3N 6.00 6.00 0.00 0.00 0.00 1.00 10 °
30 ' 10 " L 483.56 544,989.65 3,107,963.75
- - - - -
37 AP45/1 DB 3.00 Normal 3N 3N 4.50 4.50 0.00 0.00 0.00 0.00 0 °
0 ' 9 " R 484.65 545,147.06 3,107,775.35
- - - - -
38 AP-45/2 DB 3.00 Normal 4.50 4.50 3N 3N 0.00 0.00 0.00 0.00 0 °
0 ' 8 " L 461.09 545,455.32 3,107,406.37
- - - - -
39 AP46 DB 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 4 °
2 ' 58 " R 458.87 545,665.19 3,107,155.18
- - - - -
40 AP-46/1 DB 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 0 °
0 ' 4 " L 472.29 545,858.42 3,106,887.55
- - - - -
41 AP-47 DC 6.00 Normal 9.00 9.00 6.00 6.00 0.00 0.00 0.00 0.00 19 °
12 ' 32 " L 469.72 546,118.41 3,106,527.47
- - - - -
42 AP-47A DBR - Basic - - 1.50 1.50 0.00 0.00 0.00 0.00 8 °
58 ' 50 " R 499.60 546,329.72 3,106,379.73
- - - - -
43 AP-48 DCR 6.00 Normal 4.50 4.50 7.50 9.00 0.00 0.00 0.00 2.00 5 °
15 ' 39 " R 521.12 546,558.17 3,106,159.57
- - - - -
44 AP-48A DD 3.00 Normal 9.00 6.00 3N 3N 1.00 0.00 0.00 0.00 21 °
1 ' 5 " L 517.13 546,753.02 3,105,933.82
- - - - -
45 AP-48B DD 6.00 Normal 4.50 6.00 4.50 9.00 0.00 0.00 0.00 1.00 31 °
4 ' 56 " R 510.66 547,128.01 3,105,732.89
- - - - -
46 AP-48B/1 DBR 6.00 Normal 7.50 7.50 4.50 4.50 0.00 0.00 0.00 0.00 2 °
0 ' 38 " R 552.72 547,262.91 3,105,506.00
- - - - -
47 AP-49 DB 6.00 Normal 9.00 9.00 6.00 6.00 0.00 0.00 0.00 0.00 9 °
21 ' 51 " L 568.31 547,445.17 3,105,173.42
- - - - -
48 AP-50 DDR 3.00 Normal 3N 3N 3N 3N 0.00 0.00 0.00 0.00 43 °
8 ' 59 " L 576.61 547,578.44 3,105,003.38
- - - - -
49 AP-51 DD - Basic -1.5 0 0 0 0.00 0.00 0.00 0.00 5 °
26 ' 3 " L 510.05 547,846.71 3,104,962.03
- - - - -
50 AP-52 DD 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 46 °
6 ' 5 " R 490.26 548,208.61 3,104,940.99
- - - - -
51 AP-53 DD - Basic 0 0 0 0 0.00 0.00 0.00 0.00 21 °
12 ' 22 " R 504.96 548,430.52 3,104,681.81
- - - - -
52 AP-54 DD 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 23 °
29 ' 41 " L 517.00 548,562.25 3,104,306.97
- - - - -
53 AP-55 DD 4.50 2.00 Normal 4.50 4.50 9.00 9.00 0.00 0.00 0.00 0.00 16 °
24 ' 12 " L 567.75 548,831.33 3,104,017.00
- - - - -
54 AP-55A DD 4.50 0.50 Normal 7.50 7.50 4.50 4.50 0.00 0.00 0.00 0.00 33 °
27 ' 3 " R 581.59 549,126.39 3,103,841.54
- - - - -
55 AP-55B DD 4.50 Normal 4.50 4.50 4.50 4.50 0.00 0.00 0.00 0.00 7 °
41 ' 25 " R 634.81 549,285.29 3,103,513.00
- - - - -
56 AP-55C DDR 4.50 Normal 4.50 4.50 4.50 4.50 0.00 0.00 0.00 0.00 32 °
51 ' 19 " R 700.16 549,385.67 3,103,206.27
- - - - -
57 AP-55D DDR - Basic 0 0 1.5 3B 0.00 0.00 0.00 0.00 8 °
40 ' 10 " L 701.54 549,273.37 3,102,779.25
- - - - -
58 AP-55E DBR - Basic - - - - 0.00 0.00 0.00 0.00 8 °
0 ' 47 " L 609.79 549,239.16 3,102,457.27
- - - - -
59 AP-55F DD - Basic 0 0 0 0 0.00 0.00 0.00 0.00 45 °
16 ' 16 " R 574.85 549,248.26 3,102,189.76
- - - - -
60 AP-55G DB 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 2 °
15 ' 23 " R 563.68 549,023.34 3,101,951.28
- - - - -
61 AP-55H DC 7.50 Normal 7.50 7.50 9.00 9.00 0.00 0.00 0.00 0.00 16 °
26 ' 17 " R 560.38 548,770.08 3,101,703.09
- - - - -
62 AP-56 DC 7.50 Normal 9.00 7.50 6.00 9.00 0.00 0.00 0.00 0.00 16 °
19 ' 32 " R 553.34 548,423.92 3,101,519.17
- - - - -
63 AP-56A DB 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 1.00 1.00 10 °
10 ' 20 " R 557.59 548,043.71 3,101,440.73
- - - - -
64 AP-56B DC 9.00 Normal 9.00 9.00 6.00 7.50 0.00 0.00 0.00 1.00 19 °
40 ' 0 " L 534.30 547,592.69 3,101,429.04
- - - - -
65 AP-56C DDR 6.00 Normal 6.00 6.00 4.50 4.50 0.00 0.00 0.00 0.00 31 °
13 ' 53 " L 582.30 547,171.01 3,101,265.89
- - - - -
10 of Sheet 65
Date: 21/07/2021 A B C D A B C D
CP
Tower Body
Sl. No. New AP Down(+)/Rais Body Type Leg Extensions Raised Chimney Deflection Elevation Easting Northing
Type Extension
ed(-)
66 AP-56D DCR 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 25 °
59 ' 25 " R 515.90 546,895.69 3,100,908.60
- - - - -
67 AP-57 DD 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 35 °
15 ' 54 " L 465.13 546,554.95 3,100,739.51
- - - - -
68 AP-57A DB 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 1.00 0.00 5 °
45 ' 49 " L 460.14 546,346.10 3,100,352.32
- - - - -
69 AP-57B DB - Basic 3B 3B (1.50) (1.50) 1.00 1.00 0.00 0.00 3 °
2 ' 55 " R 447.87 546,195.68 3,099,990.58
- - - - -
70 AP-58 DD 6.00 Normal 9.00 9.00 4.50 4.50 0.00 0.00 0.00 0.00 31 °
21 ' 23 " L 457.13 546,062.07 3,099,712.06
- - - - -
71 AP-58A DB - Basic - - - - 0.00 0.00 0.00 0.00 12 °
37 ' 6 " R 455.58 546,086.55 3,099,468.05
- - - - -
72 AP-58B DD - Basic 3B 3B 3B 3B 0.00 0.00 0.00 0.00 42 °
7 ' 58 " R 447.79 546,048.08 3,099,149.59
- - - - -
73 AP-59 DB 4.50 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 2 °
35 ' 57 " L 440.31 545,833.50 3,098,963.21
- - - - -
74 AP-60 DCR 4.50 Normal 9.00 9.00 7.50 9.00 0.00 1.00 0.00 0.00 14 °
31 ' 22 " L 464.65 545,582.16 3,098,724.06
- - - - -
75 AP-61 DCR 3.00 Normal 7.50 3N 3N 6.00 0.00 0.00 0.00 0.00 21 °
11 ' 29 " L 493.56 545,422.56 3,098,467.64
- - - - -
76 AP-61A DD - Basic 0 1.5 0 0 0.00 0.00 0.00 0.00 49 °
29 ' 16 " R 499.02 545,384.93 3,098,268.65
- - - - -
77 AP-62 DC 9.00 1.00 Normal 9.00 7.50 7.50 9.00 0.00 0.00 0.00 0.00 15 °
26 ' 26 " L 489.26 544,993.18 3,098,044.26
- - - - -
78 AP-62/1 DB 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 0 °
0 ' 0 " L 490.86 544,738.90 3,097,787.80
- - - - -
79 AP-63 DB 3.00 Normal 4.50 7.50 3N 3N 0.00 0.00 0.00 0.00 4 °
44 ' 49 " R 491.45 544,515.31 3,097,562.30
- - - - -
80 AP-63A DB 3.00 Normal 7.50 9.00 3N 3N 0.00 0.00 0.00 0.00 4 °
42 ' 45 " L 486.75 544,330.93 3,097,404.84
- - - - -
81 AP-64 DB 6.00 Normal 9.00 9.00 3N 3N 2.00 0.00 0.00 0.00 6 °
27 ' 19 " L 479.67 544,212.46 3,097,285.50
- - - - -
82 AP-64A DB 9.00 2.00 Normal 9.00 7.50 3N 3N 1.00 0.00 0.00 0.00 4 °
30 ' 1 " L 467.25 543,911.32 3,096,904.67
- - - - -
83 AP-65 DBR 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 6 °
47 ' 3 " L 441.92 543,685.47 3,096,567.74
- - - - -
84 AP-66 DDR 4.50 Normal 9.00 9.00 3N 3N 0.00 0.00 0.00 0.00 40 °
9 ' 45 " L 590.74 543,446.66 3,096,100.07
- - - - -
85 AP-66/1 DBR 6.00 - Normal 9.00 6.00 3N 7.50 0.00 0.00 0.00 0.00 7 °
4 ' 33 " L 577.08 543,475.98 3,095,974.21
- - - - -
86 AP-66/2 DBR 4.50 Normal 3N 3N 6.00 7.50 0.00 0.00 0.00 0.00 0 °
0 ' 3 " R 539.35 543,553.52 3,095,763.34
- - - - -
87 AP-67 DC 6.00 Normal 6.00 6.00 6.00 7.50 0.00 0.00 0.00 0.00 27 °
34 ' 2 " L 467.79 543,685.64 3,095,403.99
- - - - -
88 AP-67/1 DB 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 0 °
0 ' 9 " L 466.89 543,920.16 3,095,191.00
- - - - -
89 AP-68 DD - Basic 3B 3B -1.5 0 0.00 0.00 0.00 0.00 36 °
57 ' 20 " R 475.46 544,148.60 3,094,983.55
- - - - -
90 AP-68A DB - Basic - - - - 0.00 0.00 0.00 0.00 0 °
0 ' 0 " R 465.00 544,198.43 3,094,722.38
- - - - -
91 AP-69 DD - Basic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42 °
51 ' 0 " L 460.85 544,241.94 3,094,494.31
- - - - -
92 AP-69/1 DB 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 0 °
0 ' 10 " L 448.90 544,469.64 3,094,326.75
- - - - -
93 AP-70 DD 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 35 °
15 ' 3 " R 455.60 544,663.55 3,094,184.07
- - - - -
94 AP-71 DC 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 19 °
26 ' 24 " L 442.97 544,789.85 3,093,804.47
- - - - -
95 AP-71/1 DB 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 0 °
0 ' 5 " L 428.05 545,010.96 3,093,519.86
- - - - -
96 AP-71/2 DB 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 0 °
0 ' 6 " R 420.72 545,228.60 3,093,239.73
- - - - -
97 AP-72 DB 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 7 °
29 ' 43 " L 417.44 545,469.83 3,092,929.22
- - - - -
98 AP-72/1 DB 7.50 Normal 6.00 7.50 9.00 9.00 0.00 0.00 0.00 0.00 0 °
0 ' 0 " R 410.52 545,757.83 3,092,644.60
- - - - -
99 AP-72/2 DB 3.00 Normal 3N 3N 4.50 4.50 0.00 0.00 0.00 0.00 0 °
0 ' 0 " R 414.10 545,986.02 3,092,419.09
11 of Sheet 65
Date: 21/07/2021 A B C D A B C D
CP
Tower Body
Sl. No. New AP Down(+)/Rais Body Type Leg Extensions Raised Chimney Deflection Elevation Easting Northing
Type Extension
ed(-)
- - - - -
100 AP-73 DC - Basic 0.00 0.00 1.50 1.50 0.00 0.00 0.00 0.00 21 °
29 ' 3 " R 404.06 546,192.38 3,092,215.15
- - - - -
101 AP-74 DCR - Basic 1.50 0.00 3B 1.50 0.00 0.00 0.00 0.00 16 °
48 ' 39 " L 402.72 546,355.50 3,091,846.25
- - - g -
102 AP-74A DB 6.00 Normal 6.00 7.50 9.00 6.00 0.00 0.00 0.00 0.00 2 °
58 ' 45 " R 366.98 546,610.00 3,091,550.00
- - - - -
103 AP-75 DCR 6.00 1.00 Normal 7.50 7.50 6.00 6.00 0.00 0.00 0.00 0.00 16 °
4 ' 10 " L 427.12 546,976.46 3,091,075.61
- - - - -
104 AP-76 DD - Basic -1.5 3B 3B -1.5 0.00 1.00 0.00 0.00 11 °
21 ' 51 " L 445.66 547,299.83 3,090,838.55
- - - - -
105 AP-76A DB 9.00 Normal 9.00 7.50 9.00 9.00 0.00 0.00 1.00 2.00 5 °
25 ' 58 " L 373.68 547,704.10 3,090,651.06
- - - - -
106 AP-77 DB 9.00 Normal 7.50 9.00 9.00 9.00 0.00 0.00 3.00 1.00 6 °
31 ' 47 " R 382.30 547,967.43 3,090,558.08
- - - - -
107 AP-78 DB 6.00 Normal 9.00 9.00 4.50 3N 0.00 1.00 0.00 0.00 7 °
36 ' 17 " L 396.04 548,363.68 3,090,365.01
- - - - -
108 AP-79 DCR 6.00 Normal 9.00 6.00 3N 3N 0.00 0.00 0.00 0.00 19 °
0 ' 28 " R 397.85 548,725.29 3,090,244.91
- - - - - Need to reconfirm
109 AP-80 MD 4.50 Normal 9.00 9.00 4.50 4.50 0.00 0.00 0.00 0.00 15 °
7 ' 43 " R 346.53 549,061.33 3,089,988.17 Need to reconfirm
- - - - -
110 AP-81 MD (4.50) Normal -4.50 -4.50 -4.50 -4.50 0.00 0.00 0.00 0.00 0 °
0 ' 0 " R 361.55 549,423.36 3,089,516.22
1 AP-0 DD - Basic -1.5 1.5 1.5 -1.5 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 371.63 549,575.64 3,089,459.36
- - - 0 0 0 0 0 0 0 - - -
2 AP-0A DC 6.00 Normal 6.00 7.50 7.50 6.00 0.00 0.00 0.00 0.00 25 ° 9 ' 51 " L 349.52 549,703.50 3,089,328.67
- - - 0 0 0 0 0 0 0 - - -
3 AP-0B DD 25.00 Normal 25.00 25.00 25.00 25.00 0.00 0.00 0.00 0.00 13 ° 16 ' 48 " R 337.57 550,069.30 3,089,192.15
- - - 0 0 0 0 0 0 0 - - -
4 AP-1 DDR 6.00 Normal 9.00 6.00 6.00 7.50 0.00 0.00 0.00 0.00 28 ° 16 ' 12 " L 394.50 550,341.95 3,089,010.01
- - - 0 0 0 0 0 0 0 - - -
5 AP-1A DD 4.50 Normal 6.00 7.50 4.50 3N 0.00 0.00 0.00 0.00 39 ° 25 ' 14 " R 381.40 550,728.00 3,088,973.00
- - - 0 0 0 0 0 0 0 - - -
6 AP-2 DCR 4.50 Normal 6.00 7.50 4.50 3N 0.00 0.00 0.00 0.00 26 ° 58 ' 26 " R 335.64 551,004.04 3,088,697.87
- - - 0 0 0 0 0 0 0 - - -
7 AP-2A DD 4.50 Normal 4.50 4.50 4.50 4.50 0.00 0.00 0.00 0.00 2 ° 49 ' 3 " L 315.01 551,078.01 3,088,471.97
- - - 0 0 0 0 0 0 0 - - -
8 AP-3 DDR 4.50 Normal 4.50 4.50 6.00 7.50 0.00 0.00 0.00 0.00 3 ° 49 ' 36 " L 399.60 551,225.00 3,088,088.00
- - - 0 0 0 0 0 0 0 - - -
9 AP-4 DDR 25.00 3.00 Normal 25.00 25.00 25.00 25.00 0.00 0.00 2.00 2.00 28 ° 22 ' 39 " R 415.13 551,405.30 3,087,697.34
- - - 0 0 0 0 0 0 0 - - -
10 AP-4A DDR 18.00 6.00 Normal 18.00 18.00 18.00 18.00 0.00 0.00 3.00 4.00 29 ° 37 ' 32 " L 469.91 551,393.00 3,087,502.00
- - - 0 0 0 0 0 0 0 - - -
11 AP-5 DDR 4.50 Normal 3N 3N 6.00 7.50 0.00 0.00 0.00 0.00 5 ° 41 ' 30 " L 697.84 551,651.59 3,086,972.34
- - - 0 0 0 0 0 0 0 - - -
12 AP-5A DC 7.50 Normal 7.50 7.50 7.50 7.50 0.00 0.00 0.00 0.00 10 ° 27 ' 48 " R 700.19 551,836.97 3,086,672.35
- - - 0 0 0 0 0 0 0 - - -
13 AP-6 DD 3.00 Normal 3N 3N 3N 3N 0.00 0.00 0.00 0.00 25 ° 58 ' 58 " L 785.37 552,037.00 3,086,158.00
- - - 0 0 0 0 0 0 0 - - -
14 AP-7 DBR (3.00) Basic - (1.50) 3B 3B 0.00 0.00 0.00 0.00 9 ° 39 ' 9 " R 845.36 552,313.00 3,085,902.72
- - - 0 0 0 0 0 0 0 - - -
15 AP-8 DBR - 1.00 Basic (1.50) 3B - (3.00) 0.00 0.00 0.00 0.00 8 ° 0 ' 34 " L 875.50 552,439.00 3,085,739.00
- - - 0 0 0 0 0 0 0 - - -
16 AP-9 DB - 0.50 Basic 3B 3B (3.00) (3.00) 0.00 0.00 0.00 0.00 13 ° 12 ' 4 " R 869.98 552,537.00 3,085,643.00
- - - 0 0 0 0 0 0 0 - - -
17 AP-10 DDSR (1.50) Basic -3 0 0 3B 0.00 0.00 0.00 0.00 32 ° 31 ' 52 " R 867.84 552,681.00 3,085,416.00
- - - 0 0 0 0 0 0 0 - - -
18 AP-10A DDSR 4.50 Normal 3N 6.00 9.00 4.50 0.00 0.00 0.00 0.00 38 ° 15 ' 11 " R 658.00 552,680.10 3,085,052.24
- - - 0 0 0 0 0 0 0 - - -
19 AP-11 DCR - Basic 3B -1.50 -1.50 3B 1.00 0.00 0.00 2.00 1 ° 28 ' 36 " R 817.63 552,241.80 3,084,499.14
- - - 0 0 0 0 0 0 0 - - -
20 AP-12 DDR 4.50 Normal 9.00 3N 4.50 7.50 0.00 0.00 0.00 0.00 7 ° 22 ' 26 " L 978.67 551,945.92 3,084,144.91
- - - 0 0 0 0 0 0 0 - - -
21 AP-13 DDSR 4.50 Normal 7.50 3N 3N 7.50 0.00 0.00 0.00 0.00 8 ° 37 ' 7 " L 1,114.18 551,775.70 3,083,877.69
- - - 0 0 0 0 0 0 0 - - -
22 AP-13/1 DB - Basic 1.50 1.50 (1.50) (1.50) 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " L 1,134.83 551,670.47 3,083,639.98
- - - 0 0 0 0 0 0 0 - - -
12 of Sheet 65
Date: 21/07/2021 A B C D A B C D
CP
Tower Body
Sl. No. New AP Down(+)/Rais Body Type Leg Extensions Raised Chimney Deflection Elevation Easting Northing
Type Extension
ed(-)
23 AP-14 DBR - Basic 3B 1.50 (1.50) - 0.00 0.00 0.00 0.00 1 ° 7 ' 0 " R 1,173.75 551,565.17 3,083,402.13
- - - 0 0 0 0 0 0 0 - - -
24 AP-14A DDR 3.00 3.00 Basic 3B 1.50 -1.50 0.00 0.00 0.00 0.00 0.00 5 ° 2 ' 2 " R 1,205.13 551,449.74 3,083,154.54
- - - 0 0 0 0 0 0 0 - - -
25 AP-14B DDSR 6.00 Normal 9.00 9.00 4.50 4.50 1.50 1.50 0.00 0.00 36 ° 17 ' 28 " R 1,301.35 551,316.93 3,082,924.78
- - - 0 0 0 0 0 0 0 - - -
26 AP-15 DDSR 3.00 Normal 9.00 3N 9.00 4.50 3.00 0.00 1.50 0.00 0 ° 58 ' 2 " R 1,392.47 551,011.53 3,082,790.85 0.00
- - - 0 0 0 0 0 0 0 - - -
27 AP-15A DDR - Basic -3 3B 3B 0 0.00 0.00 2.00 0.00 53 ° 21 ' 1 " L 1,316.24 550,800.81 3,082,702.65
- - - 0 0 0 0 0 0 0 - - -
28 AP-15B DBR - Basic 3B 1.50 (3.00) (1.50) 1.00 0.00 0.00 0.00 3 ° 29 ' 6 " L 1,319.99 550,696.78 3,082,283.45
- - - 0 0 0 0 0 0 0 - - -
29 AP-16 DDR 4.50 Normal 4.50 3N 7.50 9.00 0.00 0.00 0.00 3.00 54 ° 46 ' 37 " R 1,370.04 550,648.49 3,082,021.70
- - - 0 0 0 0 0 0 0 - - -
30 AP-16A DDSR 3.00 Normal 3N 4.50 9.00 6.00 0.00 0.00 3.00 0.00 17 ° 15 ' 9 " L 1,373.62 550,567.56 3,081,984.36
- - - 0 0 0 0 0 0 0 - - -
31 AP-17 DDR 18.00 5.00 Normal 18.00 18.00 18.00 18.00 0.00 0.00 3.00 0.00 32 ° 17 ' 25 " L 1,248.93 550,377.20 3,081,812.82
- - - 0 0 0 0 0 0 0 - - -
32 AP-17A DCR 4.50 Normal 3N 6.00 9.00 6.00 0.00 0.00 3.00 0.00 8 ° 48 ' 17 " L 908.97 550,155.83 3,081,024.58
- - - 0 0 0 0 0 0 0 - - -
33 AP-18 DD 18.00 4.50 Normal 18.00 18.00 18.00 18.00 0.00 0.00 0.00 4.50 11 ° 29 ' 25 " R 766.74 550,093.00 3,080,504.00
- - - 0 0 0 0 0 0 0 - - -
34 AP-19 DDR 9.00 2.00 Normal 7.50 9.00 6.00 9.00 0.00 0.00 0.00 0.00 31 ° 17 ' 7 " L 821.51 549,868.93 3,079,829.34
- - - 0 0 0 0 0 0 0 - - -
35 AP-20 DDSR (3.00) 1.00 Basic -3 3B -3 -3 0.00 0.00 0.00 0.00 3 ° 3 ' 55 " R 793.69 549,983.38 3,079,330.16
- - - 0 0 0 0 0 0 0 - - -
36 AP-20A DDSR 9.00 4.50 Normal 9.00 4.50 9.00 9.00 3.00 0.00 4.50 4.50 8 ° 17 ' 26 " R 652.47 550,021.60 3,079,109.94
- - - 0 0 0 0 0 0 0 - - -
37 AP-20B DDR 6.00 1.50 Normal 4.50 9.00 7.50 4.50 0.00 3.00 0.00 0.00 48 ° 13 ' 42 " R 502.08 550,030.43 3,078,785.38
- - - 0 0 0 0 0 0 0 - - -
38 AP-21 DDSR 6.00 3.00 Normal 3N 4.50 9.00 7.50 0.00 0.00 3.00 0.00 37 ° 44 ' 31 " L 357.73 549,649.72 3,078,426.26
- - - 0 0 0 0 0 0 0 - - -
39 AP-21A DDSR 4.50 - Normal 3N 4.50 7.50 4.50 0.00 0.00 0.00 0.00 28 ° 31 ' 16 " R 256.62 549,615.43 3,078,208.01
- - - 0 0 0 0 0 0 0 - - -
40 AP-21B DDSR 4.50 1.50 Normal 9.00 3N 3N 4.50 4.50 0.00 0.00 0.00 6 ° 27 ' 28 " R 327.94 549,294.64 3,077,789.19
- - - 0 0 0 0 0 0 0 - - -
41 AP-22 DDSR - 0.50 Basic 3B 1.5 -3 3B 3.00 0.00 0.00 0.00 0 ° 27 ' 3 " R 402.05 549,197.89 3,077,688.66
- - - 0 0 0 0 0 0 0 - - -
42 AP-22A DD 4.50 1.00 Normal 9.00 4.50 3B 4.50 0.00 0.00 0.00 0.00 47 ° 31 ' 26 " R 434.49 548,752.14 3,077,232.82
- - - 0 0 0 0 0 0 0 - - -
43 AP-22B DDR 6.00 Normal 9.00 4.50 4.50 9.00 0.00 0.00 0.00 0.00 41 ° 46 ' 17 " L 550.74 548,383.29 3,077,244.95
- - - 0 0 0 0 0 0 0 - - -
44 AP-22C DDSR 9.00 3.50 Normal 9.00 3N 4.50 9.00 3.00 0.00 0.00 6.00 25 ° 11 ' 9 " L 708.78 548,127.48 3,077,031.14 Raised Chimney is 6.0M
- - - 0 0 0 0 0 0 0 - - -
45 AP-23 DDSR 9.00 3.50 Normal 9.00 3N 9.00 9.00 3.00 0.00 0.00 6.00 0 ° 0 ' 0 " R 819.20 548,015.68 3,076,790.57 Raised Chimney is 6.0M
- - - 0 0 0 0 0 0 0 - - -
46 AP-23A DDSR 9.00 3.00 Normal 9.00 3N 4.50 9.00 0.00 0.00 0.00 4.50 18 ° 43 ' 57 " R 861.44 548,025.69 3,076,654.04
- - - 0 0 0 0 0 0 0 - - -
47 AP-24 DDSR 4.50 Normal 9.00 6.00 3N 6.00 0.00 0.00 0.00 0.00 33 ° 4 ' 27 " R 897.79 548,007.38 3,076,583.46
- - - 0 0 0 0 0 0 0 - - -
48 24/1 DDR 4.50 Normal 9.00 4.50 4.50 7.50 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 938.74 547,617.53 3,076,227.66
- - - 0 0 0 0 0 0 0 - - -
49 24/2 DDR 6.00 Normal 9.00 9.00 4.50 4.50 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 1,049.99 547,385.05 3,076,015.49
- - - 0 0 0 0 0 0 0 - - -
50 AP-25 DDR 4.50 Normal 7.50 3N 4.50 9.00 0.00 0.00 0.00 2.00 6 ° 40 ' 17 " L 1,091.00 547,287.00 3,075,926.00
- - - 0 0 0 0 0 0 0 - - -
51 AP-25A DDSR 3.00 Normal 6.00 9.00 3N 3N 0.00 0.00 0.00 0.00 4 ° 36 ' 24 " L 1,068.20 547,015.48 3,075,613.11
- - - 0 0 0 0 0 0 0 - - -
52 AP-26 DDSR 4.50 Normal 6.00 6.00 4.50 4.50 0.00 0.00 0.00 0.00 42 ° 17 ' 19 " L 1,002.50 546,919.26 3,075,482.21
- - - 0 0 0 0 0 0 0 - - -
53 AP-26A DDSR 4.50 1.00 Normal 7.50 9.00 6.00 9.00 0.00 0.00 0.00 4.50 3 ° 18 ' 42 " R 946.24 546,941.75 3,075,266.50
- - - 0 0 0 0 0 0 0 - - -
54 AP-27 DDSR 7.50 1.50 Normal 4.50 9.00 7.50 4.50 0.00 0.00 0.00 0.00 3 ° 24 ' 19 " R 483.68 546,971.98 3,074,610.90
- - - 0 0 0 0 0 0 0 - - -
55 AP-27A DDR 4.50 Normal 4.50 6.00 4.50 3N 0.00 0.00 0.00 0.00 1 ° 36 ' 12 " L 544.11 546,968.64 3,074,360.70
- - - 0 0 0 0 0 0 0 - - -
56 AP-28 DBR 4.50 Normal 4.50 7.50 6.00 4.50 0.00 0.00 0.00 0.00 3 ° 57 ' 32 " L 516.77 546,976.00 3,073,858.00
- - - 0 0 0 0 0 0 0 - - -
57 AP-29 DBR 4.50 Normal 6.00 6.00 3N 3N 0.00 0.00 0.00 0.00 3 ° 2 ' 38 " L 392.82 547,023.00 3,073,298.00
- - - 0 0 0 0 0 0 0 - - -
58 29/1 DDR 4.50 Normal 6.00 6.00 4.50 4.50 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 341.00 547,060.93 3,073,022.60
- - - 0 0 0 0 0 0 0 - - -
13 of Sheet 65
Date: 21/07/2021 A B C D A B C D
CP
Tower Body
Sl. No. New AP Down(+)/Rais Body Type Leg Extensions Raised Chimney Deflection Elevation Easting Northing
Type Extension
ed(-)
59 29/2 DBR 4.50 Normal 4.50 4.50 4.50 4.50 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 286.64 547,098.05 3,072,753.10
- - - 0 0 0 0 0 0 0 - - -
60 AP-30 DB 3.00 Basic - - 1.50 1.50 0.00 0.00 0.00 0.00 0 ° 44 ' 2 " R 279.34 547,180.00 3,072,158.00
- - - 0 0 0 0 0 0 0 - - -
61 30/1 DB 3.00 Normal 3N 3N 4.50 4.50 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " L 290.20 547,240.32 3,071,674.30
- - - 0 0 0 0 0 0 0 - - -
62 AP-30A DB 3.00 Normal 3N 3N 4.50 4.50 0.00 0.00 0.00 0.00 5 ° 12 ' 3 " R 291.88 547,289.01 3,071,283.80
- - - 0 0 0 0 0 0 0 - - -
63 30A/1 DB - Basic - - 1.50 1.50 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 291.34 547,300.89 3,070,926.80
- - - 0 0 0 0 0 0 0 - - -
64 AP-31 DD - Basic 0 0 3B 3B 0.00 0.00 0.00 0.00 31 ° 39 ' 3 " R 281.78 547,314.00 3,070,533.00
- - - 0 0 0 0 0 0 0 - - -
65 31/1 DB - Basic 1.50 1.50 - - 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " L 269.59 547,166.27 3,070,274.50
- - - 0 0 0 0 0 0 0 - - -
66 31/2 DB - Basic - - 1.50 1.50 0.00 0.00 0.00 0.00 0 ° 0 ' 1 " R 271.98 547,038.32 3,070,050.60
- - - 0 0 0 0 0 0 0 - - -
67 AP-31A DD - Basic 1.5 1.5 0 0 0.00 0.00 0.00 0.00 41 ° 21 ' 59 " R 272.67 546,922.68 3,069,848.17
- - - 0 0 0 0 0 0 0 - - -
68 AP-32 DB - Basic - - - - 0.00 0.00 0.00 0.00 6 ° 20 ' 18 " R 270.11 546,704.14 3,069,773.40
- - - 0 0 0 0 0 0 0 - - -
69 32/1 DB - Basic - - - - 0.00 0.00 0.00 0.00 0 ° 0 ' 7 " L 271.60 546,481.22 3,069,723.80
- - - 0 0 0 0 0 0 0 - - -
70 AP-33 DD - Basic 0 0 0 0 0.00 0.00 0.00 0.00 33 ° 38 ' 14 " L 265.94 546,209.63 3,069,663.29
- - - 0 0 0 0 0 0 0 - - -
71 33/1 DB - Basic - - - - 0.00 0.00 0.00 0.00 0 ° 0 ' 4 " L 271.33 545,976.05 3,069,419.80
- - - 0 0 0 0 0 0 0 - - -
72 33/2 DB - Basic - - - - 0.00 0.00 0.00 0.00 0 ° 0 ' 1 " R 267.81 545,753.90 3,069,188.22
- - - 0 0 0 0 0 0 0 - - -
73 AP-34 MD 3.00 Basic 3B 3B 3B 3B 0.00 0.00 0.00 0.00 21 ° 5 ' 4 " L 264.69 545,558.00 3,068,984.00
- - - 0 0 0 0 0 0 0 - - -
74 AP-34/1 MA 3 Basic 3B 3B 3B 3B 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " L 270.66 545,424.48 3,068,665.20
- - - 0 0 0 0 0 0 0 - - -
75 AP-34/2 MA 3 Basic 3B 3B 3B 3B 0.00 0.00 0.00 0.00 0 ° 0 ' 1 " R 275.39 545,308.43 3,068,388.11
- - - 0 0 0 0 0 0 0 - - -
76 AP-34/3 MA 0 Basic 0 0 0 0 0.00 0.00 0.00 0.00 0 ° 0 ' 1 " L 280.43 545,192.63 3,068,111.62
- - - 0 0 0 0 0 0 0 - - -
77 AP-34/4 MA 4.5 Normal 4.50 4.50 4.50 4.50 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 273.68 545,094.49 3,067,877.28
- - 0 0 0 0 0 0 0 - - -
78 AP-34/5 MD - Basic 0 0 0 0 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 252.68 544,978.46 3,067,600.23
- - - 0 0 0 0 0 0 0 - - -
79 AP-34/6 MA -3 Basic -3.00 -3.00 -3.00 -3.00 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " L 254.08 544,876.35 3,067,356.44
- - - 0 0 0 0 0 0 0 - - -
80 AP-34/7 MA 3 Basic 3B 3B 3B 3B 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 244.05 544,740.60 3,067,032.30
- - - 0 0 0 0 0 0 0 - - -
81 AP-34/8 MA 1.5 Basic 1.5 1.5 1.5 1.5 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " L 241.41 544,622.93 3,066,751.34
- - - 0 0 0 0 0 0 0 - - -
82 AP-34A MD 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 230.50 544,513.78 3,066,490.73
- - - 0 0 0 0 0 0 0 - - -
83 AP-35 MD 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 227.50 544,405.00 3,066,231.00
14 of Sheet 65
Schedule-1, Page 15 of 65
Revised BoQ
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
CIP Project Site including insurance, clearing, forwarding and transportaion to site (Excluding Taxes and Duties applicable in Nepal) Date: 02 November 2021
ICB-PMD-MCTLP–016/17-01
Schedule-1, Page 16 of 65
Revised BoQ
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
CIP Project Site including insurance, clearing, forwarding and transportaion to site (Excluding Taxes and Duties applicable in Nepal) Date: 02 November 2021
ICB-PMD-MCTLP–016/17-01
Schedule-1, Page 17 of 65
Revised BoQ
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
CIP Project Site including insurance, clearing, forwarding and transportaion to site (Excluding Taxes and Duties applicable in Nepal) Date: 02 November 2021
ICB-PMD-MCTLP–016/17-01
Schedule-1, Page 18 of 65
Revised BoQ
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
CIP Project Site including insurance, clearing, forwarding and transportaion to site (Excluding Taxes and Duties applicable in Nepal) Date: 02 November 2021
ICB-PMD-MCTLP–016/17-01
Schedule-1, Page 19 of 65
Revised BoQ
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
CIP Project Site including insurance, clearing, forwarding and transportaion to site (Excluding Taxes and Duties applicable in Nepal) Date: 02 November 2021
a) Suspension Assembly China Sets 30 US$ 30.00 900.00 - 23.00 - 690.00 7 210.00
b) Dead End Assembly China Sets 4 US$ 28.00 112.00 - - 4 112.00
c) Tension Assembly (For joint Box Location) China Sets 42 US$ 56.00 2,352.00 - 11.00 - 616.00 31 1,736.00
d) Pass through Assembly China Sets 125 US$ 48.00 6,000.00 49.00 2,352.00 174 8,352.00
Special Fitting Assembly at suspension tower (for joint box 34.00 - - 34.00
e) locations) China Sets 2 2
US$ 17.00
f) Vibration Damper China Sets 600 4,800.00 381.00 3,048.00 981 7,848.00
US$ 8.00
g) Down Lead Clamp assemblies China No. 646 3,876.00 - 554.00 - 3,324.00 92 552.00
US$ 6.00
ICB-PMD-MCTLP–016/17-01
Schedule-1, Page 20 of 65
Revised BoQ
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
CIP Project Site including insurance, clearing, forwarding and transportaion to site (Excluding Taxes and Duties applicable in Nepal) Date: 02 November 2021
ICB-PMD-MCTLP–016/17-01
Schedule-2, Page 21 of 65
Schedule No. 2: Plant and Equipment including Mandatory Spares Parts to be supplied from within Nepal including Type Test Charges
Date: 02 November 2021
NOT APPLICABLE
ICB-PMD-MCTLP–016/17-01
Schedule-3, Page 22 of 65
1 Tower Type DB, DC, DD, MA, DDspl., MD 1 Lot USD 50,000.00 50,000.00
ICB-PMD-MCTLP–016/17-01
Schedule-4 (a), Page 23 of 65
ICB-PMD-MCTLP–016/17-01
Schedule-4 (a), Page 24 of 65
ICB-PMD-MCTLP–016/17-01
Schedule-4 (a), Page 25 of 65
ICB-PMD-MCTLP–016/17-01
Schedule-4 (a), Page 26 of 65
ICB-PMD-MCTLP–016/17-01
Schedule-4 (a), Page 27 of 65
ICB-PMD-MCTLP–016/17-01
Schedule-4 (a), Page 28 of 65
(i) Normal Stretch (Double Ckt. Portion) kms 59 415,000.00 24,485,000.00 8.50 - 3,527,500.00 67.50 - 28,012,500.00
Normal Stretch (Multi Ckt. Portion, two circuit with TWIN HTLS & two circuit kms 7,680,000.00 - 4.87 - - 4,675,200.00 - 3,004,800.00
(ii) with TWIN ACSR Bison conductor) 8 960,000.00 3.13
- - - - - -
10 OPTIC FIBRE CABLING - - - - - -
A. OPGW cable & Accessories - - - - - -
(a) 24 Fibre (DWSM) OPGW fibre optic cable km 70 70,000.00 4,900,000.00 0.63 - 44,100.00 70.63 - 4,944,100.00
Installation Hardware set for above 24 Fibre OPGW Fibre Optic cabling km 1,050,000.00 - - - - 1,050,000.00
(b) including all cable fittings & accessories except joint box 70 15,000.00 70.00
(c ) Joint box (24 Fibres) No. 21 16,000.00 336,000.00 - 6.40 - - 102,336.00 14.60 - 233,664.00
B. FODP - - - - - -
FODP 48F : Indoor Type, rack mounted with FCPC coupling and pig tails 100,000.00 - - - - 100,000.00
(a) No. 4 25,000.00 4.00
C. Fibre Optic approach cable - - - - 0.00 - -
(a) 24 Fibre (DWSM) km 2 175,000.00 350,000.00 - - - 2.00 - 350,000.00
Installation hardware set for above 24 Fibre, Fibre Optic Approach Cable Sets 100,000.00 - - - - 100,000.00
(b) 2 50,000.00 2.00
- - - - - -
11 A) Installation of following items for aviation requirements - - - - - -
i) Span markers No. 20 12,500.00 250,000.00 - - - 20.00 - 250,000.00
ii) Obstruction lights (to be provided as per IS 5613) 0 - - - - 0.00 - -
a) 1 Medium + 2low intensity Sets 12 125,000.00 1,500,000.00 - - - 12.00 - 1,500,000.00
b) 1 Medium + 4low intensity Sets 8 225,000.00 1,800,000.00 - - - 8.00 - 1,800,000.00
- - - - 0.00 - -
B) Painting of towers MT 480 5,500.00 2,640,000.00 - - - 480.00 - 2,640,000.00
- - - - - -
12 Pile Foundation: - - - - - -
No. of Pile Foundation No. 1 - - - - 1.00 - -
Boring, providing and installation of bored Cast-in-situ RCC vertical piles of - - - - - -
specified diameter and of any length below the pile cap with M25 grade of
cement concrete, excluding the cost of supply & placing the reinforcement
steel but including the cost of boring with temporary Guide casing,
bentonite solution and the length of pile to be embeded in the pile cap
12.1 (length of pile for payment shall be measured from bottom of pile cap), all
necessary labour, materials, plants, tools & tackles etc.,complete,as
necessary for proper execution of the job. (Boring in weathered rock, shale,
fissured rock and soft rock excluded).
a) 1200mm diameter R.C.C.vertical bored pile upto 30 m from bottom of Meter 11,000,000.00 - - - - 11,000,000.00
pile cap. 500 22,000.00 500.00
ICB-PMD-MCTLP–016/17-01
Schedule-4 (a), Page 29 of 65
- - - - 0.00 - -
Excavation whereever required for pile cap /tie etc. (other than boring) for Cu.m. 7,000.00 - - - - 7,000.00
all depth and size, in all types of soils including disposal of excavated
materials for all lifts and leads,decent etc.as directed by Engineer - In -
12.3 charge,together with all labour,tools & tackles,sheeting, sheet 7 1,000.00 7.00
piling,dewatering etc. complete as required for proper execution of the job.
- - - - 0.00 - -
Back filling with available excavated earth for all leads and lifts in sides of Cu.m. 250.00 - - - - 250.00
foundations and other under ground facilities in horizontal layers not
12.4 exceeding 20 cm. in depth conso- lidating each deposited layer by ramming 1 250.00 1.00
and watering etc.
- - - - 0.00 - -
Form work for placing plain or reinforced cement concrete of any type Sq.m. 99,000.00 - - - - 99,000.00
including blockout and section at any elevation including all labour,
12.5 materials, equipments, waste for form, oring,shuttering,strutting,propping, 165 600.00 165.00
scaffolding,tieing,nailing, caulking, dismantling & removal of forms etc.
complete.
- - - - 0.00 - -
Supply and placing of steel reinforcement of specified grade for R.C.C. work M.T. 4,180,000.00 - - - - 4,180,000.00
12.6 in pile,pile cap, pedestal / chimney, tie beam (if required) including 38 110,000.00 38.00
straightening, cutting, bending, binding etc. all complete
- - - - 0.00 - -
Providing and laying in position M25 Grade concrete of specified 28 days Cu.m. 3,987,500.00 - - - - 3,987,500.00
strength for pile caps, pedestal/chimney and tie beam(if required),
excluding reinforcement steel and form work but including cement, all
necessary tools and tackles,labour, materials, equipments for
12.7 145 27,500.00 145.00
handling,transpor- tation, batching, mixing,placing, vibrating,dewatering etc.
all complete (excluding cost of concrete in piles which is included in item
no.12.1).
- - - - 0.00 - -
Providing and laying plain cement concrete 1:4:8 (1cement : 4 coarse sand: Cu.m. 105,000.00 - - - - 105,000.00
8 graded stone aggregate 40mm nominal size) including cement, all
12.8 necessary tools and tackles,labour, materials, equipments for 7 15,000.00 7.00
handling,transportation,mixing,placing, vibrating,dewatering etc.all
complete.
- - - - 0.00 - -
Conducting Standard Penetration Test (SPT) at various elevations in pile Nos. 4,800,000.00 - - - - 4,800,000.00
bore holes in all kind of soils including all labour, materials, tools and
12.9 tackles, equipments etc. required labour, materials, tools and tackles, 40 120,000.00 40.00
equipments etc. required for successful completion of the job.
- - - - 0.00 - -
Supply and Providing M.S. liner of 6mm. thick in piles upto 10m. Depth MT 2,610,000.00 - - - - 2,610,000.00
(maxm.) from bottom of pile cap, limited to the approved drawing, including
supply, straightening, bending, welding,all supports, labours, tools and
12.10 tackles, plants & equipments, with primer and paintinting etc. (complete) as 29 90,000.00 29.00
required for successful completion of the job
- - - - 0.00 - -
Conducting integrity test on pile using eloctronic control unit, hand held Nos. 800,000.00 - - - - 800,000.00
hammer, accelerometer, computer with required software to assess as-
12.11 installed pile characterestics including mobilisation of necessary manpower, 16 50,000.00 16.00
equipments,materials etc. required for successful completion of the job
- - - - 0.00 - -
13 Installation of following softwares - - - - 0.00 - -
i) PLS-CADD (multiuser license for 10 users- with individual keys) Set 1 - - 1.00 - 22,500.00 - 0.00 - -
ii) PLS-TOWER (multiuser license for 10 users- with individual keys) Set 1 - - 1.00 - 22,500.00 - 0.00 - -
- - - - 0.00 - -
Cost for supervision works to be imparted by the prinicipal Core - - - - - -
14 Manufacturer during the installation of HTLS conductor at site 0.00
i) Engineer Mdays 180 - - - - 180.00 216,000.00 -
ii) Supervisor Mdays 180 - - - - 180.00 90,000.00 -
- - - - -
TOTAL INSTALATION SERVICES (Total of column 7 and 9 to be carried
776,644,047.00 - 45,000.00 - 11,639,993.98 361,910.00 765,004,053.02
forward to Schedule No. 5: Grand Summary)
ICB-PMD-MCTLP–016/17-01
Schedule-4(b), Page 30 of 65
Sl. Description Item for which training is to be imparted. Country where Nos. of Training Total Training Charges
No. training is to be Trainee duration in
imparted days Currency# Rate per Total
trainee per day Training Charges
Training to Owners personnel on use & i) EHV Transmission Line Design using PLS CADD : 8 14 USD 800 89,600.00
application of the softwares ii) EHV Transmission Tower Design using PLS-Tower : 4 10 USD 800 32,000.00
Total for Training Charges (Total of 121,600.00
column 8 to be carried forward to
Schedule No. 5: Grand Summary)
Name of Bidder:
Signature of Bidder:
(Printed Name)
(Designation)
(Common Seal)
ICB-PMD-MCTLP–016/17-01
Schedule-4(c), Page 31 of 65
Name of Bidder:
Signature of Bidder:
(Printed Name)
(Designation)
(Common Seal)
ICB-PMD-MCTLP–016/17-01
Schedule-4(d), Page 32 of 65
TOTAL (Total of column 8 to be carried forward to Schedule No. 5: Grand Summary) 934,750.00
# Specify currency in accordance with BDS ITB Clause 19.1, Part-I of the Bidding Documents.
Name of Bidder:
Signature of Bidder:
(Printed Name)
(Designation)
(Common Seal)
ICB-PMD-MCTLP–016/17-01
Schedule-5, Page 33 of 65
Sl. No. Description Total Price Foreign Total Price Local Total Price Foreign Total Price Local Total Price Foreign Total Price Local
(USD) (NRS) (USD) (NRS) (USD) (NRS)
Name of Bidder:
Signature of Bidder:
(Printed Name)
(Designation)
(Common Seal)
ICB-PMD-MCTLP–016/17-01
Summary, Page 34 of 65
ICB-PMD-MCTLP–016/17-01
NEPAL ELECTRICITY AUTHORITY
220 KV UDIPUR - MARKICHOWK - BHARATPUR TRANSMISSION LINE
Line accessories - Quantity Eastimation
Date 21 June 2021
3.3 Tower acccessories : Phase Plate (set of three) Qty 420 Nos
D/C 186 twr x 2 ckt = 372 nos
M/C 12 twr x 4 ckt = 48 nos
Total = 420 Nos
(NEA Schedule = 420 Nos)
3.4 Tower acccessories : Circuit Plate (set of two) Qty 210 Nos
D/C 186 twr x 1 plt = 186 nos
M/C 12 twr x 2 plt = 24 nos
Total = 210 Nos
(NEA Schedule = 420 Nos)
3.6 Tower acccessories : Bird Guard (set of three) Qty 128 Nos
DD/DDR 3 PI x 65 twr = 195 nos
2 DE 6 PI x 2 DE twr = 12 nos
DDSR 3 PI x 22 twr = 66 nos
MD 24 PI x 6 twr =144 nos
No of Pilot Insulator =417 Nos
Bird guard = 420/3 per set =
Total = 140 Nos
(NEA Schedule = 90 Nos) 37.24032
4.3.2 Insulator : 160 kN Long rod Composite Insulator Qty 4608 Nos
DB/DBR 6 C/A x 2 sides x 2 insu x 70 twr = 1680 nos 1680
DC/DCR 6 C/A x 2 sides x 2 insu x 27 twr = 648 nos 648
DD/DDR/DDSR 6 C/A x 2 sides x 2 insu x 89 twr = 2160 nos 2136
MD 6 C/A x 2 sides x 2 insu x 6 twr =144 nos 144
Total = 4608 Nos
(NEA Schedule = 3684 Nos)
4.3.1 Insulator : 120 kN Long rod Composite Insulator Qty 612 Nos
DD 6 PI x 43 twr = 258 nos 258
DDR 6 PI x 24 twr = 144 nos 144
DDSR 6 PI x 23 twr =138 nos 138
MA 6 PI x 6 twr = 36 nos 36
MD 6 PI x 6 twr = 36 nos 36
Total = 612 Nos
(NEA Schedule = 678 Nos)
4.4.2 Single 'I' Suspension PILOT String (except clamps) Qty 570 Nos
DD 43 x 6 PI = 258 Nos 258 Nos
DDR 24 x 6 PI = 144 Nos 144 Nos
DDSR 22 x 6 PI = 132 Nos 132 Nos
MD 6 x 6 PI = 36 Nos 36 Nos
(NEA Schedule = 306 Nos)
4.4.3 Double Tension Insulator String (except clamps) Qty 2304 Nos
DB 53 x 12 = 636 Nos 636 Nos
DBR 17 x 12 = 204 Nos 204 Nos
DC 13 x 12 = 156 Nos 156 Nos
DCR 14 x 12 = 168 Nos 168 Nos
DD 43 x 12 = 516 Nos 516 Nos
DDR 24 x 12 = 288 Nos 288 Nos
DDSR 22 x 12 = 264 Nos 264 Nos
MD 6 x 12 = 72 Nos 72 Nos
(NEA Schedule = 1842Nos)
xiv) Conductor Accessories : Vibration Dampers for HTLS Qty 15812 Nos
D/C 604 Nos in one wire x 6 wires x 2 twin x 2 sides = 14496 nos
M/C 26 on one wire x 6 wires x 2 twin x 2 sides = 624 nos
Gantry D/C 6 nos ; M/C 6 nos = 12 nos
Total = 15132 Nos + 50 Extra = 15182 nos
(NEA Schedule = 8140 Nos)
xv) Conductor Accessories : Bundle Spacers for HTLS Qty 8483 Nos
D/C 64.295 km x 6 C/A x 20 per km = 7716 nos
M/C 2.984 km x 12 C/A x 20 per km = 717 nos
Total = 7716 Nos + 717 + 50 Extra = 8483 Nos
(NEA Schedule = 7236 Nos)
e) Special Fitting Assembly at suspension tower (for joint box locations) = 2 sets 2 Sets
(NEA schedule = 2)
f) Vibration Damper (NEA Schedule = 600 Sets
g) Down Lead Clamp Assembly (NEA Schedule = 646 Nos.)
iii) Joint Box (24 fibre) {NEA Schedule = 21 Nos.}
4.9.2 FODP
i) FODP 48F : Indoor type, rack mounted with FCPC coupling and pig tails (5 Mtrs each) 4 Nos
(NEA Schedule = 4 Nos)
Combined Combined
Description Weight DBR Weight
DB Weight Weight
Peak, X-Arm & CAGE-I 1,569.72 Peak, X-Arm & CAGE-I 1,666.55
CAGE-II 2,505.20 CAGE-II 2,598.85
TOP X-ARM 496.69 TOP X-ARM 547.22
MIDDLE X-ARM 529.17 MIDDLE X-ARM 579.78
BTM X-ARM 630.98 BTM X-ARM 659.96
BODY 3,302.03 BODY 3,320.82
G-G PLAN (BODY) 135.16 G-G PLAN (BODY) 134.88
TOTAL BASIC BODY 9,168.93 9,168.93 TOTAL BASIC BODY 9,508.06
-4.5M LE 357.64 1,430.55 -4.5M LE 357.64
-3.0M LE 465.86 1,863.42 -3.0M LE 465.86
-1.5M LE 598.69 2,394.78 -1.5M LE 620.30
0M LE 776.35 3,105.39 12,274.32 0M LE 774.758
+1.5M LE 889.54 3,558.16 +1.5M LE 889.54
+3.0M LE +3.0M LE
With Basic Body 1,056.63 4,226.51 With Basic Body 1,056.63
PLAN H-H 141.65 566.61 PLAN H-H 141.65 566.61
With Normal Body 388.44 530.10 With Normal Body 388.44 530.09
+4.5M LE 518.22 659.87 +4.5M LE 518.22 659.87
+6.0M LE 678.56 820.22 +6.0M LE 678.56 820.22
+7.5M LE 841.17 982.82 +7.5M LE 841.17 982.82
+9.0M LE 1,006.35 1,148.00 +9.0M LE 1,004.32 1,145.98
TOTAL WEIGHT UPTO +9.0M
WT Summary (DC/DCR)
Price of Stub
Sl. No. Tower Type Raised Chimney Weight of Stub as per Unit weight Total Price
masterlist
Price of Stub as
Sl. No. Tower Type Raised Chimney Weight of Stub Unit price Total Price
per masterlist
Combined
Description Weight Combined Weight Description Weight
DD DDR Weight
Peak, X-Arm & CAGE-I 1,839.81 1,839.812 Peak, X-Arm & CAGE-I 1,930.299 1,930.299
CAGE-II 5,315.68 5,315.679 CAGE-II 5,373.949 5,373.949
TOP X-ARM 694.48 694.480 TOP X-ARM 780.343 780.343
MIDDLE X-ARM 713.86 713.858 MIDDLE X-ARM 791.943 791.943
BTM X-ARM 941.74 941.736 BTM X-ARM 1,029.692 1,029.692
BODY 5,171.69 5,171.688 BODY 5,157.063 5,157.063
G-G PLAN (BODY) 162.32 162.324 H-H PLAN (BODY) 162.044 162.044
Hikmat:
TOTAL BASIC BODY 14,839.58 14,839.577 13,846.000 0.93 TOTAL BASIC BODY 15,225.333 15,225.333
Average Unit Price/Kg
-4.5M LE 516.59 516.585 -4.5M LE 515.695 515.695
-3.0M LE 693.15 693.150 -3.0M LE 692.081 692.081
-1.5M LE 892.76 892.759 -1.5M LE 891.510 891.510
+0M LE 1,155.62 1,155.616 0M LE 1,153.576 1,153.576
+1.5M LE 1,371.12 1,371.123 +1.5M LE 1,368.714 1,368.714
+3.0M LE Author: +3.0M LE
+3.0M LE (With Basic Body) 1,553.39 1,553.389 738.12 Unit Price of +3.0M LE With Basic Body 1,550.939 1,550.939
Plan H-H 193.85 775.40 combined with Basic Body Plan J-J 194.270 777.080
+3.0 m LE (With Normal Body) 597.24 791.088 With Normal Body 596.575 790.845
+4.5M LE 809.95 1,003.798 +4.5M LE 808.276 1,002.546
+6.0M LE 1,027.57 1,221.419 +6.0M LE 1,025.945 1,220.215
+7.5M LE 1,287.99 1,481.837 +7.5M LE 1,285.841 1,480.111
+9.0M LE 1,530.13 1,723.976 +9.0M LE 1,515.993 1,710.263
Plan R-R & View-N 1,975.92 Plan R-R & View-N 1,973.98
+18.0M LE 6,491.03 2,116.74 +18.0M LE 6,484.92 2,114.73
Plan S-S & View-P 2,461.99 Plan S-S & View-P 2,459.82
+25.0M LE 6,097.42 2,139.85 +25.0M LE 6,094.06 2,138.47
WT Summary (DD/DDR)
DDS Description Weight Combined Weight DDSR Description Weight Combined Weight
Peak, X-Arm & CAGE-I Peak, X-Arm & CAGE-I 2,181.097 2,181.097
CAGE-II CAGE-II 5,630.759 5,630.759
TOP X-ARM TOP X-ARM 975.924 975.924
MIDDLE X-ARM MIDDLE X-ARM 985.511 985.511
BTM X-ARM BTM X-ARM 1,259.803 1,259.803
BODY BODY 5,765.791 5,765.791
H-H PLAN (BODY) H-H PLAN (BODY) 199.896 199.896
Hikmat:
TOTAL BASIC BODY 15,503.38 15,503.38 14,835.00 0.96 TOTAL BASIC BODY 15,968.479 15,968.479
Average Unit Price/Kg
-4.5M LE 521.40 521.40 -4.5M LE 521.40 521.396
-3.0M LE 601.00 601.00 -3.0M LE 601.00 601.004
-1.5M LE 761.64 761.64 -1.5M LE 761.64 761.643
0M LE 965.77 965.77 0M LE 965.77 965.774
+1.5M LE 1,150.52 1,150.52 +1.5M LE 1,150.52 1,150.516
+3.0M LE +3.0M LE -
With Basic Body 1,316.66 1,316.66 With Basic Body 1,316.66 1,316.657
PLAN J-J 831.38 207.84 PLAN J-J 866.744 216.69
With Normal Body 866.42 1,074.26 829.07 With Normal Body 866.42 1,083.106
+4.5M LE 972.23 1,180.08 +4.5M LE 972.23 1,188.920
+6.0M LE 1,078.05 1,285.89 +6.0M LE 1,078.05 1,294.731
+7.5M LE 1,360.69 1,568.53 +7.5M LE 1,360.69 1,577.373
+9.0M LE 1,519.36 1,727.21 +9.0M LE 1,519.36 1,736.050
-
TOTAL WEIGHT UPTO +9.0M TOTAL WEIGHT UPTO +9.0M -
PLAN R-R (+18.0M) 764.48 PLAN R-R (+18.0M) 764.48
VIEW-N (+18.0M) 1,122.65 VIEW-N (+18.0M) 1,122.65
+18.0M LE 6,788.16 2,168.82 +18.0M LE 6,788.16 2,168.823
-
PLAN S-S (+25.0M) 1,371.07 PLAN S-S (+25.0M) 1,371.07
VIEW-P (+18.0M) 947.29 VIEW-P (+18.0M) 947.29
+25.0M LE 6,568.49 2,221.71 +25.0M LE 6,568.49 2,221.713
Weight Summary (MA)
Price of Stub
Sl. No. Tower Type Raised Chimney Weight of Stub as per Unit weight
masterlist
5 Conductor
a) HTLS Conductor KM 832.00 865.00
b) ACSR Bison Conductor KM 100.00 100.00
12.2.. FODP
a) FODP 48F : Indoor Type, rack mounted with FCPC coupling and pig No.
tails (5 mtrs each). 4.00 ?
49 193
DFR 6 8 14 29% 55.142857 55
FS 2 1 3 6% 11.816327 12
NDF 8 19 27 55% 106.34694 106
WFR 1 1 2% 3.9387755 4
WS 3 1 4 8% 15.755102 16
20 29 193
59
70
72
82
83
95
108
137
139
161
164
181
184
188
189
193