Calculation of Tower Quantity

Quantity
Sl. No Desctiption of Towers Unit
DB DBR
1.1.1 Tension Tower DB
a.1) Basic tower Nos. 53.00 17.00
a.2) Total Stub Nos. 212.00 68.00
a.2.1) Normal Stub Nos. 199.00 65.00
a.2.2) +1m RC Nos. 10.00 1.00
a.2.3) +2m RC Nos. 2.00 2.00
a.2.4) +3m RC Nos. 1.00 -
a.2.5) +4m RC Nos. - -
a.2.6) +5m RC Nos. - -
a.2.7) +6m RC Nos. - -
b) -4.5 m Leg Extension Nos. - -
c) -3 m Leg Extension Nos. 3.00 2.00
d) -1.5 m Leg Extension Nos. 7.00 4.00
e) +/- 0 m Leg Extension Nos. 31.00 9.00
f) +1.5 m Leg Extension Nos. 10.00 4.00
g.1) +3 m Leg Extension with Basic Tower Body Nos. 7.00 5.00
g.2) +3 m Leg Extension with Normal Tower Body Nos. 26.00 6.00
h) +4.5 m Leg Extension Nos. 14.00 9.00
i) +6 m Leg Extension Nos. 45.00 12.00
j) +7.5 m Leg Extension Nos. 10.00 7.00
k) +9 m Leg Extension Nos. 57.00 10.00

1.1.3 Tension Tower DC


a.1) Basic tower Nos. 11.00 14.00
a.2) Total Stub Nos. 44.00 56.00
a.2.1) Normal Stub Nos. 43.00 52.00
a.2.2) +1m RC Nos. 1.00 2.00
a.2.3) +2m RC Nos. - 2.00
a.2.4) +3m RC Nos. - -
a.2.5) +4m RC Nos. - -
a.2.6) +5m RC Nos. - -
a.2.7) +6m RC Nos. - -
b) -4.5 m Leg Extension Nos. -
c) -3 m Leg Extension Nos. -
d) -1.5 m Leg Extension Nos. 2.00
e) +/- 0 m Leg Extension Nos. 3.00
f) +1.5 m Leg Extension Nos. 4.00
g.1) +3 m Leg Extension with Basic Tower Body Nos. 3.00
g.2) +3 m Leg Extension with Normal Tower Body Nos. 10.00
h) +4.5 m Leg Extension Nos. 6.00
i) +6 m Leg Extension Nos. 25.00
j) +7.5 m Leg Extension Nos. 21.00
k) +9 m Leg Extension Nos. 26.00

1.1.3 Tension Tower DD


a.1) Basic tower Nos. 40.00 24.00
a.2) Total Stub Nos. 160.00 96.00
a.2.1) Normal Stub Nos. 153.00 87.00
a.2.2) +1m RC Nos. 3.00 -
a.2.3) +2m RC Nos. 1.00 4.00
a.2.4) +3m RC Nos. 3.00 4.00
a.2.5) +4m RC Nos. - 1.00
a.2.6) +5m RC Nos. -
a.2.7) +6m RC Nos. -
b) -4.5 m Leg Extension Nos. - -
c) -3 m Leg Extension Nos. - 1.00
d) -1.5 m Leg Extension Nos. 6.00 1.00
e) +/- 0 m Leg Extension Nos. 29.00 4.00
f) +1.5 m Leg Extension Nos. 6.00 2.00
g.1) +3 m Leg Extension with Basic Tower Body Nos. 12.00 4.00
g.2) +3 m Leg Extension with Normal Tower Body Nos. 19.00 14.00
h) +4.5 m Leg Extension Nos. 28.00 23.00
i) +6 m Leg Extension Nos. 13.00 10.00
j) +7.5 m Leg Extension Nos. 6.00 11.00
k) +9 m Leg Extension Nos. 29.00 14.00
l) +18 m Leg Extension Nos. 4.00 8.00
m) +25 m Leg Extension Nos. 8.00 4.00

1.1.4 Tension Tower DDR Special


a.1) Basic tower Nos. - 20.00
a.2) Total Stub Nos. - 80.00
a.2.1) Normal Stub Nos. - 63.00
a.2.2) +1.5m RC Nos. - 3.00
a.2.3) +3m RC Nos. - 7.00
a.2.4) +4.5m RC Nos. - 5.00
a.2.5) +6m RC Nos. - 2.00
b) -4.5 m Leg Extension Nos. -
c) -3 m Leg Extension Nos. 5.00
d) -1.5 m Leg Extension Nos. -
e) +/- 0 m Leg Extension Nos. 2.00
f) +1.5 m Leg Extension Nos. 1.00
g.1) +3 m Leg Extension with Basic Tower Body Nos. 4.00
g.2) +3 m Leg Extension with Normal Tower Body Nos. 15.00
h) +4.5 m Leg Extension Nos. 16.00
i) +6 m Leg Extension Nos. 8.00
j) +7.5 m Leg Extension Nos. 6.00
k) +9 m Leg Extension Nos. 23.00

1.1.5 Suspension Tower MA


a.1) Basic tower Nos. 7.00
a.2) Total Stub Nos. 28.00
a.2.1) Normal Stub Nos. 28.00
a.2.2) +1m RC Nos. -
a.2.3) +2m RC Nos. -
a.2.4) +3m RC Nos. -
a.2.5) +4m RC Nos. -
a.2.6) +5m RC Nos. -
a.2.7) +6m RC Nos. -
b) -4.5m Leg Extension Nos. -
c) -3 m Leg Extension Nos. 4.00
d) -1.5 m Leg Extension Nos. -
e) +/- 0 m Leg Extension Nos. 4.00
f) +1.5 m Leg Extension Nos. 4.00
g.1) +3 m Leg Extension with Basic Tower Body Nos. 12.00
h) +4.5m Leg Extension Nos. 4.00
i) +6 m Leg Extension Nos. -
j) +7.5m Leg Extension Nos. -
k) +9 m Leg Extension Nos. -

1.1.6 Tension Tower MD


a.1) Basic tower Nos. 7.00
a.2) Total Stub Nos. 28.00
a.2.1) Normal Stub Nos. 28.00
a.2.2) +1m RC Nos. -
a.2.3) +2m RC Nos. -
a.2.4) +3m RC Nos. -
a.2.5) +4m RC Nos. -
a.2.6) +5m RC Nos. -
a.2.7) +6m RC Nos. -
b) -4.5 m Leg Extension Nos. 4.00
c) -3 m Leg Extension Nos. -
d) -1.5 m Leg Extension Nos. -
e) +/- 0 m Leg Extension Nos. 4.00
f) +1.5 m Leg Extension Nos. -
g.1) +3 m Leg Extension with Basic Tower Body Nos. 4.00
h) +4.5 m Leg Extension Nos. 4.00
i) +6 m Leg Extension Nos. -
j) +7.5 m Leg Extension Nos. -
k) +9 m Leg Extension Nos. 12.00
Quantity

0M LE SPARE Total

- 70.00
- 280.00
- 264.00
- 11.00
- 4.00
- 1.00
- -
- -
- -
- -
- 5.00
- 11.00
196.00 - 236.00
- 14.00
- 12.00
- 32.00
- 23.00
- 57.00
- 17.00
- 67.00

2.00 27.00
8.00 108.00
8.00 103.00
- 3.00
- 2.00
- -
- -
- -
- -
- -
- -
- 2.00
88.00 8.00 99.00
- 4.00
- 3.00
- 10.00
- 6.00
- 25.00
- 21.00
8.00 34.00
-
-
2.00 66.00
8.00 264.00
8.00 248.00
- 3.00
- 5.00
- 7.00
- 1.00
- -
- -
- -
- 1.00
- 7.00
191.00 8.00 232.00
- 8.00
- 16.00
- 33.00
- 51.00
- 23.00
- 17.00
4.00 47.00
- 12.00
12.00

-
2.00 22.00
8.00 88.00
8.00 71.00
- 3.00
- 7.00
- 5.00
- 2.00
- -
- 5.00
- -
68.00 8.00 78.00
1.00
4.00
15.00
16.00
8.00
6.00
8.00 31.00
-
-
- 7.00
- 28.00
- 28.00
- -
- -
- -
- -
- -
- -
- -
- 4.00
- -
4.00 - 8.00
- 4.00
- 12.00
- 4.00
- -
- -
- -
-
-
1.00 8.00
4.00 32.00
4.00 32.00
- -
- -
- -
- -
- -
- -
- 4.00
- -
- -
16.00 4.00 24.00
-
4.00
4.00
-
-
4.00 16.00
Date: 21/07/2021 A B C D A B C D
CP
Tower Body
Sl. No. New AP Down(+)/Rais Body Type Leg Extensions Raised Chimney Deflection Elevation Easting Northing
Type Extension
ed(-)
Revised as per Leg Profile

1 AP-27 DD 3.00 Normal 3N 3N 3N 3N 0.00 0.00 0.00 0.00 0 °


0 ' 0 " R 660.44 541,952.91 3,118,322.38
- - - - -
2 AP-27A DDR 3.00 Normal 3N 3N 7.50 7.50 0.00 0.00 0.00 0.00 48 °
33 ' 35 " L 702.35 542,410.58 3,117,972.02
- - - - -
3 AP-28 DD 4.50 Normal 3N 6.00 9.00 6.00 0.00 0.00 0.00 0.00 11 °
50 ' 59 " R 659.74 542,611.68 3,118,011.56
- - - - -
4 AP-28A DD 25.00 Normal 25.00 25.00 25.00 25.00 0.00 0.00 0.00 0.00 33 °
49 ' 24 " R 629.98 543,054.89 3,118,005.95
- - - - -
5 AP-28B DD 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 41 °
5 ' 37 " R 628.64 543,176.15 3,117,922.46
- - - - -
6 AP-29 DB 3.00 Normal 6.00 3N 3N 3N 0.00 0.00 0.00 0.00 5 °
50 ' 23 " R 620.43 543,289.51 3,117,479.59
- - - - -
7 AP-30 DD 3.00 Normal 4.50 4.50 3N 3N 0.00 0.00 0.00 0.00 25 °
58 ' 10 " L 611.35 543,363.83 3,116,983.36
- - - - -
8 AP-31 DB 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 3 °
17 ' 29 " L 582.41 543,579.98 3,116,668.71
- - - - -
9 AP-31/1 DB 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 0 °
0 ' 0 " R 574.13 543,897.37 3,116,259.22
- - - - -
10 AP-32 DD - Basic 1.5 3B 0 0 0.00 0.00 0.00 0.00 36 °
20 ' 42 " R 601.25 544,060.44 3,116,048.83
- - - - -

11 DCR 3.00 Normal 0.00 0.00 0.00 0.00 13 °


30 ' 50 " R 637.25 544,073.50 3,115,527.09
AP-33 1.50 4.50 9.00 3N 9.00
- - - - -
12 AP-33A DBR 6.00 Normal 3N 4.50 9.00 7.50 0.00 0.00 0.00 0.00 0 °
55 ' 18 " L 650.58 544,033.23 3,115,338.94
- - - - -
13 AP-33B DB 6.00 Normal 7.50 7.50 6.00 4.50 0.00 0.00 0.00 0.00 7 °
52 ' 32 " L 639.41 543,950.76 3,114,920.85
- - - - -
14 AP-33C DB (3.00) Basic (1.50) 3B - (3.00) 0.00 0.00 0.00 0.00 6 °
19 ' 25 " L 653.58 543,937.31 3,114,686.38
- - - - -
15 AP-33D DCR 3.00 Normal 9.00 6.00 3N 4.50 0.00 0.00 0.00 0.00 26 °
58 ' 7 " R 661.77 543,959.11 3,114,275.95
- - - - -
16 AP-33E DBR 6.00 Normal 9.00 9.00 6.00 6.00 0.00 0.00 0.00 0.00 8 °
2 ' 44 " L 637.41 543,837.48 3,114,001.84
- - - - -
17 AP-33E/1 DCR 3.00 1.00 Normal 9.00 9.00 3N 3N 0.00 3.00 0.00 0.00 3 °
59 ' 13 " R 618.89 543,781.84 3,113,806.29
- - - - -
18 AP-34 DBR 6.00 Normal 9.00 9.00 7.50 6.00 0.00 2.00 0.00 0.00 4 °
2 ' 60 " R 569.47 543,673.49 3,113,506.48
- - - - -
19 AP-34A DB 6.00 Normal 6.00 4.50 6.00 6.00 0.00 0.00 0.00 0.00 5 °
0 ' 21 " L 537.51 543,448.36 3,112,998.91
- - - - -
20 AP-35 DD 3.00 Normal 9.00 9.00 3N 3N 2.00 0.00 0.00 0.00 32 °
9 ' 32 " R 548.13 543,346.49 3,112,701.60
- - - - -
21 AP-36 DD 6.00 Normal 4.50 4.50 9.00 9.00 0.00 0.00 3.00 3.00 27 °
15 ' 37 " L 555.47 543,119.74 3,112,518.46
- - - - -
22 AP-36A DD 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 27 °
45 ' 44 " L 521.86 542,871.05 3,111,954.93
- - - - -
23 AP-36A/1 DB - Basic (1.50) (1.50) 3B 3B 0.00 0.00 0.00 0.00 0 °
0 ' 2 " R 522.73 542,889.83 3,111,682.96
- - - - -
24 AP-37 DD 4.50 Normal 3N 3N 4.50 4.50 0.00 0.00 0.00 0.00 51 °
36 ' 14 " R 533.61 542,907.04 3,111,433.69
- - - - -
25 AP-37A DB 4.50 Normal 3N 3N 7.50 6.00 0.00 0.00 0.00 0.00 7 °
12 ' 14 " L 516.86 542,694.57 3,111,240.04
- - - - -
26 AP-37B DD 4.50 Normal 3N 4.50 7.50 9.00 0.00 0.00 0.00 0.00 53 °
4 ' 43 " L 514.22 542,549.74 3,111,070.18
- - - - -
27 AP-38 MD 4.50 3.50 Normal 4.50 4.50 9.00 9.00 0.00 0.00 0.00 0.00 26 °
37 ' 31 " L 522.59 542,634.07 3,110,693.80
- - - - -
28 AP-39 DD 6.00 Normal 7.50 7.50 4.50 4.50 0.00 0.00 0.00 0.00 0 °
38 ' 48 " R 535.41 542,934.16 3,110,326.54
- - - - -
29 AP-40 DB 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 7 °
55 ' 33 " L 531.14 543,183.47 3,110,014.31
- - - - -
30 AP-41 DBR 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 1 °
51 ' 37 " R 516.35 543,486.10 3,109,727.45
- - - - -
31 AP-41/1 DB 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 0 °
0 ' 5 " L 491.78 543,741.57 3,109,469.04
- - - - -
32 AP-42 DCR 6.00 Normal 4.50 7.50 9.00 7.50 0.00 0.00 0.00 0.00 11 °
9 ' 59 " L 511.49 543,937.04 3,109,271.33

9 of Sheet 65
Date: 21/07/2021 A B C D A B C D
CP
Tower Body
Sl. No. New AP Down(+)/Rais Body Type Leg Extensions Raised Chimney Deflection Elevation Easting Northing
Type Extension
ed(-)
- - - - -
33 AP-43 DC 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 20 °
0 ' 12 " R 509.02 544,249.93 3,109,059.01
- - - - -
34 AP-43/1 DB 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 0 °
0 ' 3 " R 492.47 544,470.96 3,108,752.96
- - - - -
35 AP-44 DB 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 6 °
27 ' 36 " R 491.66 544,808.45 3,108,285.64
- - - - -
36 AP-45 DB 3.00 Normal 3N 3N 6.00 6.00 0.00 0.00 0.00 1.00 10 °
30 ' 10 " L 483.56 544,989.65 3,107,963.75
- - - - -
37 AP45/1 DB 3.00 Normal 3N 3N 4.50 4.50 0.00 0.00 0.00 0.00 0 °
0 ' 9 " R 484.65 545,147.06 3,107,775.35
- - - - -
38 AP-45/2 DB 3.00 Normal 4.50 4.50 3N 3N 0.00 0.00 0.00 0.00 0 °
0 ' 8 " L 461.09 545,455.32 3,107,406.37
- - - - -
39 AP46 DB 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 4 °
2 ' 58 " R 458.87 545,665.19 3,107,155.18
- - - - -
40 AP-46/1 DB 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 0 °
0 ' 4 " L 472.29 545,858.42 3,106,887.55
- - - - -
41 AP-47 DC 6.00 Normal 9.00 9.00 6.00 6.00 0.00 0.00 0.00 0.00 19 °
12 ' 32 " L 469.72 546,118.41 3,106,527.47
- - - - -
42 AP-47A DBR - Basic - - 1.50 1.50 0.00 0.00 0.00 0.00 8 °
58 ' 50 " R 499.60 546,329.72 3,106,379.73
- - - - -
43 AP-48 DCR 6.00 Normal 4.50 4.50 7.50 9.00 0.00 0.00 0.00 2.00 5 °
15 ' 39 " R 521.12 546,558.17 3,106,159.57
- - - - -
44 AP-48A DD 3.00 Normal 9.00 6.00 3N 3N 1.00 0.00 0.00 0.00 21 °
1 ' 5 " L 517.13 546,753.02 3,105,933.82
- - - - -
45 AP-48B DD 6.00 Normal 4.50 6.00 4.50 9.00 0.00 0.00 0.00 1.00 31 °
4 ' 56 " R 510.66 547,128.01 3,105,732.89
- - - - -
46 AP-48B/1 DBR 6.00 Normal 7.50 7.50 4.50 4.50 0.00 0.00 0.00 0.00 2 °
0 ' 38 " R 552.72 547,262.91 3,105,506.00
- - - - -
47 AP-49 DB 6.00 Normal 9.00 9.00 6.00 6.00 0.00 0.00 0.00 0.00 9 °
21 ' 51 " L 568.31 547,445.17 3,105,173.42
- - - - -
48 AP-50 DDR 3.00 Normal 3N 3N 3N 3N 0.00 0.00 0.00 0.00 43 °
8 ' 59 " L 576.61 547,578.44 3,105,003.38
- - - - -
49 AP-51 DD - Basic -1.5 0 0 0 0.00 0.00 0.00 0.00 5 °
26 ' 3 " L 510.05 547,846.71 3,104,962.03
- - - - -
50 AP-52 DD 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 46 °
6 ' 5 " R 490.26 548,208.61 3,104,940.99
- - - - -
51 AP-53 DD - Basic 0 0 0 0 0.00 0.00 0.00 0.00 21 °
12 ' 22 " R 504.96 548,430.52 3,104,681.81
- - - - -
52 AP-54 DD 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 23 °
29 ' 41 " L 517.00 548,562.25 3,104,306.97
- - - - -
53 AP-55 DD 4.50 2.00 Normal 4.50 4.50 9.00 9.00 0.00 0.00 0.00 0.00 16 °
24 ' 12 " L 567.75 548,831.33 3,104,017.00
- - - - -
54 AP-55A DD 4.50 0.50 Normal 7.50 7.50 4.50 4.50 0.00 0.00 0.00 0.00 33 °
27 ' 3 " R 581.59 549,126.39 3,103,841.54
- - - - -
55 AP-55B DD 4.50 Normal 4.50 4.50 4.50 4.50 0.00 0.00 0.00 0.00 7 °
41 ' 25 " R 634.81 549,285.29 3,103,513.00
- - - - -
56 AP-55C DDR 4.50 Normal 4.50 4.50 4.50 4.50 0.00 0.00 0.00 0.00 32 °
51 ' 19 " R 700.16 549,385.67 3,103,206.27
- - - - -
57 AP-55D DDR - Basic 0 0 1.5 3B 0.00 0.00 0.00 0.00 8 °
40 ' 10 " L 701.54 549,273.37 3,102,779.25
- - - - -
58 AP-55E DBR - Basic - - - - 0.00 0.00 0.00 0.00 8 °
0 ' 47 " L 609.79 549,239.16 3,102,457.27
- - - - -
59 AP-55F DD - Basic 0 0 0 0 0.00 0.00 0.00 0.00 45 °
16 ' 16 " R 574.85 549,248.26 3,102,189.76
- - - - -
60 AP-55G DB 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 2 °
15 ' 23 " R 563.68 549,023.34 3,101,951.28
- - - - -
61 AP-55H DC 7.50 Normal 7.50 7.50 9.00 9.00 0.00 0.00 0.00 0.00 16 °
26 ' 17 " R 560.38 548,770.08 3,101,703.09
- - - - -
62 AP-56 DC 7.50 Normal 9.00 7.50 6.00 9.00 0.00 0.00 0.00 0.00 16 °
19 ' 32 " R 553.34 548,423.92 3,101,519.17
- - - - -
63 AP-56A DB 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 1.00 1.00 10 °
10 ' 20 " R 557.59 548,043.71 3,101,440.73
- - - - -
64 AP-56B DC 9.00 Normal 9.00 9.00 6.00 7.50 0.00 0.00 0.00 1.00 19 °
40 ' 0 " L 534.30 547,592.69 3,101,429.04
- - - - -
65 AP-56C DDR 6.00 Normal 6.00 6.00 4.50 4.50 0.00 0.00 0.00 0.00 31 °
13 ' 53 " L 582.30 547,171.01 3,101,265.89
- - - - -

10 of Sheet 65
Date: 21/07/2021 A B C D A B C D
CP
Tower Body
Sl. No. New AP Down(+)/Rais Body Type Leg Extensions Raised Chimney Deflection Elevation Easting Northing
Type Extension
ed(-)
66 AP-56D DCR 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 25 °
59 ' 25 " R 515.90 546,895.69 3,100,908.60
- - - - -
67 AP-57 DD 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 35 °
15 ' 54 " L 465.13 546,554.95 3,100,739.51
- - - - -
68 AP-57A DB 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 1.00 0.00 5 °
45 ' 49 " L 460.14 546,346.10 3,100,352.32
- - - - -
69 AP-57B DB - Basic 3B 3B (1.50) (1.50) 1.00 1.00 0.00 0.00 3 °
2 ' 55 " R 447.87 546,195.68 3,099,990.58
- - - - -
70 AP-58 DD 6.00 Normal 9.00 9.00 4.50 4.50 0.00 0.00 0.00 0.00 31 °
21 ' 23 " L 457.13 546,062.07 3,099,712.06
- - - - -
71 AP-58A DB - Basic - - - - 0.00 0.00 0.00 0.00 12 °
37 ' 6 " R 455.58 546,086.55 3,099,468.05
- - - - -
72 AP-58B DD - Basic 3B 3B 3B 3B 0.00 0.00 0.00 0.00 42 °
7 ' 58 " R 447.79 546,048.08 3,099,149.59
- - - - -
73 AP-59 DB 4.50 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 2 °
35 ' 57 " L 440.31 545,833.50 3,098,963.21
- - - - -
74 AP-60 DCR 4.50 Normal 9.00 9.00 7.50 9.00 0.00 1.00 0.00 0.00 14 °
31 ' 22 " L 464.65 545,582.16 3,098,724.06
- - - - -
75 AP-61 DCR 3.00 Normal 7.50 3N 3N 6.00 0.00 0.00 0.00 0.00 21 °
11 ' 29 " L 493.56 545,422.56 3,098,467.64
- - - - -
76 AP-61A DD - Basic 0 1.5 0 0 0.00 0.00 0.00 0.00 49 °
29 ' 16 " R 499.02 545,384.93 3,098,268.65
- - - - -
77 AP-62 DC 9.00 1.00 Normal 9.00 7.50 7.50 9.00 0.00 0.00 0.00 0.00 15 °
26 ' 26 " L 489.26 544,993.18 3,098,044.26
- - - - -
78 AP-62/1 DB 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 0 °
0 ' 0 " L 490.86 544,738.90 3,097,787.80
- - - - -
79 AP-63 DB 3.00 Normal 4.50 7.50 3N 3N 0.00 0.00 0.00 0.00 4 °
44 ' 49 " R 491.45 544,515.31 3,097,562.30
- - - - -
80 AP-63A DB 3.00 Normal 7.50 9.00 3N 3N 0.00 0.00 0.00 0.00 4 °
42 ' 45 " L 486.75 544,330.93 3,097,404.84
- - - - -
81 AP-64 DB 6.00 Normal 9.00 9.00 3N 3N 2.00 0.00 0.00 0.00 6 °
27 ' 19 " L 479.67 544,212.46 3,097,285.50
- - - - -
82 AP-64A DB 9.00 2.00 Normal 9.00 7.50 3N 3N 1.00 0.00 0.00 0.00 4 °
30 ' 1 " L 467.25 543,911.32 3,096,904.67
- - - - -
83 AP-65 DBR 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 6 °
47 ' 3 " L 441.92 543,685.47 3,096,567.74
- - - - -
84 AP-66 DDR 4.50 Normal 9.00 9.00 3N 3N 0.00 0.00 0.00 0.00 40 °
9 ' 45 " L 590.74 543,446.66 3,096,100.07
- - - - -
85 AP-66/1 DBR 6.00 - Normal 9.00 6.00 3N 7.50 0.00 0.00 0.00 0.00 7 °
4 ' 33 " L 577.08 543,475.98 3,095,974.21
- - - - -
86 AP-66/2 DBR 4.50 Normal 3N 3N 6.00 7.50 0.00 0.00 0.00 0.00 0 °
0 ' 3 " R 539.35 543,553.52 3,095,763.34
- - - - -
87 AP-67 DC 6.00 Normal 6.00 6.00 6.00 7.50 0.00 0.00 0.00 0.00 27 °
34 ' 2 " L 467.79 543,685.64 3,095,403.99
- - - - -
88 AP-67/1 DB 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 0 °
0 ' 9 " L 466.89 543,920.16 3,095,191.00
- - - - -
89 AP-68 DD - Basic 3B 3B -1.5 0 0.00 0.00 0.00 0.00 36 °
57 ' 20 " R 475.46 544,148.60 3,094,983.55
- - - - -
90 AP-68A DB - Basic - - - - 0.00 0.00 0.00 0.00 0 °
0 ' 0 " R 465.00 544,198.43 3,094,722.38
- - - - -
91 AP-69 DD - Basic 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42 °
51 ' 0 " L 460.85 544,241.94 3,094,494.31
- - - - -
92 AP-69/1 DB 6.00 Normal 6.00 6.00 6.00 6.00 0.00 0.00 0.00 0.00 0 °
0 ' 10 " L 448.90 544,469.64 3,094,326.75
- - - - -
93 AP-70 DD 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 35 °
15 ' 3 " R 455.60 544,663.55 3,094,184.07
- - - - -
94 AP-71 DC 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 19 °
26 ' 24 " L 442.97 544,789.85 3,093,804.47
- - - - -
95 AP-71/1 DB 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 0 °
0 ' 5 " L 428.05 545,010.96 3,093,519.86
- - - - -
96 AP-71/2 DB 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 0 °
0 ' 6 " R 420.72 545,228.60 3,093,239.73
- - - - -
97 AP-72 DB 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 7 °
29 ' 43 " L 417.44 545,469.83 3,092,929.22
- - - - -
98 AP-72/1 DB 7.50 Normal 6.00 7.50 9.00 9.00 0.00 0.00 0.00 0.00 0 °
0 ' 0 " R 410.52 545,757.83 3,092,644.60
- - - - -
99 AP-72/2 DB 3.00 Normal 3N 3N 4.50 4.50 0.00 0.00 0.00 0.00 0 °
0 ' 0 " R 414.10 545,986.02 3,092,419.09

11 of Sheet 65
Date: 21/07/2021 A B C D A B C D
CP
Tower Body
Sl. No. New AP Down(+)/Rais Body Type Leg Extensions Raised Chimney Deflection Elevation Easting Northing
Type Extension
ed(-)
- - - - -
100 AP-73 DC - Basic 0.00 0.00 1.50 1.50 0.00 0.00 0.00 0.00 21 °
29 ' 3 " R 404.06 546,192.38 3,092,215.15
- - - - -
101 AP-74 DCR - Basic 1.50 0.00 3B 1.50 0.00 0.00 0.00 0.00 16 °
48 ' 39 " L 402.72 546,355.50 3,091,846.25
- - - g -
102 AP-74A DB 6.00 Normal 6.00 7.50 9.00 6.00 0.00 0.00 0.00 0.00 2 °
58 ' 45 " R 366.98 546,610.00 3,091,550.00
- - - - -
103 AP-75 DCR 6.00 1.00 Normal 7.50 7.50 6.00 6.00 0.00 0.00 0.00 0.00 16 °
4 ' 10 " L 427.12 546,976.46 3,091,075.61
- - - - -
104 AP-76 DD - Basic -1.5 3B 3B -1.5 0.00 1.00 0.00 0.00 11 °
21 ' 51 " L 445.66 547,299.83 3,090,838.55
- - - - -
105 AP-76A DB 9.00 Normal 9.00 7.50 9.00 9.00 0.00 0.00 1.00 2.00 5 °
25 ' 58 " L 373.68 547,704.10 3,090,651.06
- - - - -
106 AP-77 DB 9.00 Normal 7.50 9.00 9.00 9.00 0.00 0.00 3.00 1.00 6 °
31 ' 47 " R 382.30 547,967.43 3,090,558.08
- - - - -
107 AP-78 DB 6.00 Normal 9.00 9.00 4.50 3N 0.00 1.00 0.00 0.00 7 °
36 ' 17 " L 396.04 548,363.68 3,090,365.01
- - - - -
108 AP-79 DCR 6.00 Normal 9.00 6.00 3N 3N 0.00 0.00 0.00 0.00 19 °
0 ' 28 " R 397.85 548,725.29 3,090,244.91
- - - - - Need to reconfirm
109 AP-80 MD 4.50 Normal 9.00 9.00 4.50 4.50 0.00 0.00 0.00 0.00 15 °
7 ' 43 " R 346.53 549,061.33 3,089,988.17 Need to reconfirm
- - - - -
110 AP-81 MD (4.50) Normal -4.50 -4.50 -4.50 -4.50 0.00 0.00 0.00 0.00 0 °
0 ' 0 " R 361.55 549,423.36 3,089,516.22

1 AP-0 DD - Basic -1.5 1.5 1.5 -1.5 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 371.63 549,575.64 3,089,459.36
- - - 0 0 0 0 0 0 0 - - -
2 AP-0A DC 6.00 Normal 6.00 7.50 7.50 6.00 0.00 0.00 0.00 0.00 25 ° 9 ' 51 " L 349.52 549,703.50 3,089,328.67
- - - 0 0 0 0 0 0 0 - - -
3 AP-0B DD 25.00 Normal 25.00 25.00 25.00 25.00 0.00 0.00 0.00 0.00 13 ° 16 ' 48 " R 337.57 550,069.30 3,089,192.15
- - - 0 0 0 0 0 0 0 - - -
4 AP-1 DDR 6.00 Normal 9.00 6.00 6.00 7.50 0.00 0.00 0.00 0.00 28 ° 16 ' 12 " L 394.50 550,341.95 3,089,010.01
- - - 0 0 0 0 0 0 0 - - -
5 AP-1A DD 4.50 Normal 6.00 7.50 4.50 3N 0.00 0.00 0.00 0.00 39 ° 25 ' 14 " R 381.40 550,728.00 3,088,973.00
- - - 0 0 0 0 0 0 0 - - -
6 AP-2 DCR 4.50 Normal 6.00 7.50 4.50 3N 0.00 0.00 0.00 0.00 26 ° 58 ' 26 " R 335.64 551,004.04 3,088,697.87
- - - 0 0 0 0 0 0 0 - - -
7 AP-2A DD 4.50 Normal 4.50 4.50 4.50 4.50 0.00 0.00 0.00 0.00 2 ° 49 ' 3 " L 315.01 551,078.01 3,088,471.97
- - - 0 0 0 0 0 0 0 - - -
8 AP-3 DDR 4.50 Normal 4.50 4.50 6.00 7.50 0.00 0.00 0.00 0.00 3 ° 49 ' 36 " L 399.60 551,225.00 3,088,088.00
- - - 0 0 0 0 0 0 0 - - -
9 AP-4 DDR 25.00 3.00 Normal 25.00 25.00 25.00 25.00 0.00 0.00 2.00 2.00 28 ° 22 ' 39 " R 415.13 551,405.30 3,087,697.34
- - - 0 0 0 0 0 0 0 - - -
10 AP-4A DDR 18.00 6.00 Normal 18.00 18.00 18.00 18.00 0.00 0.00 3.00 4.00 29 ° 37 ' 32 " L 469.91 551,393.00 3,087,502.00
- - - 0 0 0 0 0 0 0 - - -
11 AP-5 DDR 4.50 Normal 3N 3N 6.00 7.50 0.00 0.00 0.00 0.00 5 ° 41 ' 30 " L 697.84 551,651.59 3,086,972.34
- - - 0 0 0 0 0 0 0 - - -
12 AP-5A DC 7.50 Normal 7.50 7.50 7.50 7.50 0.00 0.00 0.00 0.00 10 ° 27 ' 48 " R 700.19 551,836.97 3,086,672.35
- - - 0 0 0 0 0 0 0 - - -
13 AP-6 DD 3.00 Normal 3N 3N 3N 3N 0.00 0.00 0.00 0.00 25 ° 58 ' 58 " L 785.37 552,037.00 3,086,158.00
- - - 0 0 0 0 0 0 0 - - -
14 AP-7 DBR (3.00) Basic - (1.50) 3B 3B 0.00 0.00 0.00 0.00 9 ° 39 ' 9 " R 845.36 552,313.00 3,085,902.72
- - - 0 0 0 0 0 0 0 - - -
15 AP-8 DBR - 1.00 Basic (1.50) 3B - (3.00) 0.00 0.00 0.00 0.00 8 ° 0 ' 34 " L 875.50 552,439.00 3,085,739.00
- - - 0 0 0 0 0 0 0 - - -
16 AP-9 DB - 0.50 Basic 3B 3B (3.00) (3.00) 0.00 0.00 0.00 0.00 13 ° 12 ' 4 " R 869.98 552,537.00 3,085,643.00
- - - 0 0 0 0 0 0 0 - - -
17 AP-10 DDSR (1.50) Basic -3 0 0 3B 0.00 0.00 0.00 0.00 32 ° 31 ' 52 " R 867.84 552,681.00 3,085,416.00
- - - 0 0 0 0 0 0 0 - - -
18 AP-10A DDSR 4.50 Normal 3N 6.00 9.00 4.50 0.00 0.00 0.00 0.00 38 ° 15 ' 11 " R 658.00 552,680.10 3,085,052.24
- - - 0 0 0 0 0 0 0 - - -
19 AP-11 DCR - Basic 3B -1.50 -1.50 3B 1.00 0.00 0.00 2.00 1 ° 28 ' 36 " R 817.63 552,241.80 3,084,499.14
- - - 0 0 0 0 0 0 0 - - -
20 AP-12 DDR 4.50 Normal 9.00 3N 4.50 7.50 0.00 0.00 0.00 0.00 7 ° 22 ' 26 " L 978.67 551,945.92 3,084,144.91
- - - 0 0 0 0 0 0 0 - - -
21 AP-13 DDSR 4.50 Normal 7.50 3N 3N 7.50 0.00 0.00 0.00 0.00 8 ° 37 ' 7 " L 1,114.18 551,775.70 3,083,877.69
- - - 0 0 0 0 0 0 0 - - -
22 AP-13/1 DB - Basic 1.50 1.50 (1.50) (1.50) 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " L 1,134.83 551,670.47 3,083,639.98
- - - 0 0 0 0 0 0 0 - - -

12 of Sheet 65
Date: 21/07/2021 A B C D A B C D
CP
Tower Body
Sl. No. New AP Down(+)/Rais Body Type Leg Extensions Raised Chimney Deflection Elevation Easting Northing
Type Extension
ed(-)
23 AP-14 DBR - Basic 3B 1.50 (1.50) - 0.00 0.00 0.00 0.00 1 ° 7 ' 0 " R 1,173.75 551,565.17 3,083,402.13
- - - 0 0 0 0 0 0 0 - - -
24 AP-14A DDR 3.00 3.00 Basic 3B 1.50 -1.50 0.00 0.00 0.00 0.00 0.00 5 ° 2 ' 2 " R 1,205.13 551,449.74 3,083,154.54
- - - 0 0 0 0 0 0 0 - - -
25 AP-14B DDSR 6.00 Normal 9.00 9.00 4.50 4.50 1.50 1.50 0.00 0.00 36 ° 17 ' 28 " R 1,301.35 551,316.93 3,082,924.78
- - - 0 0 0 0 0 0 0 - - -
26 AP-15 DDSR 3.00 Normal 9.00 3N 9.00 4.50 3.00 0.00 1.50 0.00 0 ° 58 ' 2 " R 1,392.47 551,011.53 3,082,790.85 0.00
- - - 0 0 0 0 0 0 0 - - -
27 AP-15A DDR - Basic -3 3B 3B 0 0.00 0.00 2.00 0.00 53 ° 21 ' 1 " L 1,316.24 550,800.81 3,082,702.65
- - - 0 0 0 0 0 0 0 - - -
28 AP-15B DBR - Basic 3B 1.50 (3.00) (1.50) 1.00 0.00 0.00 0.00 3 ° 29 ' 6 " L 1,319.99 550,696.78 3,082,283.45
- - - 0 0 0 0 0 0 0 - - -
29 AP-16 DDR 4.50 Normal 4.50 3N 7.50 9.00 0.00 0.00 0.00 3.00 54 ° 46 ' 37 " R 1,370.04 550,648.49 3,082,021.70
- - - 0 0 0 0 0 0 0 - - -
30 AP-16A DDSR 3.00 Normal 3N 4.50 9.00 6.00 0.00 0.00 3.00 0.00 17 ° 15 ' 9 " L 1,373.62 550,567.56 3,081,984.36
- - - 0 0 0 0 0 0 0 - - -
31 AP-17 DDR 18.00 5.00 Normal 18.00 18.00 18.00 18.00 0.00 0.00 3.00 0.00 32 ° 17 ' 25 " L 1,248.93 550,377.20 3,081,812.82
- - - 0 0 0 0 0 0 0 - - -
32 AP-17A DCR 4.50 Normal 3N 6.00 9.00 6.00 0.00 0.00 3.00 0.00 8 ° 48 ' 17 " L 908.97 550,155.83 3,081,024.58
- - - 0 0 0 0 0 0 0 - - -
33 AP-18 DD 18.00 4.50 Normal 18.00 18.00 18.00 18.00 0.00 0.00 0.00 4.50 11 ° 29 ' 25 " R 766.74 550,093.00 3,080,504.00
- - - 0 0 0 0 0 0 0 - - -
34 AP-19 DDR 9.00 2.00 Normal 7.50 9.00 6.00 9.00 0.00 0.00 0.00 0.00 31 ° 17 ' 7 " L 821.51 549,868.93 3,079,829.34
- - - 0 0 0 0 0 0 0 - - -
35 AP-20 DDSR (3.00) 1.00 Basic -3 3B -3 -3 0.00 0.00 0.00 0.00 3 ° 3 ' 55 " R 793.69 549,983.38 3,079,330.16
- - - 0 0 0 0 0 0 0 - - -
36 AP-20A DDSR 9.00 4.50 Normal 9.00 4.50 9.00 9.00 3.00 0.00 4.50 4.50 8 ° 17 ' 26 " R 652.47 550,021.60 3,079,109.94
- - - 0 0 0 0 0 0 0 - - -
37 AP-20B DDR 6.00 1.50 Normal 4.50 9.00 7.50 4.50 0.00 3.00 0.00 0.00 48 ° 13 ' 42 " R 502.08 550,030.43 3,078,785.38
- - - 0 0 0 0 0 0 0 - - -
38 AP-21 DDSR 6.00 3.00 Normal 3N 4.50 9.00 7.50 0.00 0.00 3.00 0.00 37 ° 44 ' 31 " L 357.73 549,649.72 3,078,426.26
- - - 0 0 0 0 0 0 0 - - -
39 AP-21A DDSR 4.50 - Normal 3N 4.50 7.50 4.50 0.00 0.00 0.00 0.00 28 ° 31 ' 16 " R 256.62 549,615.43 3,078,208.01
- - - 0 0 0 0 0 0 0 - - -
40 AP-21B DDSR 4.50 1.50 Normal 9.00 3N 3N 4.50 4.50 0.00 0.00 0.00 6 ° 27 ' 28 " R 327.94 549,294.64 3,077,789.19
- - - 0 0 0 0 0 0 0 - - -
41 AP-22 DDSR - 0.50 Basic 3B 1.5 -3 3B 3.00 0.00 0.00 0.00 0 ° 27 ' 3 " R 402.05 549,197.89 3,077,688.66
- - - 0 0 0 0 0 0 0 - - -
42 AP-22A DD 4.50 1.00 Normal 9.00 4.50 3B 4.50 0.00 0.00 0.00 0.00 47 ° 31 ' 26 " R 434.49 548,752.14 3,077,232.82
- - - 0 0 0 0 0 0 0 - - -
43 AP-22B DDR 6.00 Normal 9.00 4.50 4.50 9.00 0.00 0.00 0.00 0.00 41 ° 46 ' 17 " L 550.74 548,383.29 3,077,244.95
- - - 0 0 0 0 0 0 0 - - -
44 AP-22C DDSR 9.00 3.50 Normal 9.00 3N 4.50 9.00 3.00 0.00 0.00 6.00 25 ° 11 ' 9 " L 708.78 548,127.48 3,077,031.14 Raised Chimney is 6.0M
- - - 0 0 0 0 0 0 0 - - -
45 AP-23 DDSR 9.00 3.50 Normal 9.00 3N 9.00 9.00 3.00 0.00 0.00 6.00 0 ° 0 ' 0 " R 819.20 548,015.68 3,076,790.57 Raised Chimney is 6.0M
- - - 0 0 0 0 0 0 0 - - -
46 AP-23A DDSR 9.00 3.00 Normal 9.00 3N 4.50 9.00 0.00 0.00 0.00 4.50 18 ° 43 ' 57 " R 861.44 548,025.69 3,076,654.04
- - - 0 0 0 0 0 0 0 - - -
47 AP-24 DDSR 4.50 Normal 9.00 6.00 3N 6.00 0.00 0.00 0.00 0.00 33 ° 4 ' 27 " R 897.79 548,007.38 3,076,583.46
- - - 0 0 0 0 0 0 0 - - -
48 24/1 DDR 4.50 Normal 9.00 4.50 4.50 7.50 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 938.74 547,617.53 3,076,227.66
- - - 0 0 0 0 0 0 0 - - -
49 24/2 DDR 6.00 Normal 9.00 9.00 4.50 4.50 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 1,049.99 547,385.05 3,076,015.49
- - - 0 0 0 0 0 0 0 - - -
50 AP-25 DDR 4.50 Normal 7.50 3N 4.50 9.00 0.00 0.00 0.00 2.00 6 ° 40 ' 17 " L 1,091.00 547,287.00 3,075,926.00
- - - 0 0 0 0 0 0 0 - - -
51 AP-25A DDSR 3.00 Normal 6.00 9.00 3N 3N 0.00 0.00 0.00 0.00 4 ° 36 ' 24 " L 1,068.20 547,015.48 3,075,613.11
- - - 0 0 0 0 0 0 0 - - -
52 AP-26 DDSR 4.50 Normal 6.00 6.00 4.50 4.50 0.00 0.00 0.00 0.00 42 ° 17 ' 19 " L 1,002.50 546,919.26 3,075,482.21
- - - 0 0 0 0 0 0 0 - - -
53 AP-26A DDSR 4.50 1.00 Normal 7.50 9.00 6.00 9.00 0.00 0.00 0.00 4.50 3 ° 18 ' 42 " R 946.24 546,941.75 3,075,266.50
- - - 0 0 0 0 0 0 0 - - -
54 AP-27 DDSR 7.50 1.50 Normal 4.50 9.00 7.50 4.50 0.00 0.00 0.00 0.00 3 ° 24 ' 19 " R 483.68 546,971.98 3,074,610.90
- - - 0 0 0 0 0 0 0 - - -
55 AP-27A DDR 4.50 Normal 4.50 6.00 4.50 3N 0.00 0.00 0.00 0.00 1 ° 36 ' 12 " L 544.11 546,968.64 3,074,360.70
- - - 0 0 0 0 0 0 0 - - -
56 AP-28 DBR 4.50 Normal 4.50 7.50 6.00 4.50 0.00 0.00 0.00 0.00 3 ° 57 ' 32 " L 516.77 546,976.00 3,073,858.00
- - - 0 0 0 0 0 0 0 - - -
57 AP-29 DBR 4.50 Normal 6.00 6.00 3N 3N 0.00 0.00 0.00 0.00 3 ° 2 ' 38 " L 392.82 547,023.00 3,073,298.00
- - - 0 0 0 0 0 0 0 - - -
58 29/1 DDR 4.50 Normal 6.00 6.00 4.50 4.50 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 341.00 547,060.93 3,073,022.60
- - - 0 0 0 0 0 0 0 - - -

13 of Sheet 65
Date: 21/07/2021 A B C D A B C D
CP
Tower Body
Sl. No. New AP Down(+)/Rais Body Type Leg Extensions Raised Chimney Deflection Elevation Easting Northing
Type Extension
ed(-)
59 29/2 DBR 4.50 Normal 4.50 4.50 4.50 4.50 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 286.64 547,098.05 3,072,753.10
- - - 0 0 0 0 0 0 0 - - -
60 AP-30 DB 3.00 Basic - - 1.50 1.50 0.00 0.00 0.00 0.00 0 ° 44 ' 2 " R 279.34 547,180.00 3,072,158.00
- - - 0 0 0 0 0 0 0 - - -
61 30/1 DB 3.00 Normal 3N 3N 4.50 4.50 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " L 290.20 547,240.32 3,071,674.30
- - - 0 0 0 0 0 0 0 - - -
62 AP-30A DB 3.00 Normal 3N 3N 4.50 4.50 0.00 0.00 0.00 0.00 5 ° 12 ' 3 " R 291.88 547,289.01 3,071,283.80
- - - 0 0 0 0 0 0 0 - - -
63 30A/1 DB - Basic - - 1.50 1.50 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 291.34 547,300.89 3,070,926.80
- - - 0 0 0 0 0 0 0 - - -
64 AP-31 DD - Basic 0 0 3B 3B 0.00 0.00 0.00 0.00 31 ° 39 ' 3 " R 281.78 547,314.00 3,070,533.00
- - - 0 0 0 0 0 0 0 - - -
65 31/1 DB - Basic 1.50 1.50 - - 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " L 269.59 547,166.27 3,070,274.50
- - - 0 0 0 0 0 0 0 - - -
66 31/2 DB - Basic - - 1.50 1.50 0.00 0.00 0.00 0.00 0 ° 0 ' 1 " R 271.98 547,038.32 3,070,050.60
- - - 0 0 0 0 0 0 0 - - -
67 AP-31A DD - Basic 1.5 1.5 0 0 0.00 0.00 0.00 0.00 41 ° 21 ' 59 " R 272.67 546,922.68 3,069,848.17
- - - 0 0 0 0 0 0 0 - - -
68 AP-32 DB - Basic - - - - 0.00 0.00 0.00 0.00 6 ° 20 ' 18 " R 270.11 546,704.14 3,069,773.40
- - - 0 0 0 0 0 0 0 - - -
69 32/1 DB - Basic - - - - 0.00 0.00 0.00 0.00 0 ° 0 ' 7 " L 271.60 546,481.22 3,069,723.80
- - - 0 0 0 0 0 0 0 - - -
70 AP-33 DD - Basic 0 0 0 0 0.00 0.00 0.00 0.00 33 ° 38 ' 14 " L 265.94 546,209.63 3,069,663.29
- - - 0 0 0 0 0 0 0 - - -
71 33/1 DB - Basic - - - - 0.00 0.00 0.00 0.00 0 ° 0 ' 4 " L 271.33 545,976.05 3,069,419.80
- - - 0 0 0 0 0 0 0 - - -
72 33/2 DB - Basic - - - - 0.00 0.00 0.00 0.00 0 ° 0 ' 1 " R 267.81 545,753.90 3,069,188.22
- - - 0 0 0 0 0 0 0 - - -
73 AP-34 MD 3.00 Basic 3B 3B 3B 3B 0.00 0.00 0.00 0.00 21 ° 5 ' 4 " L 264.69 545,558.00 3,068,984.00
- - - 0 0 0 0 0 0 0 - - -
74 AP-34/1 MA 3 Basic 3B 3B 3B 3B 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " L 270.66 545,424.48 3,068,665.20
- - - 0 0 0 0 0 0 0 - - -
75 AP-34/2 MA 3 Basic 3B 3B 3B 3B 0.00 0.00 0.00 0.00 0 ° 0 ' 1 " R 275.39 545,308.43 3,068,388.11
- - - 0 0 0 0 0 0 0 - - -
76 AP-34/3 MA 0 Basic 0 0 0 0 0.00 0.00 0.00 0.00 0 ° 0 ' 1 " L 280.43 545,192.63 3,068,111.62
- - - 0 0 0 0 0 0 0 - - -
77 AP-34/4 MA 4.5 Normal 4.50 4.50 4.50 4.50 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 273.68 545,094.49 3,067,877.28
- - 0 0 0 0 0 0 0 - - -
78 AP-34/5 MD - Basic 0 0 0 0 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 252.68 544,978.46 3,067,600.23
- - - 0 0 0 0 0 0 0 - - -
79 AP-34/6 MA -3 Basic -3.00 -3.00 -3.00 -3.00 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " L 254.08 544,876.35 3,067,356.44
- - - 0 0 0 0 0 0 0 - - -
80 AP-34/7 MA 3 Basic 3B 3B 3B 3B 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 244.05 544,740.60 3,067,032.30
- - - 0 0 0 0 0 0 0 - - -
81 AP-34/8 MA 1.5 Basic 1.5 1.5 1.5 1.5 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " L 241.41 544,622.93 3,066,751.34
- - - 0 0 0 0 0 0 0 - - -
82 AP-34A MD 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 230.50 544,513.78 3,066,490.73
- - - 0 0 0 0 0 0 0 - - -
83 AP-35 MD 9.00 Normal 9.00 9.00 9.00 9.00 0.00 0.00 0.00 0.00 0 ° 0 ' 0 " R 227.50 544,405.00 3,066,231.00

14 of Sheet 65
Schedule-1, Page 15 of 65

NEPAL ELECTRICITY AUTHORITY


PROJECT MANAGEMENT DIRECTORATE
Marsyangdi Corridor 220 kV Transmission Line Project, Udipur-Markichowk-Bharatpur Section
Contract No. :- ICB-PMD-MCTLP-016/17-01

Revised BoQ
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
CIP Project Site including insurance, clearing, forwarding and transportaion to site (Excluding Taxes and Duties applicable in Nepal) Date: 02 November 2021

Final Quantity after After


Contract Amount Amended Quantity Remarks
Amendment
Country of
Item No. Item description
origin
FC
As per Contract
Unit Amount as per Bidding Amount as per Amount as per
Qty. Currency# Qty Qty
Unit Rate Quantity Bidding Quantity Bidding Quantity
1 2 3 4 5a 6 7 8a = (7) x (5a) 8b = (7) x (5a)
Design, fabrication & supply of following types of towers & tower
extension parts complete with stubs, step bolts, hangers, D-
1.1 shackles, bolts & nuts etc but excluding tower accessories such
as danger plates, number plates, phase plates, anti-climbing
devices
1.1.1 Suspension Tower DA
a.1) Basic tower India Nos. 21 US$ 6,230.70 130,844.70 - 21.00 - 130,844.70 0 -
a.2) Stub India Nos. 84 US$ 98.90 8,307.60 - 84.00 - 8,307.60 0 -
b) -4.5 m Leg Extension India Nos. 4 US$ 232.20 928.80 - 4.00 - 928.80 0 -
c) -3 m Leg Extension India Nos. 6 US$ 197.80 1,186.80 - 6.00 - 1,186.80 0 -
d) -1.5 m Leg Extension India Nos. 8 US$ 296.70 2,373.60 - 8.00 - 2,373.60 0 -
e) +/- 0 m Leg Extension India Nos. 30 US$ 296.70 8,901.00 - 30.00 - 8,901.00 0 -
f) +1.5 m Leg Extension India Nos. 8 US$ 395.60 3,164.80 - 8.00 - 3,164.80 0 -
g) +3 m Leg Extension India Nos. 28 US$ 494.50 13,846.00 - 28.00 - 13,846.00 0 -
h) +4.5 m Leg Extension India Nos. 2 US$ 593.40 1,186.80 - 2.00 - 1,186.80 0 -
i) +6 m Leg Extension India Nos. 12 US$ 692.30 8,307.60 - 12.00 - 8,307.60 0 -
j) +7.5 m Leg Extension India Nos. 2 US$ 791.20 1,582.40 - 2.00 - 1,582.40 0 -
k) +9 m Leg Extension India Nos. 8 US$ 890.10 7,120.80 - 8.00 - 7,120.80 0 -
l) +18 m Leg Extension India Nos. 3 US$ 1,483.50 4,450.50 - 3.00 - 4,450.50 0 -
m) +25 m Leg Extension India Nos. 3 US$ 2,076.90 6,230.70 - 3.00 - 6,230.70 0 -
- - - 0 -
1.1.2 Tension Tower DB - - - 0 -
a.1.1) Basic tower DB India Nos. 35 US$ 9,148.68 320,203.80 18.00 164,676.24 53 484,880.04
a.1.2) Basic tower DB (Reinforced) India Nos. 0 US$ 9,529.11 - 17.00 161,994.85 17 161,994.85
a.2.1) Normal Stub India Nos. 140 US$ 136.74 19,143.60 124.00 16,955.76 264 36,099.36
a.2.2) +1m RC India Nos. 0 US$ 204.04 - 11.00 2,244.49 11 2,244.49
a.2.3) +2m RC India Nos. 0 US$ 238.87 - 4.00 955.47 4 955.47
a.2.4) +3m RC India Nos. 0 US$ 273.69 - 1.00 273.69 1 273.69
a.2.5) +4m RC India Nos. 0 US$ 341.29 - - - 0 -
a.2.6) +5m RC India Nos. 0 US$ 376.12 - - - 0 -
a.2.7) +6m RC India Nos. 0 US$ 410.94 - - - 0 -
b) -4.5 m Leg Extension India Nos. 4 US$ 337.98 1,351.92 - 4.00 - 1,351.92 0 -
c) -3 m Leg Extension India Nos. 10 US$ 296.70 2,967.00 - 5.00 - 1,483.50 5 1,483.50
d) -1.5 m Leg Extension India Nos. 14 US$ 395.60 5,538.40 - 3.00 - 1,186.80 11 4,351.60
e) +/- 0 m Leg Extension India Nos. 88 US$ 494.50 43,516.00 148.00 73,186.00 236 116,702.00
f) +1.5 m Leg Extension India Nos. 14 US$ 692.30 9,692.20 - - 14 9,692.20
g.1) +3 m Leg Extension with Basic Tower Body India Nos. 10 US$ 791.20 7,912.00 2.00 1,582.40 12 9,494.40
g.2) +3 m Leg Extension with Normal Tower Body India Nos. 0 US$ 531.27 - 32.00 17,000.53 32 17,000.53
h) +4.5 m Leg Extension India Nos. 8 US$ 989.00 7,912.00 15.00 14,835.00 23 22,747.00
i) +6 m Leg Extension India Nos. 16 US$ 1,087.90 17,406.40 41.00 44,603.90 57 62,010.30
j) +7.5 m Leg Extension India Nos. 6 US$ 1,285.70 7,714.20 11.00 14,142.70 17 21,856.90
k) +9 m Leg Extension India Nos. 18 US$ 1,384.60 24,922.80 49.00 67,845.40 67 92,768.20
- - - -
1.1.3 Tension Tower DC - - - -

ICB-PMD-MCTLP–016/17-01
Schedule-1, Page 16 of 65

Contract No. :- ICB-PMD-MCTLP-016/17-01

Revised BoQ
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
CIP Project Site including insurance, clearing, forwarding and transportaion to site (Excluding Taxes and Duties applicable in Nepal) Date: 02 November 2021

Final Quantity after After


Contract Amount Amended Quantity Remarks
Amendment
Country of
Item No. Item description
origin
FC
As per Contract
Unit Amount as per Bidding Amount as per Amount as per
Qty. Currency# Qty Qty
Unit Rate Quantity Bidding Quantity Bidding Quantity
1 2 3 4 5a 6 7 8a = (7) x (5a) 8b = (7) x (5a)
a.1.1) Basic tower DC India Nos. 18 US$ 9,395.50 169,119.00 - 5.00 - 46,977.50 13 122,141.50
a.1.2) Basic tower DC (Reinforced) India Nos. 0 US$ 9,879.79 - 14.00 138,317.00 14 138,317.00
a.2.1) Normal Stub India Nos. 72 US$ 148.78 10,712.16 31.00 4,612.18 103 15,324.34
a.2.2) +1m RC India Nos. 0 US$ 235.45 - 3.00 706.36 3 706.36
a.2.3) +2m RC India Nos. 0 US$ 276.76 - 2.00 553.51 2 553.51
a.2.4) +3m RC India Nos. 0 US$ 318.06 - - - 0 -
a.2.5) +4m RC India Nos. 0 US$ 398.29 - - - 0 -
a.2.6) +5m RC India Nos. 0 US$ 439.59 - - - 0 -
a.2.7) +6m RC India Nos. 0 US$ 480.89 - - - 0 -
b) -4.5 m Leg Extension India Nos. 2 US$ 397.32 794.64 - 2.00 - 794.64 0 -
c) -3 m Leg Extension India Nos. 6 US$ 494.50 2,967.00 - 6.00 - 2,967.00 0 -
d) -1.5 m Leg Extension India Nos. 8 US$ 494.50 3,956.00 - 6.00 - 2,967.00 2 989.00
e) +/- 0 m Leg Extension India Nos. 44 US$ 593.40 26,109.60 55.00 32,637.00 99 58,746.60
f) +1.5 m Leg Extension India Nos. 4 US$ 989.00 3,956.00 - - 4 3,956.00
g.1) +3 m Leg Extension with Basic Tower Body India Nos. 8 US$ 1,186.80 9,494.40 - 5.00 - 5,934.00 3 3,560.40
g.2) +3 m Leg Extension with Normal Tower Body India Nos. 0 US$ 559.30 - 10.00 5,592.96 10 5,592.96
h) +4.5 m Leg Extension India Nos. 4 US$ 1,384.60 5,538.40 2.00 2,769.20 6 8,307.60
i) +6 m Leg Extension India Nos. 8 US$ 1,483.50 11,868.00 17.00 25,219.50 25 37,087.50
j) +7.5 m Leg Extension India Nos. 2 US$ 1,483.50 2,967.00 19.00 28,186.50 21 31,153.50
k) +9 m Leg Extension India Nos. 6 US$ 1,582.40 9,494.40 28.00 44,307.20 34 53,801.60
- - - -
1.1.4 Tension Tower DD - - - -
a.1.1) Basic tower DD India Nos. 75 US$ 13,846.00 1,038,450.00 - 33.00 - 456,918.00 42 581,532.00
a.1.2) Basic tower DD (Reinforced) India Nos. 0 US$ 14,205.93 - 24.00 340,942.27 24 340,942.27
a.2.1) Normal Stub India Nos. 300 US$ 255.42 76,626.00 - 52.00 - 13,281.84 248 63,344.16
a.2.2) +1m RC India Nos. 0 US$ 383.59 - 3.00 1,150.76 3 1,150.76
a.2.3) +2m RC India Nos. 0 US$ 441.98 - 5.00 2,209.89 5 2,209.89
a.2.4) +3m RC India Nos. 0 US$ 500.31 - 7.00 3,502.18 7 3,502.18
a.2.5) +4m RC India Nos. 0 US$ 621.16 - 1.00 621.16 1 621.16
a.2.6) +5m RC India Nos. 0 US$ 679.50 - - - 0 -
a.2.7) +6m RC India Nos. 0 US$ 737.83 - - - 0 -
b) -4.5 m Leg Extension India Nos. 8 US$ 553.84 4,430.72 - 8.00 - 4,430.72 0 -
c) -3 m Leg Extension India Nos. 14 US$ 494.50 6,923.00 - 13.00 - 6,428.50 1 494.50
d) -1.5 m Leg Extension India Nos. 30 US$ 494.50 14,835.00 - 23.00 - 11,373.50 7 3,461.50
e) +/- 0 m Leg Extension India Nos. 214 US$ 692.30 148,152.20 18.00 12,461.40 232 160,613.60
f) +1.5 m Leg Extension India Nos. 14 US$ 1,087.90 15,230.60 - 6.00 - 6,527.40 8 8,703.20
g.1) +3 m Leg Extension with Basic Tower Body India Nos. 20 US$ 1,186.80 23,736.00 - 4.00 - 4,747.20 16 18,988.80
g.2) +3 m Leg Extension with Normal Tower Body India Nos. 0 US$ 738.12 - 33.00 24,358.00 33 24,358.00
h) +4.5 m Leg Extension India Nos. 4 US$ 1,483.50 5,934.00 47.00 69,724.50 51 75,658.50
i) +6 m Leg Extension India Nos. 20 US$ 1,582.40 31,648.00 3.00 4,747.20 23 36,395.20
j) +7.5 m Leg Extension India Nos. 4 US$ 1,780.20 7,120.80 13.00 23,142.60 17 30,263.40
k) +9 m Leg Extension India Nos. 20 US$ 1,879.10 37,582.00 27.00 50,735.70 47 88,317.70
l) +18 m Leg Extension India Nos. 72 US$ 3,659.30 263,469.60 - 60.00 - 219,558.00 12 43,911.60
m) +25 m Leg Extension India Nos. 22 US$ 4,549.40 100,086.80 - 10.00 - 45,494.00 12 54,592.80
- - - -

ICB-PMD-MCTLP–016/17-01
Schedule-1, Page 17 of 65

Contract No. :- ICB-PMD-MCTLP-016/17-01

Revised BoQ
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
CIP Project Site including insurance, clearing, forwarding and transportaion to site (Excluding Taxes and Duties applicable in Nepal) Date: 02 November 2021

Final Quantity after After


Contract Amount Amended Quantity Remarks
Amendment
Country of
Item No. Item description
origin
FC
As per Contract
Unit Amount as per Bidding Amount as per Amount as per
Qty. Currency# Qty Qty
Unit Rate Quantity Bidding Quantity Bidding Quantity
1 2 3 4 5a 6 7 8a = (7) x (5a) 8b = (7) x (5a)
1.1.5 Tension Tower DD Special - - - -
a.1.1) Basic tower DDS India Nos. 11 US$ 14,835.00 163,185.00 - 11.00 - 163,185.00 0 -
a.1.2) Basic tower DDS (Reinforced) India Nos. 0 US$ 15,280.05 - 22.00 336,161.10 22 336,161.10
a.2.1) Normal Stub India Nos. 44 US$ 296.70 13,054.80 27.00 8,010.90 71 21,065.70
a.2.2) +1.5m RC India Nos. 0 US$ 422.40 - 3.00 1,267.20 3 1,267.20 Pro-Rata price has been interpolated
a.2.3) +3.0m RC India Nos. 0 US$ 512.88 - 7.00 3,590.19 7 3,590.19 Pro-Rata price has been interpolated
a.2.4) +4.5m RC India Nos. 0 US$ 668.42 - 5.00 3,342.10 5 3,342.10 Pro-Rata price has been interpolated
a.2.5) +6.0m RC India Nos. 0 US$ 758.87 - 2.00 1,517.75 2 1,517.75 Pro-Rata price has been interpolated
b) -4.5 m Leg Extension India Nos. 0 US$ 669.94 - - - 0 -
c) -3 m Leg Extension India Nos. 0 US$ 494.50 - 5.00 2,472.50 5 2,472.50
d) -1.5 m Leg Extension India Nos. 0 US$ 593.40 - - - 0 -
e) +/- 0 m Leg Extension India Nos. 44 US$ 692.30 30,461.20 34.00 23,538.20 78 53,999.40
f) +1.5 m Leg Extension India Nos. 0 US$ 1,087.90 - 1.00 1,087.90 1 1,087.90
g.1) +3 m Leg Extension with Basic Tower Body India Nos. 0 US$ 1,285.50 - 4.00 5,142.00 4 5,142.00
g.2) +3 m Leg Extension with Normal Tower Body India Nos. US$ 829.07 - 15.00 12,436.01 15 12,436.01 Pls Refer DDSR unit weight & unit price
h) +4.5 m Leg Extension India Nos. 0 US$ 1,582.40 - 16.00 25,318.40 16 25,318.40
i) +6 m Leg Extension India Nos. 0 US$ 1,681.30 - 8.00 13,450.40 8 13,450.40
j) +7.5 m Leg Extension India Nos. 0 US$ 1,978.00 - 6.00 11,868.00 6 11,868.00
k) +9 m Leg Extension India Nos. US$ 2,076.90 - 31.00 64,383.90 31 64,383.90
l) +18 m Leg Extension India Nos. 22 US$ 3,857.10 84,856.20 - 22.00 - 84,856.20 0 -
m) +25 m Leg Extension India Nos. 22 US$ 4,846.10 106,614.20 - 22.00 - 106,614.20 0 -
- - - -
1.1.6 Suspension Tower MA - - - -
a.1) Basic tower MA India Nos. 11 US$ 16,911.90 186,030.90 - 4.00 - 67,647.60 7 118,383.30
a.2) Stub India Nos. 44 US$ 210.70 9,270.80 - 16.00 - 3,371.20 28 5,899.60
b) -4.5m Leg Extension India Nos. 0 US$ 537.50 - - - 0 -
c) -3 m Leg Extension India Nos. 2 US$ 395.60 791.20 2.00 791.20 4 1,582.40
d) -1.5 m Leg Extension India Nos. 3 US$ 494.50 1,483.50 - 3.00 - 1,483.50 0 -
e) +/- 0 m Leg Extension India Nos. 24 US$ 593.40 14,241.60 - 16.00 - 9,494.40 8 4,747.20
f) +1.5 m Leg Extension India Nos. 3 US$ 989.00 2,967.00 1.00 989.00 4 3,956.00
g) +3 m Leg Extension India Nos. 12 US$ 1,087.90 13,054.80 - - 12 13,054.80
h) +4.5m Leg Extension India Nos. 0 US$ 1,285.70 - 4.00 5,142.80 4 5,142.80
i) +6 m Leg Extension India Nos. 12 US$ 1,483.50 17,802.00 - 12.00 - 17,802.00 0 -
j) +7.5m Leg Extension India Nos. 0 US$ 1,483.50 - - - 0 -
k) +9 m Leg Extension India Nos. 3 US$ 1,582.40 4,747.20 - 3.00 - 4,747.20 0 -
- - - -
1.1.7 Tension Tower MD - - - -
a.1) Basic tower MD India Nos. 15 US$ 34,367.75 515,516.25 - 7.00 - 240,574.25 8 274,942.00
a.2) Normal Stub India Nos. 60 US$ 519.44 31,166.40 - 28.00 - 14,544.32 32 16,622.08
b) -4.5 m Leg Extension India Nos. 8 US$ 1,285.70 10,285.60 - 4.00 - 5,142.80 4 5,142.80
c) -3 m Leg Extension India Nos. 8 US$ 1,681.30 13,450.40 - 8.00 - 13,450.40 0 -
d) -1.5 m Leg Extension India Nos. 32 US$ 1,879.10 60,131.20 - 32.00 - 60,131.20 0 -
e) +/- 0 m Leg Extension India Nos. 8 US$ 2,274.70 18,197.60 16.00 36,395.20 24 54,592.80
f) +1.5 m Leg Extension India Nos. 4 US$ 2,670.30 10,681.20 - 4.00 - 10,681.20 0 -
g) +3 m Leg Extension India Nos. 0 US$ 2,868.10 - 4.00 11,472.40 4 11,472.40

ICB-PMD-MCTLP–016/17-01
Schedule-1, Page 18 of 65

Contract No. :- ICB-PMD-MCTLP-016/17-01

Revised BoQ
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
CIP Project Site including insurance, clearing, forwarding and transportaion to site (Excluding Taxes and Duties applicable in Nepal) Date: 02 November 2021

Final Quantity after After


Contract Amount Amended Quantity Remarks
Amendment
Country of
Item No. Item description
origin
FC
As per Contract
Unit Amount as per Bidding Amount as per Amount as per
Qty. Currency# Qty Qty
Unit Rate Quantity Bidding Quantity Bidding Quantity
1 2 3 4 5a 6 7 8a = (7) x (5a) 8b = (7) x (5a)
h) +4.5 m Leg Extension India Nos. 38 US$ 3,362.60 127,778.80 - 34.00 - 114,328.40 4 13,450.40
i) +6 m Leg Extension India Nos. 0 US$ 3,659.30 - - - 0 -
j) +7.5 m Leg Extension India Nos. 19 US$ 3,956.00 75,164.00 - 19.00 - 75,164.00 0 -
k) +9 m Leg Extension India Nos. 0 US$ 4,450.50 - 16.00 71,208.00 16 71,208.00
- - - -
2 Supply of Earthing of towers - - - -
i. Pipe Type India Nos. 133 US$ 50.00 6,650.00 - 23.00 - 1,150.00 110 5,500.00
ii. Counterpoise Type India Nos. 53 US$ 120.00 6,360.00 45.00 5,400.00 98 11,760.00
- - - 0 -
3 Supply of following tower accessories - - - 0 -
i. Danger Plate India Nos. 186 US$ 20.00 3,720.00 15.00 300.00 201 4,020.00
ii. Number Plate India Nos. 186 US$ 20.00 3,720.00 15.00 300.00 201 4,020.00
iii. Phase Plate ( Set of three) India Sets 420 US$ 20.00 8,400.00 10.00 200.00 430 8,600.00
iv. Circuit Plate(Set of two) India Sets 420 US$ 20.00 8,400.00 10.00 200.00 430 8,600.00
v. Anti climbimg device India Nos. 186 US$ 20.00 3,720.00 15.00 300.00 201 4,020.00
vi. Bird Guard(set of three) India Sets 90 US$ 20.00 1,800.00 12.00 240.00 102 2,040.00
- - - 0 -
4 Supply of following Line Materials - - - 0 -
4.1 GS Earthwire - - - 0 -
i) 7/3.35mm Earthwire India KM 70 US$ 780.00 54,600.00 5.00 3,900.00 75 58,500.00
- - - 0 -
4.2 Conductor - - - 0 -
i) HTLS Conductor India KM 832 US$ 10,516.37 8,749,619.84 68.00 715,113.16 900 9,464,733.00
ii) ACSR Bison Conductor India KM 100 US$ 2,685.00 268,500.00 - - 100 268,500.00
- - - 0 -
4.3 Insulators for 220kV line with HTLS Conductor - - - 0 -
A. Option-1: Composite Insulators - - - 0 -
(i) 120kN Composite Long Rod Insulator China Nos 678 US$ 58.00 39,324.00 - 309.00 - 17,922.00 369 21,402.00
(ii 160kN Composite Long Rod Insulator China Nos 3684 US$ 74.00 272,616.00 960.00 71,040.00 4644 343,656.00
- - - 0 -
B Option-2: Disc Insulators - - - 0 -
i) 120kN Disc Insulator Nos - - - 0 -
ii) 160kN Disc Insulator Nos - - - 0 -
- - - 0 -
4.4 Hardware Fittings suitable for HTLS conductor - - - 0 -
i) Double "I" Suspension Insulator String (except clamps) France Sets 186 US$ 154.41 28,720.26 - 142.00 - 21,926.22 44 6,794.04
ii) Single 'I' Suspension PILOT String (except clamps) France Sets 306 US$ 150.00 45,900.00 - 27.00 - 4,050.00 279 41,850.00
iii) Double Tension Insulator String (except clamps) France Sets 1842 US$ 213.24 392,788.08 480.00 102,355.20 2322 495,143.28
- - - 0 -
4.5 Clamps for Hardware fittings suitable for HTLS conductor - - - 0 -
i) Suspension clamp suitable for suspension insulator strings France Sets 372 US$ 18.38 6,837.36 - 282.00 - 5,183.16 90 1,654.20
Suspension clamp suitable for suspension pilot insulator strings 13,047.84 - 51.30 - 1,093.72 11,954.12
ii) France Sets 612 561
US$ 21.32
iii) Dead end clamp for tension insulator string France Sets 3684 US$ 18.38 67,711.92 960.00 17,644.80 4644 85,356.72
- - - 0 -

ICB-PMD-MCTLP–016/17-01
Schedule-1, Page 19 of 65

Contract No. :- ICB-PMD-MCTLP-016/17-01

Revised BoQ
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
CIP Project Site including insurance, clearing, forwarding and transportaion to site (Excluding Taxes and Duties applicable in Nepal) Date: 02 November 2021

Final Quantity after After


Contract Amount Amended Quantity Remarks
Amendment
Country of
Item No. Item description
origin
FC
As per Contract
Unit Amount as per Bidding Amount as per Amount as per
Qty. Currency# Qty Qty
Unit Rate Quantity Bidding Quantity Bidding Quantity
1 2 3 4 5a 6 7 8a = (7) x (5a) 8b = (7) x (5a)
4.6 Insulators for 220kV ckts with Twin ACSR Bison - - - 0 -
A. Option-1: Composite Insulators - - - 0 -
(i) 120kN Composite Long Rod Insulator China Nos 168 US$ 58.00 9,744.00 - 108.00 - 6,264.00 60 3,480.00
(ii 160kN Composite Long Rod Insulator China Nos 360 US$ 74.00 26,640.00 - 234.00 - 17,316.00 126 9,324.00
- - - 0 -
B Option-2: Disc Insulators - - - 0 -
i) 120kN Disc Insulator Nos - - - 0 -
ii) 160kN Disc Insulator Nos - - - 0 -
- - - 0 -
4.7 Hardware Fittings suitable for Twin Bison conductor - - - 0 -
Single "I" Suspension Insulator String with necessary clamps 11,765.88 - 19.00 - 3,548.44 8,217.44
i) India Sets 63 44
US$ 186.76
ii) Double Tension Insulator String with necessary clamps India Sets 180 US$ 250.00 45,000.00 - 117.00 - 29,250.00 63 15,750.00
iii) Single 'I' Suspension PILOT String with necessary clamps India Sets 42 US$ 186.76 7,843.92 - 26.00 - 4,855.76 16 2,988.16
- - - 0 -
4.8 Conductor and Earthwire Accessories - - - 0 -
i) Mid span compression joint for HTLS conductor France Nos 508 US$ 9.56 4,856.48 - 358.00 - 3,422.48 150 1,434.00
ii) Mid span compression joint for ACSR Bison conductor India Nos 61 US$ 9.56 583.16 - 51.00 - 487.56 10 95.60
iii) Mid span compression joint for 7/3.35mm GS earthwire India Nos 41 US$ 2.79 114.39 - 4.00 - 11.16 37 103.23
iv) Repair Sleeve for HTLS conductor France Nos 153 US$ 4.56 697.68 - 83.00 - 378.48 70 319.20
v) Repair Sleeve for ACSR Bison conductor India Nos 19 US$ 4.56 86.64 1.00 4.56 20 91.20
vi) Flexible Copper Bond for 7/3.35mm GS Earthwire India Nos 376 US$ 3.68 1,383.68 48.00 176.64 424 1,560.32
vii) Vibration Damper for for 7/3.35mm GS Earthwire India Nos 752 US$ 6.62 4,978.24 588.00 3,892.56 1340 8,870.80
viii) Vibration Damper for ACSR Bison conductor India Nos 932 US$ 13.97 13,020.04 - 378.00 - 5,280.66 554 7,739.38
ix) Rigid Spacer for HTLS conductor France Nos 2722 US$ 11.18 30,431.96 - 1,320.00 - 14,757.60 1402 15,674.36
x) Rigid Spacer for ACSR Bison conductor India Nos 303 US$ 11.18 3,387.54 - 224.00 - 2,504.32 79 883.22
xi) Bundle Spacer for ACSR Bison conductor India Nos 945 US$ 15.44 14,590.80 - 616.00 - 9,511.04 329 5,079.76
xii) Earthwire Suspension Clamp India Nos 37 US$ 15.44 571.28 - 27.00 - 416.88 10 154.40
xiii) Earthwire Tension Clamp India Nos 303 US$ 11.03 3,342.09 102.00 1,125.06 405 4,467.15
xiv ) Vibration Damper for HTLS conductor France Nos 8140 US$ 13.97 113,715.80 - 8,140.00 - 113,715.80 0 -
xv) Spacer Damper for HTLS conductor France Nos 7236 US$ 15.44 111,723.84 1,660.00 25,630.40 8896 137,354.24
- - - 0 -
4.9 Supply of Fibre Cable & Accessories - - - 0 -
- - - 0 -
4.9.1 OPGW cable & Accessories - - - 0 -
i) 24 Fibre (DWSM) OPGW fibre optic cable China km 70 US$ 1,559.00 109,130.00 7.00 10,913.00 77 120,043.00
Installation Hardware set for above 24 Fibre OPGW fibre Optic - - - -
ii) cabling including all cable fittings and accessories except joint box 0

a) Suspension Assembly China Sets 30 US$ 30.00 900.00 - 23.00 - 690.00 7 210.00
b) Dead End Assembly China Sets 4 US$ 28.00 112.00 - - 4 112.00
c) Tension Assembly (For joint Box Location) China Sets 42 US$ 56.00 2,352.00 - 11.00 - 616.00 31 1,736.00
d) Pass through Assembly China Sets 125 US$ 48.00 6,000.00 49.00 2,352.00 174 8,352.00
Special Fitting Assembly at suspension tower (for joint box 34.00 - - 34.00
e) locations) China Sets 2 2
US$ 17.00
f) Vibration Damper China Sets 600 4,800.00 381.00 3,048.00 981 7,848.00
US$ 8.00
g) Down Lead Clamp assemblies China No. 646 3,876.00 - 554.00 - 3,324.00 92 552.00
US$ 6.00

ICB-PMD-MCTLP–016/17-01
Schedule-1, Page 20 of 65

Contract No. :- ICB-PMD-MCTLP-016/17-01

Revised BoQ
Schedule No.1: Plant and Equipment including Mandatory Spares to be supplied from abroad
CIP Project Site including insurance, clearing, forwarding and transportaion to site (Excluding Taxes and Duties applicable in Nepal) Date: 02 November 2021

Final Quantity after After


Contract Amount Amended Quantity Remarks
Amendment
Country of
Item No. Item description
origin
FC
As per Contract
Unit Amount as per Bidding Amount as per Amount as per
Qty. Currency# Qty Qty
Unit Rate Quantity Bidding Quantity Bidding Quantity
1 2 3 4 5a 6 7 8a = (7) x (5a) 8b = (7) x (5a)
iii) Joint Box (24 fibre) - OPGW to OPGW China No. 21 945.00 - 5.00 - 225.00 16 720.00
US$ 45.00
- - - 0 -
- - - 0 -
4.9.2 FODP - - - 0 -
FODP 48F : Indoor Type, rack mounted with FCPC coupling and 1,800.00 - - 1,800.00
i) pig tails (5 mtrs each). China No. 4 4
US$ 450.00
US$ - - - -
4.9.3 Fibre Optic approach cable - - - -
i) 24 Fibre (DWSM) China Km. 2 US$ 1,000.00 2,000.00 - - 2 2,000.00
Installation hardware set for above 24 Fibre, Fibre Optic 1,200.00 - - 1,200.00
ii) Approach Cable China Set 2 2
US$ 600.00
- - - 0 -
4.10 Mandatory Spares of OPGW Cabling - - - 0 -
4.10.1 OPGW cable & Accessories
i) 24 Fibre (DWSM) OPGW fibre optic cable China Km. 4 6,236.00 - - 4 6,236.00
US$ 1,559.00
Installation Hardware set for above 24 Fibre OPGW fibre Optic - - - -
ii) cabling including all cable fittings and accessories except joint box 0

a) Suspension Assembly China Sets 2 60.00 - - 2 60.00


US$ 30.00
b) Dead End Assembly China Sets 2 56.00 - - 2 56.00
US$ 28.00
c) Tension Assembly (For joint Box Location) China Sets 1 56.00 - - 1 56.00
US$ 56.00
d) Pass through Assembly China Sets 6 288.00 - - 6 288.00
US$ 48.00
e) Special Fitting Assembly at suspension tower (for joint box locations) China Sets 1 17.00 - - 1 17.00
US$ 17.00
f) Vibration Damper China Sets 30 240.00 - - 30 240.00
US$ 8.00
g) Down Lead Clamp assemblies China No. 33 198.00 - - 33 198.00
US$ 6.00
iii) Joint Box (24 fibre) China No. 1 45.00 - - 1 45.00
US$ 45.00
- - - -
4.10.2 Fibre Optic approach cable - - - -
i) 24 Fibre (DWSM) China Km. 4 US$ 1,000.00 4,000.00 - - 4 4,000.00
Installation hardware set for above 24 Fibre, Approach Fibre 600.00 - - 600.00
ii) Optic Cable China Set 1 1
US$ 600.00
- - - -
5 Supply of following items for aviation requirements - - - -
i) Span markers China Nos. 20 US$ 100.00 2,000.00 1.00 100.00 21 2,100.00
ii) Obstruction lights (to be provided as per IS 5613) - - - 0 -
a) 1 Medium + 2low intensity China Sets. 12 US$ 6,700.00 80,400.00 1.00 6,700.00 13 87,100.00
b) 1 Medium + 4low intensity China Sets. 8 US$ 9,600.00 76,800.00 - - 8 76,800.00
- - - 0 -
6 Supply of following softwares - - - 0 -
PLS-CADD (multiuser license for 10 users- with individual keys) 122,000.00 - - 122,000.00
i) USA Set 1 1
US$ 122,000.00
PLS-TOWER (multiuser license for 10 users- with individual keys) 122,000.00 - - 122,000.00
ii) USA Set 1 1
US$ 122,000.00
- -
TOTAL (Total of column 9 to be carried forward to Schedule
15,143,903.31 715,342.27 15,859,245.58
No. 5: Grand Summary)

ICB-PMD-MCTLP–016/17-01
Schedule-2, Page 21 of 65

NEPAL ELECTRICITY AUTHORITY


PROJECT MANAGEMENT DIRECTORATE
Marsyangdi Corridor 220 kV Transmission Line Project, Udipur-Markichowk-Bharatpur Section
Contract No. :- ICB-PMD-MCTLP-016/17-01

Schedule No. 2: Plant and Equipment including Mandatory Spares Parts to be supplied from within Nepal including Type Test Charges
Date: 02 November 2021

NOT APPLICABLE

ICB-PMD-MCTLP–016/17-01
Schedule-3, Page 22 of 65

NEPAL ELECTRICITY AUTHORITY


PROJECT MANAGEMENT DIRECTORATE
Marsyangdi Corridor 220 kV Transmission Line Project, Udipur-Markichowk-Bharatpur Section
Contract No. :- ICB-PMD-MCTLP-016/17-01
Schedule -3: Design Services Date: 02 November 2021
Unit Prices Total Prices
Estimated Local
Item
No. Item Description Currency Foreign Currency Portion
portion
Quantity Unit NRs Currency# Unit Rate LC FC
1 2 3 4 5 6 7 8=3x5 9=3x7

1 Tower Type DB, DC, DD, MA, DDspl., MD 1 Lot USD 50,000.00 50,000.00

Total (Total of column 8 and 9 to be carried forward to


Schedule No. 5: Grand Summary)
50000.00

ICB-PMD-MCTLP–016/17-01
Schedule-4 (a), Page 23 of 65

NEPAL ELECTRICITY AUTHORITY


PROJECT MANAGEMENT DIRECTORATE
Marsyangdi Corridor 220 kV Transmission Line Project, Udipur-Markichowk-Bharatpur Section DFR
###
Schedule No. 4: Installation and other Services Date: 02 November 2021 ###
(a): Installation and Construction Charges ###
Installation Charges 1st Amendment Final after 1st Amendment Remarks ###
Portion in Nepal Currency (in NRs) Foreign Local Currency ###
Contract
Sl. No. Item Description Unit Amount as Per
Qty. Amount as Per Contract Amount as Per Amount as Per
Unit Rate Amended Qty. Revised Qty. Amended Quantity ###
Qty. Revised Qty. (Local) Revised Qty.
(Foreign)
(1) (2) (3) (4a) (8) (9a)=(4a)x(8) ###
1 Survey ###
a) Detailed survey including route alignment, profiling, tower spotting KM 12 - - - 12.00 7,200.00 - ###
b) Check Survey including route alignment, profiling, tower spotting KM 67 - - - 67.00 32,160.00 - ###
- - - 0.00 - - ###
2 Detailed soil Investigation - - - 0.00 - - ###
i. All kind of soil except FR & HR Loc. 29 - - - 29.00 5,800.00 - ###
ii. Fissured/soft rock Loc. 19 - - - 19.00 4,750.00 - ###
iii Hard rock Loc. 12 - - - 12.00 4,800.00 - ###
iv. River crossing location Loc. 1 - - - 1.00 1,200.00 - ###
- - - 0.00 - -
3 Benching - - - 0.00 - -
i) All kind of soil except FR & HR Cum. 10900 480.00 5,232,000.00 - - - 10900.00 - 5,232,000.00
ii) Fissured Rock Cum. 7350 750.00 5,512,500.00 - - - 7350.00 - 5,512,500.00
iii) Hard Rock Cum. 3250 1,500.00 4,875,000.00 - - - 3250.00 - 4,875,000.00
- - - - 0.00 - -
4 Work associated with tower foundations. - - - - 0.00 - -
4.1 Suspension Tower DA - - - - 0.00 - -
Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m leg - - - - - -
a) Extension) 0.00

i) Dry Foundation Nos. 1 933,936.00 933,936.00 - 1.00 - - 933,936.00 0.00 - -


ii) Wet Foundation Nos. 1 1,514,032.00 1,514,032.00 - 1.00 - - 1,514,032.00 0.00 - -
iii) Partially Submerged Foundation Nos. 0 1,514,032.00 - - - - 0.00 - -
iv) Fully Submerged Foundation Nos. 1 1,514,032.00 1,514,032.00 - 1.00 - - 1,514,032.00 0.00 - -
v) Wet Black Cotton Foundation Nos. 1 1,927,329.00 1,927,329.00 - 1.00 - - 1,927,329.00 0.00 - -
vi) Dry Fissured Rock Nos. 1 976,075.00 976,075.00 - 1.00 - - 976,075.00 0.00 - -
vii) Wet Fissured Rock Nos. 0 976,075.00 - - - - 0.00 - -
viii) Submerged Fissured Rock Nos. 0 976,075.00 - - - - 0.00 - -
ix) Hard Rock Foundation Nos. 1 203,925.00 203,925.00 - 1.00 - - 203,925.00 0.00 - -
x) Sandy Soil Foundation Nos. 0 1,098,353.00 - - - - 0.00 - -
- - - - 0.00 - -
Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m leg - - - - - -
b) Extension 0.00

i) Dry Foundation Nos. 1 983,049.00 983,049.00 - 1.00 - - 983,049.00 0.00 - -


ii) Wet Foundation Nos. 3 1,593,784.00 4,781,352.00 - 3.00 - - 4,781,352.00 0.00 - -
iii) Partially Submerged Foundation Nos. 0 1,593,784.00 - - - - 0.00 - -
iv) Fully Submerged Foundation Nos. 1 1,593,784.00 1,593,784.00 - 1.00 - - 1,593,784.00 0.00 - -
v) Wet Black Cotton Foundation Nos. 2 2,028,814.00 4,057,628.00 - 2.00 - - 4,057,628.00 0.00 - -
vi) Dry Fissured Rock Nos. 1 1,027,405.00 1,027,405.00 - 1.00 - - 1,027,405.00 0.00 - -
vii) Wet Fissured Rock Nos. 0 1,027,405.00 - - - - 0.00 - -
viii) Submerged Fissured Rock Nos. 0 1,027,405.00 - - - - 0.00 - -
ix) Hard Rock Foundation Nos. 4 214,440.00 857,760.00 - 4.00 - - 857,760.00 0.00 - -
x) Sandy Soil Foundation Nos. 0 1,155,165.00 - - - - 0.00 - -
- - - - 0.00 - -
c) Common Foundation for +18m, +25m leg Extension - - - - 0.00 - -
i) Dry Foundation Nos. 0 983,049.00 - - - - 0.00 - -
ii) Wet Foundation Nos. 0 1,593,784.00 - - - - 0.00 - -
iii) Partially Submerged Foundation Nos. 0 1,593,784.00 - - - - 0.00 - -
iv) Fully Submerged Foundation Nos. 0 1,593,784.00 - - - - 0.00 - -
v) Wet Black Cotton Foundation Nos. 0 2,028,814.00 - - - - 0.00 - -
vi) Dry Fissured Rock Nos. 1 1,027,405.00 1,027,405.00 - 1.00 - - 1,027,405.00 0.00 - -
vii) Wet Fissured Rock Nos. 0 1,027,405.00 - - - - 0.00 - -
viii) Submerged Fissured Rock Nos. 0 1,027,405.00 - - - - 0.00 - -
ix) Hard Rock Foundation Nos. 1 214,440.00 214,440.00 - 1.00 - - 214,440.00 0.00 - -
x) Sandy Soil Foundation Nos. 0 1,155,165.00 - - - - 0.00 - -
- - - 0.00 - -
4.2 Tension Tower DB/DBR - - - 0.00 - -
Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m leg - - - - -
a) Extension)
i) Dry Foundation Nos. 1 1,410,150.00 1,410,150.00 10.00 - 14,101,500.00 11.00 - 15,511,650.00
ii) Wet Foundation Nos. 3 2,363,398.00 7,090,194.00 - 1.00 - - 2,363,398.00 2.00 - 4,726,796.00
iii) Partially Submerged Foundation Nos. 1 2,363,398.00 2,363,398.00 - 1.00 - - 2,363,398.00 - -
iv) Fully Submerged Foundation Nos. 3 2,795,256.00 8,385,768.00 - 2.00 - - 5,590,512.00 1.00 - 2,795,256.00
v) Wet Black Cotton Foundation Nos. 3 3,185,862.00 9,557,586.00 - 3.00 - - 9,557,586.00 - -
vi) Dry Fissured Rock Nos. 1 1,637,853.00 1,637,853.00 5.00 - 8,189,265.00 6.00 - 9,827,118.00
vii) Wet Fissured Rock Nos. 1 2,131,104.00 2,131,104.00 - 1.00 - - 2,131,104.00 0.00 - -
viii) Submerged Fissured Rock Nos. 1 2,703,543.00 2,703,543.00 - 1.00 - - 2,703,543.00 - -
ix) Hard Rock Foundation Nos. 3 302,175.00 906,525.00 - 3.00 - - 906,525.00 - -
x) Sandy Soil Foundation Nos. 1 1,566,934.00 1,566,934.00 - 1.00 - - 1,566,934.00 - -
- - - - -
Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m leg - - - - -
b) Extension
i) Dry Foundation Nos. 0 1,410,150.00 - 28.00 - 39,484,200.00 28.00 - 39,484,200.00

ICB-PMD-MCTLP–016/17-01
Schedule-4 (a), Page 24 of 65

NEPAL ELECTRICITY AUTHORITY


PROJECT MANAGEMENT DIRECTORATE
Marsyangdi Corridor 220 kV Transmission Line Project, Udipur-Markichowk-Bharatpur Section DFR
###
Schedule No. 4: Installation and other Services Date: 02 November 2021 ###
(a): Installation and Construction Charges ###
Installation Charges 1st Amendment Final after 1st Amendment Remarks ###
Portion in Nepal Currency (in NRs) Foreign Local Currency ###
Contract
Sl. No. Item Description Unit Amount as Per
Qty. Amount as Per Contract Amount as Per Amount as Per
Unit Rate Amended Qty. Revised Qty. Amended Quantity ###
Qty. Revised Qty. (Local) Revised Qty.
(Foreign)
(1) (2) (3) (4a) (8) (9a)=(4a)x(8) ###
ii) Wet Foundation Nos. 3 2,487,938.00 7,463,814.00 1.00 - 2,487,938.00 4.00 - 9,951,752.00
iii) Partially Submerged Foundation Nos. 1 2,487,938.00 2,487,938.00 - 1.00 - - 2,487,938.00 - -
iv) Fully Submerged Foundation Nos. 4 2,942,286.00 11,769,144.00 - 1.00 - - 2,942,286.00 3.00 - 8,826,858.00
v) Wet Black Cotton Foundation Nos. 3 3,353,521.00 10,060,563.00 - 3.00 - - 10,060,563.00 - -
vi) Dry Fissured Rock Nos. 1 1,724,017.00 1,724,017.00 13.00 - 22,412,221.00 14.00 - 24,136,238.00
vii) Wet Fissured Rock Nos. 0 2,243,301.00 - 1.00 - 2,243,301.00 1.00 - 2,243,301.00
viii) Submerged Fissured Rock Nos. 0 2,669,538.00 - - - - - -
ix) Hard Rock Foundation Nos. 4 318,195.00 1,272,780.00 - 4.00 - - 1,272,780.00 - -
x) Sandy Soil Foundation Nos. 0 1,541,553.00 - - - - - -
- - - - -
c) Extra Foundation Work for Raised Chimney - - - - -
i) Dry Foundation Cum 480.00 - 32.84 - 15,763.20 32.84 - 15,763.20
ii) Excavation in Fissured Rock Cum 750.00 - 19.70 - 14,775.00 19.70 - 14,775.00
iii) Excavation in Hard Rock Cum 1,500.00 - - - - 0.00 - -
iv) PCC Work in M10 Cum 11,520.00 - 0.53 - 6,105.60 0.53 - 6,105.60
v) PCC Work in M20 Cum 22,000.00 - 94.85 - 2,086,700.00 94.85 - 2,086,700.00
vi) Reinforcement Steel Bar Kg 110.00 - 5,770.00 - 634,700.00 5770.00 - 634,700.00
- - - - -
4.3 Tension Tower DC/DCR - - - - -
Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m leg - - - - - -
a) Extension)
i) Dry Foundation Nos. 3 1,906,238.00 5,718,714.00 - 1.00 - - 1,906,238.00 2.00 - 3,812,476.00
ii) Wet Foundation Nos. 1 2,793,308.00 2,793,308.00 - 1.00 - - 2,793,308.00 0.00 - -
iii) Partially Submerged Foundation Nos. 1 2,793,308.00 2,793,308.00 - 1.00 - - 2,793,308.00 - -
iv) Fully Submerged Foundation Nos. 1 2,947,276.00 2,947,276.00 - 1.00 - - 2,947,276.00 0.00 - -
v) Wet Black Cotton Foundation Nos. 0 3,708,452.00 - - - - - -
vi) Dry Fissured Rock Nos. 1 1,989,468.00 1,989,468.00 - - - 1.00 - 1,989,468.00
vii) Wet Fissured Rock Nos. 0 1,989,468.00 - - - - - -
viii) Submerged Fissured Rock Nos. 0 1,989,468.00 - - - - - -
ix) Hard Rock Foundation Nos. 1 391,305.00 391,305.00 - 1.00 - - 391,305.00 - -
x) Sandy Soil Foundation Nos. 0 2,084,344.00 - - - - - -
- - - - -
Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m leg - - - - -
b) Extension
i) Dry Foundation Nos. 1 2,006,564.00 2,006,564.00 11.00 - 22,072,204.00 12.00 - 24,078,768.00
ii) Wet Foundation Nos. 1 2,940,334.00 2,940,334.00 1.00 - 2,940,334.00 2.00 - 5,880,668.00
iii) Partially Submerged Foundation Nos. 1 2,940,334.00 2,940,334.00 - 1.00 - - 2,940,334.00 - -
iv) Fully Submerged Foundation Nos. 1 3,102,446.00 3,102,446.00 - - - 1.00 - 3,102,446.00
v) Wet Black Cotton Foundation Nos. 1 3,708,452.00 3,708,452.00 - 1.00 - - 3,708,452.00 - -
vi) Dry Fissured Rock Nos. 1 2,094,173.00 2,094,173.00 5.00 - 10,470,865.00 6.00 - 12,565,038.00
vii) Wet Fissured Rock Nos. 0 2,094,173.00 - 1.00 - 2,094,173.00 1.00 - 2,094,173.00
viii) Submerged Fissured Rock Nos. 0 2,094,173.00 - - - - - -
ix) Hard Rock Foundation Nos. 3 411,930.00 1,235,790.00 - 3.00 - - 1,235,790.00 - -
x) Sandy Soil Foundation Nos. 0 2,194,020.00 - - - - - -
- - - - -
c) Extra Foundation Work for Raised Chimney - - - - -
i) Excavation in all kinds of soil except HR & FR Cum 0 480.00 - 186.50 - 89,520.00 186.50 - 89,520.00
ii) Excavation in Fissured Rock Cum 0 750.00 - 111.90 - 83,925.00 111.90 - 83,925.00
iii) Excavation in Hard Rock Cum 0 1,500.00 - - - - 0.00 - -
iv) PCC Work in M10 Cum 0 11,520.00 - 4.42 - 50,918.40 4.42 - 50,918.40
v) PCC Work in M20 Cum 0 22,000.00 - 83.11 - 1,828,420.00 83.11 - 1,828,420.00
vi) Reinforcement Steel Bar Kg 0 110.00 - 7,320.00 - 805,200.00 7320.00 - 805,200.00
- - - - -
4.4 Tension Tower DD/DDR - - - - -
Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m leg - - - - -
a) Extension)
i) Dry Foundation Nos. 4 3,259,278.00 13,037,112.00 4.00 - 13,037,112.00 8.00 - 26,074,224.00
ii) Wet Foundation Nos. 2 4,528,295.00 9,056,590.00 - 1.00 - - 4,528,295.00 1.00 - 4,528,295.00
iii) Partially Submerged Foundation Nos. 4 4,528,295.00 18,113,180.00 - 4.00 - - 18,113,180.00 - -
iv) Fully Submerged Foundation Nos. 5 4,528,295.00 22,641,475.00 - 4.00 - - 18,113,180.00 1.00 - 4,528,295.00
v) Wet Black Cotton Foundation Nos. 3 5,144,463.00 15,433,389.00 - 3.00 - - 15,433,389.00 - -
vi) Dry Fissured Rock Nos. 4 3,401,606.00 13,606,424.00 - - - 4.00 - 13,606,424.00
vii) Wet Fissured Rock Nos. 2 3,576,831.00 7,153,662.00 - 2.00 - - 7,153,662.00 - -
viii) Submerged Fissured Rock Nos. 2 4,328,786.00 8,657,572.00 - 2.00 - - 8,657,572.00 - -
ix) Hard Rock Foundation Nos. 6 581,550.00 3,489,300.00 - 6.00 - - 3,489,300.00 - -
x) Sandy Soil Foundation Nos. 2 3,259,278.00 6,518,556.00 - 2.00 - - 6,518,556.00 - -
- - - - -
Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m leg - - - - -
b) Extension
i) Dry Foundation Nos. 0 3,517,804.00 - 24.00 - 84,427,296.00 24.00 - 84,427,296.00
ii) Wet Foundation Nos. 4 4,766,686.00 19,066,744.00 - - - 4.00 - 19,066,744.00
iii) Partially Submerged Foundation Nos. 2 4,766,686.00 9,533,372.00 - 2.00 - - 9,533,372.00 - -
iv) Fully Submerged Foundation Nos. 1 4,766,686.00 4,766,686.00 2.00 - 9,533,372.00 3.00 - 14,300,058.00
v) Wet Black Cotton Foundation Nos. 2 5,415,329.00 10,830,658.00 - 2.00 - - 10,830,658.00 - -
vi) Dry Fissured Rock Nos. 1 3,580,720.00 3,580,720.00 12.00 - 42,968,640.00 13.00 - 46,549,360.00
vii) Wet Fissured Rock Nos. 0 3,859,252.00 - 1.00 - 3,859,252.00 1.00 - 3,859,252.00

ICB-PMD-MCTLP–016/17-01
Schedule-4 (a), Page 25 of 65

NEPAL ELECTRICITY AUTHORITY


PROJECT MANAGEMENT DIRECTORATE
Marsyangdi Corridor 220 kV Transmission Line Project, Udipur-Markichowk-Bharatpur Section DFR
###
Schedule No. 4: Installation and other Services Date: 02 November 2021 ###
(a): Installation and Construction Charges ###
Installation Charges 1st Amendment Final after 1st Amendment Remarks ###
Portion in Nepal Currency (in NRs) Foreign Local Currency ###
Contract
Sl. No. Item Description Unit Amount as Per
Qty. Amount as Per Contract Amount as Per Amount as Per
Unit Rate Amended Qty. Revised Qty. Amended Quantity ###
Qty. Revised Qty. (Local) Revised Qty.
(Foreign)
(1) (2) (3) (4a) (8) (9a)=(4a)x(8) ###
viii) Submerged Fissured Rock Nos. 1 4,556,568.00 4,556,568.00 - 1.00 - - 4,556,568.00 - -
ix) Hard Rock Foundation Nos. 2 612,330.00 1,224,660.00 - 2.00 - - 1,224,660.00 - -
x) Sandy Soil Foundation Nos. 2 3,430,902.00 6,861,804.00 - 2.00 - - 6,861,804.00 - -
- - - - - -
c) Common Foundation for +18m, +25m leg Extension - - - - - -
i) Dry Foundation Nos. 2 3,517,804.00 7,035,608.00 1.00 - 3,517,804.00 3.00 - 10,553,412.00
ii) Wet Foundation Nos. 3 4,766,686.00 14,300,058.00 - 3.00 - - 14,300,058.00 0.00 - -
iii) Partially Submerged Foundation Nos. 2 4,871,512.00 9,743,024.00 - 2.00 - - 9,743,024.00 - -
iv) Fully Submerged Foundation Nos. 3 4,871,512.00 14,614,536.00 - 3.00 - - 14,614,536.00 0.00 - -
v) Wet Black Cotton Foundation Nos. 3 5,641,794.00 16,925,382.00 - 3.00 - - 16,925,382.00 - -
vi) Dry Fissured Rock Nos. 3 3,672,060.00 11,016,180.00 - 1.00 - - 3,672,060.00 2.00 - 7,344,120.00
vii) Wet Fissured Rock Nos. 1 3,859,252.00 3,859,252.00 - 1.00 - - 3,859,252.00 - -
viii) Submerged Fissured Rock Nos. 1 4,661,610.00 4,661,610.00 - 1.00 - - 4,661,610.00 - -
ix) Hard Rock Foundation Nos. 4 612,330.00 2,449,320.00 - 4.00 - - 2,449,320.00 - -
x) Sandy Soil Foundation Nos. 3 3,517,804.00 10,553,412.00 - 3.00 - - 10,553,412.00 - -
- - - - - -
d) Extra Foundation Work for Raised Chimney - - - - - -
i) Excavation in all kinds of soil except HR & FR Cum 480.00 - - - - 0.00 - -
ii) Excavation in Fissured Rock Cum 750.00 - - - - 0.00 - -
iii) Excavation in Hard Rock Cum 1,500.00 - 0.87 - 1,305.00 0.87 - 1,305.00
iv) PCC Work in M10 Cum 11,520.00 - - - - 0.00 - -
v) PCC Work in M20 Cum 22,000.00 - 139.97 - 3,079,340.00 139.97 - 3,079,340.00
vi) Reinforcement Steel Bar Kg 110.00 - 11,750.00 - 1,292,500.00 11750.00 - 1,292,500.00
- - - - - -
4.5 Tension Tower Special (DDSR) - - - - - -
Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m leg - - - - - -
a) Extension)
i) Dry Foundation Nos. 3 3,426,009.00 10,278,027.00 - 1.00 - - 3,426,009.00 2.00 - 6,852,018.00
ii) Wet Foundation Nos. 2 4,728,946.00 9,457,892.00 - 2.00 - - 9,457,892.00 - -
iii) Partially Submerged Foundation Nos. 0 4,977,773.00 - - - - - -
iv) Fully Submerged Foundation Nos. 0 4,977,773.00 - - - - - -
v) Wet Black Cotton Foundation Nos. 0 5,144,463.00 - - - - - -
vi) Dry Fissured Rock Nos. 3 3,576,831.00 10,730,493.00 - 2.00 - - 7,153,662.00 1.00 - 3,576,831.00
vii) Wet Fissured Rock Nos. 0 3,576,831.00 - - - - - -
viii) Submerged Fissured Rock Nos. 0 3,576,831.00 - - - - - -
ix) Hard Rock Foundation Nos. 0 612,330.00 - - - - - -
x) Sandy Soil Foundation Nos. 0 3,606,366.00 - - - - - -
- - - - - -
Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m leg - - - - - -
b) Extension
i) Dry Foundation Nos. 0 3,426,009.00 - 9.00 - 30,834,081.00 9.00 - 30,834,081.00
ii) Wet Foundation Nos. 0 4,728,946.00 - 1.00 - 4,728,946.00 1.00 - 4,728,946.00
iii) Partially Submerged Foundation Nos. 0 4,977,773.00 - - - - - -
iv) Fully Submerged Foundation Nos. 0 4,977,773.00 - 1.00 - 4,977,773.00 1.00 - 4,977,773.00
v) Wet Black Cotton Foundation Nos. 0 5,144,463.00 - - - - - -
vi) Dry Fissured Rock Nos. 0 3,576,831.00 - 5.00 - 17,884,155.00 5.00 - 17,884,155.00
vii) Wet Fissured Rock Nos. 0 3,576,831.00 - 1.00 - 3,576,831.00 1.00 - 3,576,831.00
viii) Submerged Fissured Rock Nos. 0 3,576,831.00 - - - - - -
ix) Hard Rock Foundation Nos. 0 612,330.00 - - - - - -
x) Sandy Soil Foundation Nos. 0 3,606,366.00 - - - - - -
- - - - - -
c) Common Foundation for +18m, +25m leg Extension - - - - - -
i) Dry Foundation Nos. 1 3,606,366.00 3,606,366.00 - 1.00 - - 3,606,366.00 0.00 - -
ii) Wet Foundation Nos. 1 5,085,144.00 5,085,144.00 - 1.00 - - 5,085,144.00 - -
iii) Partially Submerged Foundation Nos. 0 497,773.00 - - - - - -
iv) Fully Submerged Foundation Nos. 0 497,773.00 - - - - - -
v) Wet Black Cotton Foundation Nos. 0 5,641,794.00 - - - - - -
vi) Dry Fissured Rock Nos. 0 3,765,126.00 - - - - - -
vii) Wet Fissured Rock Nos. 0 3,954,882.00 - - - - - -
viii) Submerged Fissured Rock Nos. 0 4,874,552.00 - - - - - -
ix) Hard Rock Foundation Nos. 0 612,330.00 - - - - - -
x) Sandy Soil Foundation Nos. 0 3,606,366.00 - - - - - -
- - - - - -
d) Extra Foundation Work for Raised Chimney - - - - - -
i) Excavation in all kinds of soil except HR & FR Cum 480.00 - - - - - -
ii) Excavation in Fissured Rock Cum 750.00 - - - - - -
iii) Excavation in Hard Rock Cum 1,500.00 - - - - - -
iv) PCC Work in M10 Cum 11,520.00 - - - - - -
v) PCC Work in M20 Cum 22,000.00 - - - - - -
vi) Reinforcement Steel Bar Kg 110.00 - - - - - -
- - - - - -
4.6 Suspension Tower MA - - - - - -
Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m leg - - - - - -
a) Extension)
i) Dry Foundation Nos. 3 1,753,950.00 5,261,850.00 - - - 3.00 - 5,261,850.00
ii) Wet Foundation Nos. 1 3,171,387.00 3,171,387.00 - 1.00 - - 3,171,387.00 - -

ICB-PMD-MCTLP–016/17-01
Schedule-4 (a), Page 26 of 65

NEPAL ELECTRICITY AUTHORITY


PROJECT MANAGEMENT DIRECTORATE
Marsyangdi Corridor 220 kV Transmission Line Project, Udipur-Markichowk-Bharatpur Section DFR
###
Schedule No. 4: Installation and other Services Date: 02 November 2021 ###
(a): Installation and Construction Charges ###
Installation Charges 1st Amendment Final after 1st Amendment Remarks ###
Portion in Nepal Currency (in NRs) Foreign Local Currency ###
Contract
Sl. No. Item Description Unit Amount as Per
Qty. Amount as Per Contract Amount as Per Amount as Per
Unit Rate Amended Qty. Revised Qty. Amended Quantity ###
Qty. Revised Qty. (Local) Revised Qty.
(Foreign)
(1) (2) (3) (4a) (8) (9a)=(4a)x(8) ###
iii) Partially Submerged Foundation Nos. 0 3,251,368.00 - - - - - -
iv) Fully Submerged Foundation Nos. 1 3,251,368.00 3,251,368.00 - 1.00 - - 3,251,368.00 - -
v) Wet Black Cotton Foundation Nos. 0 3,685,979.00 - - - - - -
vi) Dry Fissured Rock Nos. 1 1,960,636.00 1,960,636.00 - - - 1.00 - 1,960,636.00
vii) Wet Fissured Rock Nos. 0 1,960,636.00 - - - - - -
viii) Submerged Fissured Rock Nos. 0 1,960,636.00 - - - - - -
ix) Hard Rock Foundation Nos. 0 297,854.00 - - - - - -
x) Sandy Soil Foundation Nos. 0 1,753,950.00 - - - - - -
- - - - - -
Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m leg - - - - - -
b) Extension
i) Dry Foundation Nos. 0 1,753,950.00 - 2.00 - 3,507,900.00 2.00 - 3,507,900.00
ii) Wet Foundation Nos. 2 3,338,366.00 6,676,732.00 - 2.00 - - 6,676,732.00 - -
iii) Partially Submerged Foundation Nos. 0 3,422,567.00 - - - - - -
iv) Fully Submerged Foundation Nos. 2 3,422,567.00 6,845,134.00 - 2.00 - - 6,845,134.00 - -
v) Wet Black Cotton Foundation Nos. 0 3,880,061.00 - - - - - -
vi) Dry Fissured Rock Nos. 0 1,960,636.00 - 1.00 - 1,960,636.00 1.00 - 1,960,636.00
vii) Wet Fissured Rock Nos. 0 1,960,636.00 - - - - - -
viii) Submerged Fissured Rock Nos. 0 1,960,636.00 - - - - - -
ix) Hard Rock Foundation Nos. 0 297,854.00 - - - - - -
x) Sandy Soil Foundation Nos. 0 1,753,950.00 - - - - - -
- - - - - -
4.7 Tension Tower MD - - - - - -
Foundation for Basic Body (including -4.5m, -3m, -1.5m, +/- 0m leg - - - - - -
a) Extension)
i) Dry Foundation Nos. 7 5,192,309.00 36,346,163.00 - 5.00 - - 25,961,545.00 2.00 - 10,384,618.00
ii) Wet Foundation Nos. 1 9,097,474.00 9,097,474.00 - 1.00 - - 9,097,474.00 - -
iii) Partially Submerged Foundation Nos. 0 9,097,474.00 - - - - - -
iv) Fully Submerged Foundation Nos. 0 9,097,474.00 - - - - - -
v) Wet Black Cotton Foundation Nos. 0 10,311,576.00 - - - - - -
vi) Dry Fissured Rock Nos. 0 6,065,401.00 - - - - - -
vii) Wet Fissured Rock Nos. 0 6,065,401.00 - - - - - -
viii) Submerged Fissured Rock Nos. 0 6,065,401.00 - - - - - -
ix) Hard Rock Foundation Nos. 0 797,112.00 - - - - - -
x) Sandy Soil Foundation Nos. 0 5,192,309.00 - - - - - -
- - - - - -
Common Foundation for +1.5m, +3m, +4.5m +6m, +7.5m, +9m leg - - - - - -
b) Extension
i) Dry Foundation Nos. 2 5,465,496.00 10,930,992.00 1.00 - 5,465,496.00 3.00 - 16,396,488.00
ii) Wet Foundation Nos. 1 9,576,434.00 9,576,434.00 - - - 1.00 - 9,576,434.00
iii) Partially Submerged Foundation Nos. 1 9,576,434.00 9,576,434.00 - 1.00 - - 9,576,434.00 - -
iv) Fully Submerged Foundation Nos. 0 9,576,434.00 - - - - - -
v) Wet Black Cotton Foundation Nos. 0 10,854,454.00 - - - - - -
vi) Dry Fissured Rock Nos. 2 6,065,401.00 12,130,802.00 - 1.00 - - 6,065,401.00 1.00 - 6,065,401.00
vii) Wet Fissured Rock Nos. 0 6,065,401.00 - - - - - -
viii) Submerged Fissured Rock Nos. 0 6,065,401.00 - - - - - -
ix) Hard Rock Foundation Nos. 0 797,128.00 - - - - - -
x) Sandy Soil Foundation Nos. 0 5,465,496.00 - - - - - -
- - - - - -
Erection of following types of towers & tower extension parts - - - - - -
complete with stubs, step bolts, hangers, D-shackles, bolts & nuts etc
5 but excluding tower accessories such as danger plates, number
plates, phase plates, anti-climbing devices

5.1 Suspension Tower DA - - - - -


a) Basic tower Nos. 20 114,761.00 2,295,220.00 - 20.00 - - 2,295,220.00 0.00 - -
b) -4.5 m Leg Extension Nos. 4 1,822.00 7,288.00 - 4.00 - - 7,288.00 0.00 - -
c) -3 m Leg Extension Nos. 6 2,376.00 14,256.00 - 6.00 - - 14,256.00 0.00 - -
d) -1.5 m Leg Extension Nos. 8 3,644.00 29,152.00 - 8.00 - - 29,152.00 0.00 - -
e) +/- 0 m Leg Extension Nos. 28 5,465.00 153,020.00 - 28.00 - - 153,020.00 0.00 - -
f) +1.5 m Leg Extension Nos. 8 5,465.00 43,720.00 - 8.00 - - 43,720.00 0.00 - -
g) +3 m Leg Extension Nos. 26 7,287.00 189,462.00 - 26.00 - - 189,462.00 0.00 - -
h) +4.5 m Leg Extension Nos. 2 9,108.00 18,216.00 - 2.00 - - 18,216.00 0.00 - -
i) +6 m Leg Extension Nos. 12 10,930.00 131,160.00 - 12.00 - - 131,160.00 0.00 - -
j) +7.5 m Leg Extension Nos. 2 12,752.00 25,504.00 - 2.00 - - 25,504.00 0.00 - -
k) +9 m Leg Extension Nos. 8 14,573.00 116,584.00 - 8.00 - - 116,584.00 0.00 - -
l) +18 m Leg Extension Nos. 3 16,395.00 49,185.00 - 3.00 - - 49,185.00 0.00 - -
m) +25 m Leg Extension Nos. 3 27,324.00 81,972.00 - 3.00 - - 81,972.00 0.00 - -
- - - - - -
5.2 Tension Tower DB - - - - - -
a) Basic tower - - - - - -
a.1.1) Basic Tower with Normal Cross-Arm Nos. 34 168,506.00 5,729,204.00 19.00 - 3,201,614.00 53.00 - 8,930,818.00
a.1.2) Basic Tower with strengthened Cross-Arm Nos. 0 174,738.45 - 17.00 - 2,970,553.68 17.00 - 2,970,553.68
b) -4.5 m Leg Extension Nos. 4 2,519.00 10,076.00 - 4.00 - - 10,076.00 0.00 - -
c) -3 m Leg Extension Nos. 10 3,644.00 36,440.00 - 5.00 - - 18,220.00 5.00 - 18,220.00
d) -1.5 m Leg Extension Nos. 14 5,465.00 76,510.00 - 3.00 - - 16,395.00 11.00 - 60,115.00
e) +/- 0 m Leg Extension Nos. 84 7,287.00 612,108.00 152.00 - 1,107,624.00 236.00 - 1,719,732.00

ICB-PMD-MCTLP–016/17-01
Schedule-4 (a), Page 27 of 65

NEPAL ELECTRICITY AUTHORITY


PROJECT MANAGEMENT DIRECTORATE
Marsyangdi Corridor 220 kV Transmission Line Project, Udipur-Markichowk-Bharatpur Section DFR
###
Schedule No. 4: Installation and other Services Date: 02 November 2021 ###
(a): Installation and Construction Charges ###
Installation Charges 1st Amendment Final after 1st Amendment Remarks ###
Portion in Nepal Currency (in NRs) Foreign Local Currency ###
Contract
Sl. No. Item Description Unit Amount as Per
Qty. Amount as Per Contract Amount as Per Amount as Per
Unit Rate Amended Qty. Revised Qty. Amended Quantity ###
Qty. Revised Qty. (Local) Revised Qty.
(Foreign)
(1) (2) (3) (4a) (8) (9a)=(4a)x(8) ###
f) +1.5 m Leg Extension Nos. 14 9,108.00 127,512.00 - - - 14.00 - 127,512.00
g.1) +3 m Leg Extension with Basic Tower Body Nos. 10 12,752.00 127,520.00 2.00 - 25,504.00 12.00 - 153,024.00
g.2) +3 m Leg Extension with Normal Tower Body Nos. 0 19,418.67 - 32.00 - 621,397.48 32.00 - 621,397.48
h) +4.5 m Leg Extension Nos. 8 14,573.00 116,584.00 15.00 - 218,595.00 23.00 - 335,179.00
i) +6 m Leg Extension Nos. 16 18,216.00 291,456.00 41.00 - 746,856.00 57.00 - 1,038,312.00
j) +7.5 m Leg Extension Nos. 6 20,038.00 120,228.00 11.00 - 220,418.00 17.00 - 340,646.00
k) +9 m Leg Extension Nos. 18 23,681.00 426,258.00 49.00 - 1,160,369.00 67.00 - 1,586,627.00
- - - - - -
5.3 Tension Tower DC - - - - - -
a) Basic tower - - - - - -
a.1.1) Basic Tower with Normal Cross-Arm Nos. 17 173,052.00 2,941,884.00 - 6.00 - - 1,038,312.00 11.00 - 1,903,572.00
a.1.2) Basic Tower with strengthened Cross-Arm Nos. 181,971.86 - 14.00 - 2,547,606.11 14.00 - 2,547,606.11
b) -4.5 m Leg Extension Nos. 2 2,741.00 5,482.00 - 2.00 - - 5,482.00 0.00 - -
c) -3 m Leg Extension Nos. 6 5,703.00 34,218.00 - 6.00 - - 34,218.00 0.00 - -
d) -1.5 m Leg Extension Nos. 8 9,108.00 72,864.00 - 6.00 - - 54,648.00 2.00 - 18,216.00
e) +/- 0 m Leg Extension Nos. 40 9,108.00 364,320.00 51.00 - 464,508.00 91.00 - 828,828.00
f) +1.5 m Leg Extension Nos. 4 10,930.00 43,720.00 - - - 4.00 - 43,720.00
g.1) +3 m Leg Extension with Basic Tower Body Nos. 8 18,216.00 145,728.00 - 5.00 - - 91,080.00 3.00 - 54,648.00
g.2) +3 m Leg Extension with Normal Tower Body Nos. 0 10,301.44 - 10.00 - 103,014.44 10.00 - 103,014.44
h) +4.5 m Leg Extension Nos. 4 21,860.00 87,440.00 2.00 - 43,720.00 6.00 - 131,160.00
i) +6 m Leg Extension Nos. 8 25,503.00 204,024.00 17.00 - 433,551.00 25.00 - 637,575.00
j) +7.5 m Leg Extension Nos. 2 27,324.00 54,648.00 19.00 - 519,156.00 21.00 - 573,804.00
k) +9 m Leg Extension Nos. 6 27,324.00 163,944.00 20.00 - 546,480.00 26.00 - 710,424.00
- - - - - -
5.4 Tension Tower DD - - - - - -
a) Basic tower - - - - - -
a.1.1) With Normal Cross-Arm Nos. 74 255,024.00 18,871,776.00 - 34.00 - - 8,670,816.00 40.00 - 10,200,960.00
a.1.2) With strengthened Cross-Arm Nos. 0 261,653.37 - 24.00 - 6,279,680.87 24.00 - 6,279,680.87
b) -4.5 m Leg Extension Nos. 8 4,705.00 37,640.00 - 8.00 - - 37,640.00 0.00 - -
c) -3 m Leg Extension Nos. 14 6,178.00 86,492.00 - 13.00 - - 80,314.00 1.00 - 6,178.00
d) -1.5 m Leg Extension Nos. 30 9,108.00 273,240.00 - 23.00 - - 209,484.00 7.00 - 63,756.00
e) +/- 0 m Leg Extension Nos. 210 9,108.00 1,912,680.00 14.00 - 127,512.00 224.00 - 2,040,192.00
f) +1.5 m Leg Extension Nos. 14 12,752.00 178,528.00 - 6.00 - - 76,512.00 8.00 - 102,016.00
g.1) +3 m Leg Extension with Basic Tower Body Nos. 20 20,038.00 400,760.00 - 4.00 - - 80,152.00 16.00 - 320,608.00
g.2) +3 m Leg Extension with Normal Tower Body Nos. 0 13,590.98 - 33.00 - 448,502.48 33.00 - 448,502.48
h) +4.5 m Leg Extension Nos. 4 21,860.00 87,440.00 47.00 - 1,027,420.00 51.00 - 1,114,860.00
i) +6 m Leg Extension Nos. 20 27,324.00 546,480.00 3.00 - 81,972.00 23.00 - 628,452.00
j) +7.5 m Leg Extension Nos. 4 29,146.00 116,584.00 13.00 - 378,898.00 17.00 - 495,482.00
k) +9 m Leg Extension Nos. 20 32,789.00 655,780.00 23.00 - 754,147.00 43.00 - 1,409,927.00
l) +18 m Leg Extension Nos. 72 34,611.00 2,491,992.00 - 60.00 - - 2,076,660.00 12.00 - 415,332.00
m) +25 m Leg Extension Nos. 22 67,400.00 1,482,800.00 - 10.00 - - 674,000.00 12.00 - 808,800.00
- - - - - -
5.5 Tension Tower DD Special - - - - - -
a) Basic tower Nos. - - - - - -
a.1.1) With Normal Cross-Arm Nos. 10 273,240.00 2,732,400.00 - 10.00 - - 2,732,400.00 0.00 - -
a.1.2) With strengthened Cross-Arm Nos. 0 281,437.20 - 20.00 - 5,628,744.00 20.00 - 5,628,744.00
b) -4.5 m Leg Extension Nos. 0 5,465.00 - - - - 0.00 - -
c) -3 m Leg Extension Nos. 0 6,812.00 - 5.00 - 34,060.00 5.00 - 34,060.00
d) -1.5 m Leg Extension Nos. 0 9,108.00 - - - - 0.00 - -
e) +/- 0 m Leg Extension Nos. 40 10,930.00 437,200.00 30.00 - 327,900.00 70.00 - 765,100.00
f) +1.5 m Leg Extension Nos. 0 12,752.00 - 1.00 - 12,752.00 1.00 - 12,752.00
g.1) +3 m Leg Extension with Basic Tower Body Nos. 0 20,038.00 - 4.00 - 80,152.00 4.00 - 80,152.00
g.2) +3 m Leg Extension with Normal Tower Body Nos. 0 19,089.25 - 15.00 - 286,338.77 15.00 - 286,338.77
h) +4.5 m Leg Extension Nos. 0 23,681.00 - 16.00 - 378,896.00 16.00 - 378,896.00
i) +6 m Leg Extension Nos. 0 29,146.00 - 8.00 - 233,168.00 8.00 - 233,168.00
j) +7.5 m Leg Extension Nos. 0 30,968.00 - 6.00 - 185,808.00 6.00 - 185,808.00
k) +9 m Leg Extension Nos. 0 36,432.00 - 23.00 - 837,936.00 23.00 - 837,936.00
l) +18 m Leg Extension Nos. 22 38,254.00 841,588.00 - 22.00 - - 841,588.00 0.00 - -
m) +25 m Leg Extension Nos. 22 71,043.00 1,562,946.00 - 22.00 - - 1,562,946.00 0.00 - -
- - - - - -
5.6 Suspension Tower MA - - - - - -
a) Basic tower - - - - - -
a.1.1) With Normal Cross-Arm Nos. 10 311,494.00 3,114,940.00 - 3.00 - - 934,482.00 7.00 - 2,180,458.00
b) -4.5 m Leg Extension Nos. 0 3,881.00 - - - - 0.00 - -
c) -3 m Leg Extension Nos. 2 5,069.00 10,138.00 2.00 - 10,138.00 4.00 - 20,276.00
d) -1.5 m Leg Extension Nos. 3 7,287.00 21,861.00 - 3.00 - - 21,861.00 0.00 - -
e) +/- 0 m Leg Extension Nos. 20 9,108.00 182,160.00 - 12.00 - - 109,296.00 8.00 - 72,864.00
f) +1.5 m Leg Extension Nos. 3 10,930.00 32,790.00 1.00 - 10,930.00 4.00 - 43,720.00
g.1) +3 m Leg Extension with Basic Tower Body Nos. 12 18,216.00 218,592.00 - - - 12.00 - 218,592.00
h) +4.5 m Leg Extension Nos. 0 20,038.00 - 4.00 - 80,152.00 4.00 - 80,152.00
i) +6 m Leg Extension Nos. 12 23,681.00 284,172.00 - 12.00 - - 284,172.00 0.00 - -
j) +7.5 m Leg Extension Nos. 0 27,324.00 - - - - 0.00 - -
k) +9 m Leg Extension Nos. 3 27,324.00 81,972.00 - 3.00 - - 81,972.00 0.00 - -
- - - - - -
5.8 Tension Tower MD - - - - - -
a) Basic tower - - - - - -

ICB-PMD-MCTLP–016/17-01
Schedule-4 (a), Page 28 of 65

NEPAL ELECTRICITY AUTHORITY


PROJECT MANAGEMENT DIRECTORATE
Marsyangdi Corridor 220 kV Transmission Line Project, Udipur-Markichowk-Bharatpur Section DFR
###
Schedule No. 4: Installation and other Services Date: 02 November 2021 ###
(a): Installation and Construction Charges ###
Installation Charges 1st Amendment Final after 1st Amendment Remarks ###
Portion in Nepal Currency (in NRs) Foreign Local Currency ###
Contract
Sl. No. Item Description Unit Amount as Per
Qty. Amount as Per Contract Amount as Per Amount as Per
Unit Rate Amended Qty. Revised Qty. Amended Quantity ###
Qty. Revised Qty. (Local) Revised Qty.
(Foreign)
(1) (2) (3) (4a) (8) (9a)=(4a)x(8) ###
a.1.1) With Normal Cross-Arm Nos. 14 633,006.00 8,862,084.00 - 7.00 - - 4,431,042.00 7.00 - 4,431,042.00
b) -4.5 m Leg Extension Nos. 8 9,568.00 76,544.00 - 4.00 - - 38,272.00 4.00 - 38,272.00
c) -3 m Leg Extension Nos. 8 23,681.00 189,448.00 - 8.00 - - 189,448.00 0.00 - -
d) -1.5 m Leg Extension Nos. 28 30,968.00 867,104.00 - 28.00 - - 867,104.00 0.00 - -
e) +/- 0 m Leg Extension Nos. 8 34,611.00 276,888.00 12.00 - 415,332.00 20.00 - 692,220.00
f) +1.5 m Leg Extension Nos. 4 41,897.00 167,588.00 - 4.00 - - 167,588.00 0.00 - -
g.1) +3 m Leg Extension with Basic Tower Body Nos. 0 49,184.00 - 4.00 - 196,736.00 4.00 - 196,736.00
h) +4.5 m Leg Extension Nos. 38 52,827.00 2,007,426.00 - 34.00 - - 1,796,118.00 4.00 - 211,308.00
i) +6 m Leg Extension Nos. 0 61,935.00 - - - - 0.00 - -
j) +7.5 m Leg Extension Nos. 19 67,400.00 1,280,600.00 - 19.00 - - 1,280,600.00 0.00 - -
k) +9 m Leg Extension Nos. 0 72,864.00 - 12.00 - 874,368.00 12.00 - 874,368.00
- - - - - -
6 Installation of Earthing of towers - - - - - -
i. Pipe Type Nos. 133 4,800.00 638,400.00 - 33.00 - - 158,400.00 100.00 - 480,000.00
ii. Counterpoise Type Nos. 53 10,560.00 559,680.00 40.00 - 422,400.00 93.00 - 982,080.00
- - - - - -
7 Installation of following tower accessories - - - - - -
i. Danger Plate Nos. 186 30.00 5,580.00 5.00 - 150.00 191.00 - 5,730.00
ii. Number Plate Nos. 186 30.00 5,580.00 5.00 - 150.00 191.00 - 5,730.00
iii. Phase Plate ( Set of three) Sets 420 30.00 12,600.00 - 14.00 - - 420.00 406.00 - 12,180.00
iv. Circuit Plate(Set of two) Sets 420 30.00 12,600.00 - 14.00 - - 420.00 406.00 - 12,180.00
v. Anti climbimg device Nos. 186 5,000.00 930,000.00 5.00 - 25,000.00 191.00 - 955,000.00
vi. Bird Guard(set of three) Sets 90 30.00 2,700.00 9.00 - 270.00 99.00 - 2,970.00
- - - - - -
8 Protection of tower footing - - - - - -
Random rubble stone masonary including excavation (1:5 cement concrete) Cu.m. 28,140,000.00 - - - - 28,140,000.00
i) 4200 6,700.00 4200.00
ii) Stone bound in galvanising wire netting including excavation Cu.m. 2350 12,000.00 28,200,000.00 - - - 2350.00 - 28,200,000.00
iii) Back filling and levelling of volumes enclosed by revetment Cu.m. 6300 250.00 1,575,000.00 - - - 6300.00 - 1,575,000.00
iv) M15 Conc. Nominal Mix 1:2:4 for top seal cover Cu.m. 340 17,500.00 5,950,000.00 - - - 340.00 - 5,950,000.00
- - - - - -
Installation of insulator strings complete with arcing horns & - - - - - -
necessary hardware, installing of bundle conductor including fixing of
conductor accessories, installing & stringing of one earthwire
9
including fixing of one earthwire accessories (Twin bundle
Conductor) .

(i) Normal Stretch (Double Ckt. Portion) kms 59 415,000.00 24,485,000.00 8.50 - 3,527,500.00 67.50 - 28,012,500.00
Normal Stretch (Multi Ckt. Portion, two circuit with TWIN HTLS & two circuit kms 7,680,000.00 - 4.87 - - 4,675,200.00 - 3,004,800.00
(ii) with TWIN ACSR Bison conductor) 8 960,000.00 3.13
- - - - - -
10 OPTIC FIBRE CABLING - - - - - -
A. OPGW cable & Accessories - - - - - -
(a) 24 Fibre (DWSM) OPGW fibre optic cable km 70 70,000.00 4,900,000.00 0.63 - 44,100.00 70.63 - 4,944,100.00
Installation Hardware set for above 24 Fibre OPGW Fibre Optic cabling km 1,050,000.00 - - - - 1,050,000.00
(b) including all cable fittings & accessories except joint box 70 15,000.00 70.00
(c ) Joint box (24 Fibres) No. 21 16,000.00 336,000.00 - 6.40 - - 102,336.00 14.60 - 233,664.00
B. FODP - - - - - -
FODP 48F : Indoor Type, rack mounted with FCPC coupling and pig tails 100,000.00 - - - - 100,000.00
(a) No. 4 25,000.00 4.00
C. Fibre Optic approach cable - - - - 0.00 - -
(a) 24 Fibre (DWSM) km 2 175,000.00 350,000.00 - - - 2.00 - 350,000.00
Installation hardware set for above 24 Fibre, Fibre Optic Approach Cable Sets 100,000.00 - - - - 100,000.00
(b) 2 50,000.00 2.00
- - - - - -
11 A) Installation of following items for aviation requirements - - - - - -
i) Span markers No. 20 12,500.00 250,000.00 - - - 20.00 - 250,000.00
ii) Obstruction lights (to be provided as per IS 5613) 0 - - - - 0.00 - -
a) 1 Medium + 2low intensity Sets 12 125,000.00 1,500,000.00 - - - 12.00 - 1,500,000.00
b) 1 Medium + 4low intensity Sets 8 225,000.00 1,800,000.00 - - - 8.00 - 1,800,000.00
- - - - 0.00 - -
B) Painting of towers MT 480 5,500.00 2,640,000.00 - - - 480.00 - 2,640,000.00
- - - - - -
12 Pile Foundation: - - - - - -
No. of Pile Foundation No. 1 - - - - 1.00 - -
Boring, providing and installation of bored Cast-in-situ RCC vertical piles of - - - - - -
specified diameter and of any length below the pile cap with M25 grade of
cement concrete, excluding the cost of supply & placing the reinforcement
steel but including the cost of boring with temporary Guide casing,
bentonite solution and the length of pile to be embeded in the pile cap
12.1 (length of pile for payment shall be measured from bottom of pile cap), all
necessary labour, materials, plants, tools & tackles etc.,complete,as
necessary for proper execution of the job. (Boring in weathered rock, shale,
fissured rock and soft rock excluded).

a) 1200mm diameter R.C.C.vertical bored pile upto 30 m from bottom of Meter 11,000,000.00 - - - - 11,000,000.00
pile cap. 500 22,000.00 500.00

ICB-PMD-MCTLP–016/17-01
Schedule-4 (a), Page 29 of 65

NEPAL ELECTRICITY AUTHORITY


PROJECT MANAGEMENT DIRECTORATE
Marsyangdi Corridor 220 kV Transmission Line Project, Udipur-Markichowk-Bharatpur Section DFR
###
Schedule No. 4: Installation and other Services Date: 02 November 2021 ###
(a): Installation and Construction Charges ###
Installation Charges 1st Amendment Final after 1st Amendment Remarks ###
Portion in Nepal Currency (in NRs) Foreign Local Currency ###
Contract
Sl. No. Item Description Unit Amount as Per
Qty. Amount as Per Contract Amount as Per Amount as Per
Unit Rate Amended Qty. Revised Qty. Amended Quantity ###
Qty. Revised Qty. (Local) Revised Qty.
(Foreign)
(1) (2) (3) (4a) (8) (9a)=(4a)x(8) ###
- - - - 0.00 - -
Extra over item 12.1 for boring including socketing, anchoring (if required) Meter 800,000.00 - - - - 800,000.00
with required size,nos. & depth of Reinforcement in weathered rock, shale,
12.2 fissured rock soft rock and hard rock upto a maximum depth of 5.0m. 32 25,000.00 32.00

- - - - 0.00 - -
Excavation whereever required for pile cap /tie etc. (other than boring) for Cu.m. 7,000.00 - - - - 7,000.00
all depth and size, in all types of soils including disposal of excavated
materials for all lifts and leads,decent etc.as directed by Engineer - In -
12.3 charge,together with all labour,tools & tackles,sheeting, sheet 7 1,000.00 7.00
piling,dewatering etc. complete as required for proper execution of the job.

- - - - 0.00 - -
Back filling with available excavated earth for all leads and lifts in sides of Cu.m. 250.00 - - - - 250.00
foundations and other under ground facilities in horizontal layers not
12.4 exceeding 20 cm. in depth conso- lidating each deposited layer by ramming 1 250.00 1.00
and watering etc.
- - - - 0.00 - -
Form work for placing plain or reinforced cement concrete of any type Sq.m. 99,000.00 - - - - 99,000.00
including blockout and section at any elevation including all labour,
12.5 materials, equipments, waste for form, oring,shuttering,strutting,propping, 165 600.00 165.00
scaffolding,tieing,nailing, caulking, dismantling & removal of forms etc.
complete.
- - - - 0.00 - -
Supply and placing of steel reinforcement of specified grade for R.C.C. work M.T. 4,180,000.00 - - - - 4,180,000.00
12.6 in pile,pile cap, pedestal / chimney, tie beam (if required) including 38 110,000.00 38.00
straightening, cutting, bending, binding etc. all complete
- - - - 0.00 - -
Providing and laying in position M25 Grade concrete of specified 28 days Cu.m. 3,987,500.00 - - - - 3,987,500.00
strength for pile caps, pedestal/chimney and tie beam(if required),
excluding reinforcement steel and form work but including cement, all
necessary tools and tackles,labour, materials, equipments for
12.7 145 27,500.00 145.00
handling,transpor- tation, batching, mixing,placing, vibrating,dewatering etc.
all complete (excluding cost of concrete in piles which is included in item
no.12.1).

- - - - 0.00 - -
Providing and laying plain cement concrete 1:4:8 (1cement : 4 coarse sand: Cu.m. 105,000.00 - - - - 105,000.00
8 graded stone aggregate 40mm nominal size) including cement, all
12.8 necessary tools and tackles,labour, materials, equipments for 7 15,000.00 7.00
handling,transportation,mixing,placing, vibrating,dewatering etc.all
complete.
- - - - 0.00 - -
Conducting Standard Penetration Test (SPT) at various elevations in pile Nos. 4,800,000.00 - - - - 4,800,000.00
bore holes in all kind of soils including all labour, materials, tools and
12.9 tackles, equipments etc. required labour, materials, tools and tackles, 40 120,000.00 40.00
equipments etc. required for successful completion of the job.

- - - - 0.00 - -
Supply and Providing M.S. liner of 6mm. thick in piles upto 10m. Depth MT 2,610,000.00 - - - - 2,610,000.00
(maxm.) from bottom of pile cap, limited to the approved drawing, including
supply, straightening, bending, welding,all supports, labours, tools and
12.10 tackles, plants & equipments, with primer and paintinting etc. (complete) as 29 90,000.00 29.00
required for successful completion of the job

- - - - 0.00 - -
Conducting integrity test on pile using eloctronic control unit, hand held Nos. 800,000.00 - - - - 800,000.00
hammer, accelerometer, computer with required software to assess as-
12.11 installed pile characterestics including mobilisation of necessary manpower, 16 50,000.00 16.00
equipments,materials etc. required for successful completion of the job

- - - - 0.00 - -
13 Installation of following softwares - - - - 0.00 - -
i) PLS-CADD (multiuser license for 10 users- with individual keys) Set 1 - - 1.00 - 22,500.00 - 0.00 - -
ii) PLS-TOWER (multiuser license for 10 users- with individual keys) Set 1 - - 1.00 - 22,500.00 - 0.00 - -
- - - - 0.00 - -
Cost for supervision works to be imparted by the prinicipal Core - - - - - -
14 Manufacturer during the installation of HTLS conductor at site 0.00
i) Engineer Mdays 180 - - - - 180.00 216,000.00 -
ii) Supervisor Mdays 180 - - - - 180.00 90,000.00 -
- - - - -
TOTAL INSTALATION SERVICES (Total of column 7 and 9 to be carried
776,644,047.00 - 45,000.00 - 11,639,993.98 361,910.00 765,004,053.02
forward to Schedule No. 5: Grand Summary)

ICB-PMD-MCTLP–016/17-01
Schedule-4(b), Page 30 of 65

NEPAL ELECTRICITY AUTHORITY


PROJECT MANAGEMENT DIRECTORATE
Marsyangdi Corridor 220 kV Transmission Line Project, Udipur-Markichowk-Bharatpur Section
Contract No. :- ICB-PMD-MCTLP-016/17-01
Revised BoQ
Schedule No. 4 : Installation and Other Services
(b):Training Charges for training to be imparted abroad Date: 02 November 2021

Sl. Description Item for which training is to be imparted. Country where Nos. of Training Total Training Charges
No. training is to be Trainee duration in
imparted days Currency# Rate per Total
trainee per day Training Charges

(1) (2) (3) (4) (5) (6) (7) (8)=4x5x7

Training to Owners personnel on use & i) EHV Transmission Line Design using PLS CADD : 8 14 USD 800 89,600.00
application of the softwares ii) EHV Transmission Tower Design using PLS-Tower : 4 10 USD 800 32,000.00
Total for Training Charges (Total of 121,600.00
column 8 to be carried forward to
Schedule No. 5: Grand Summary)

Name of Bidder:
Signature of Bidder:
(Printed Name)
(Designation)
(Common Seal)

ICB-PMD-MCTLP–016/17-01
Schedule-4(c), Page 31 of 65

NEPAL ELECTRICITY AUTHORITY


PROJECT MANAGEMENT DIRECTORATE
Marsyangdi Corridor 220 kV Transmission Line Project, Udipur-Markichowk-Bharatpur Section
Contract No. :- ICB-PMD-MCTLP-016/17-01
Revised BoQ
Schedule No. 4 : Installation and Other Services
(c):Training Charges for training to be imparted to Employer's Personnel by Bidder's Instructor in Nepal Date: 02 November 2021

Training Charges for Contractors Trainers


Training
Sl. No. Description of the Test Item for which training is to be imparted. Total
duration in days Currency Rate per day
Training Charges
(1) (2) (3) (4) (5) (6) (7) = 4x 6
HTLS Conductor Installation, O&M for 20
1 HTLS Conductor Installation Operation and Maintenance 21 NRs 250000 5,250,000.00
Supervisors/Engineers
Total for Training Charges ( total of column 7 To 5,250,000.00
be carried forward to Schedule 5: Grand
Summary)

Name of Bidder:
Signature of Bidder:
(Printed Name)
(Designation)
(Common Seal)

ICB-PMD-MCTLP–016/17-01
Schedule-4(d), Page 32 of 65

NEPAL ELECTRICITY AUTHORITY


PROJECT MANAGEMENT DIRECTORATE
Marsyangdi Corridor 220 kV Transmission Line Project, Udipur-Markichowk-Bharatpur Section
Contract No. :- ICB-PMD-MCTLP-016/17-01
Revised BoQ
Schedule No. 4 : Installation and Other Services
(d): Type Test charges for Type Tests to be conducted abroad Date: 02 November 2021
Country of
Sl. No. Description of Tests Unit Qty. Currency # Unit Rate Amount
Testing
(1) (2) (3) (4) (5) (6) (7) (8)=(5) x ( 7)
1 Proto Type Testing of towers
1.1 Tower Type DA with 9 m extension No. 1 USD 60,000.00 60,000.00
1.2 Tower Type DB with 9 m extension No. 1 90,000.00 90,000.00
1.3 Tower Type DC with 9 m extension No. 1 105,000.00 105,000.00
1.4 Tower Type DD with 9 m extension No. 1 145,000.00 145,000.00
1.6 Tower Type MA with 9 m extension No. 1 210,000.00 210,000.00
1.7 Tower Type MD with 9 m extension No. 1 250,000.00 250,000.00
2 (i) On complete HTLS Conductor -
a) DC resistance test on stranded conductor No. 1 300 300.00
b) UTS test on stranded conductor No. 1 250 250.00
c) Radio interference voltage test (dry) No. 1 1500 1,500.00
d) Corona extinction voltage test (dry) No. 1 500 500.00
e) Stress- Strain test on stranded conductor and core at room temperature No. 1 1500 1,500.00
f) Stress-strain test on stranded conductor and core at elevated temperature No. 1 2500 2,500.00
g) High temperature endurance & creep test on stranded conductor No. 1 15000 15,000.00
h) Sheaves Test No. 1 700 700.00
i) Axial Impact Test No. 1 30000 30,000.00
j) Radial Crush Test No. 1 300 300.00
k) Torsional Ductility Test No. 1 300 300.00
l) Aeolian Vibration Test No. 1 2000 2,000.00
m) Temperature Cycle Test No. 1 13000 13,000.00
-
2 (ii) On HTLS Conductor Strand/core -
a) Heat resistance test on Aluminium Alloy strands or core No. 1 200 200.00
b) Bending test on aluminium clad core (if applicable) No. 0 100 -
c) Compression test on aluminium clad core (if applicable) No. 0 300 -
d) Coefficient of linear expansion on core wire No. 1 500 500.00
e) Strand Brittle fracture test (for composite core only) No. 1 1200 1,200.00
f) Bending test on composite core No. 1 4000 4,000.00
-
3 7/3.35 mm GS Earthwire -
3.1 UTS Test No. 1 500.00 500.00
D.C. Resistance Test Currency:- No. 1 500.00 500.00

TOTAL (Total of column 8 to be carried forward to Schedule No. 5: Grand Summary) 934,750.00
# Specify currency in accordance with BDS ITB Clause 19.1, Part-I of the Bidding Documents.

Name of Bidder:
Signature of Bidder:
(Printed Name)
(Designation)
(Common Seal)

ICB-PMD-MCTLP–016/17-01
Schedule-5, Page 33 of 65

NEPAL ELECTRICITY AUTHORITY


PROJECT MANAGEMENT DIRECTORATE
Marsyangdi Corridor 220 kV Transmission Line Project, Udipur-Markichowk-Bharatpur Section
Contract No. :- ICB-PMD-MCTLP-016/17-01
Revised BoQ
Schedule No. 5: Grand Summary Date: 02 November 2021
As per Bidding Price Schedule Amendment Final after Amendment

Sl. No. Description Total Price Foreign Total Price Local Total Price Foreign Total Price Local Total Price Foreign Total Price Local
(USD) (NRS) (USD) (NRS) (USD) (NRS)

1 TOTAL SCHEDULE NO. 1


Plant and Equipment including Mandatory Spares to be supplied from abroad. 15,143,903.31 - 715,342.27 15,859,245.58 -
2 TOTAL SCHEDULE NO. 2
Plant and Equipment including Mandatory Spares Parts to be supplied from within Nepal - - -
3 TOTAL SCHEDULE NO. 3
Design Services 50,000.00 - 50,000.00
4 TOTAL SCHEDULE NO. 4
(a) Installation and construction charges 406,910.00 776,644,047.00 - 45,000.00 - 11,639,993.98 361,910.00 765,004,053.02
(b) Training charges for training to be imparted abroad 121,600.00 - 121,600.00 -
( c) Training charges for training to be imparted in Nepal 5,250,000.00 5,250,000.00
(d) Type Tests charges for type Tests to be conducted abroad 934,750.00 934,750.00

GRAND TOTAL [1+2+3+4] 16,657,163.31 781,894,047.00 670,342.27 - 11,639,993.98 17,327,505.58 770,254,053.02

Name of Bidder:
Signature of Bidder:
(Printed Name)
(Designation)
(Common Seal)

ICB-PMD-MCTLP–016/17-01
Summary, Page 34 of 65

NEPAL ELECTRICITY AUTHORITY


PROJECT MANAGEMENT DIRECTORATE
Marsyangdi Corridor 220 kV Transmission Line Project, Udipur-Markichowk-Bharatpur Section
Contract No. :- ICB-PMD-MCTLP-016/17-01
Date: 02 November 2021
Revised BoQ
SN Description Contract Price Amended Price Change Change in %
1 Foreign Currency 16,657,163.31 17,327,505.58 670,342.27 4.02%
2 Local Currency 781,894,047.00 770,254,053.02 - 11,639,993.98 -1.49%
3 Total NPR Equivalent 2,603,188,283.32 2,664,843,513.21 61,655,229.89 2.37%

Exchange Rate of Bid 109.34


Opening Date

ICB-PMD-MCTLP–016/17-01
NEPAL ELECTRICITY AUTHORITY
220 KV UDIPUR - MARKICHOWK - BHARATPUR TRANSMISSION LINE
Line accessories - Quantity Eastimation
Date 21 June 2021

3.1 Tower acccessories : Danger Plate Qty 198 Nos


twr x 198 qty = nos
(NEA Schedule = 186 Nos)

3.2 Tower acccessories : Number Plate Qty 198 Nos


198 twr x 1 qty = 198 nos
(NEA Schedule = 186 Nos)

3.3 Tower acccessories : Phase Plate (set of three) Qty 420 Nos
D/C 186 twr x 2 ckt = 372 nos
M/C 12 twr x 4 ckt = 48 nos
Total = 420 Nos
(NEA Schedule = 420 Nos)

3.4 Tower acccessories : Circuit Plate (set of two) Qty 210 Nos
D/C 186 twr x 1 plt = 186 nos
M/C 12 twr x 2 plt = 24 nos
Total = 210 Nos
(NEA Schedule = 420 Nos)

3.5 Tower acccessories : Anticlimbing Devices Qty 198 Nos


198 twr x 1 qty = 198 nos
(NEA Schedule = 186 Nos)

3.6 Tower acccessories : Bird Guard (set of three) Qty 128 Nos
DD/DDR 3 PI x 65 twr = 195 nos
2 DE 6 PI x 2 DE twr = 12 nos
DDSR 3 PI x 22 twr = 66 nos
MD 24 PI x 6 twr =144 nos
No of Pilot Insulator =417 Nos
Bird guard = 420/3 per set =
Total = 140 Nos
(NEA Schedule = 90 Nos) 37.24032

4 Line Material : 7/3.35mm Earthwire Qty 69.971 Kms


4.1 Line length - 67.280 x 1.04 (wastages) = 69.971 kms
(NEA Schedule = 70 Kms)

4.2 Line Material : HTLS Conductor Qty 839.6419 Kms


D/C 64.295 x 6x 2 = 771.54
M/C 2.984 x 6 x 2 = 35.808
Total = 807.348 x 1.04 = 839.642
(NEA Schedule = 832 Kms)

4.3.2 Insulator : 160 kN Long rod Composite Insulator Qty 4608 Nos
DB/DBR 6 C/A x 2 sides x 2 insu x 70 twr = 1680 nos 1680
DC/DCR 6 C/A x 2 sides x 2 insu x 27 twr = 648 nos 648
DD/DDR/DDSR 6 C/A x 2 sides x 2 insu x 89 twr = 2160 nos 2136
MD 6 C/A x 2 sides x 2 insu x 6 twr =144 nos 144
Total = 4608 Nos
(NEA Schedule = 3684 Nos)
4.3.1 Insulator : 120 kN Long rod Composite Insulator Qty 612 Nos
DD 6 PI x 43 twr = 258 nos 258
DDR 6 PI x 24 twr = 144 nos 144
DDSR 6 PI x 23 twr =138 nos 138
MA 6 PI x 6 twr = 36 nos 36
MD 6 PI x 6 twr = 36 nos 36
Total = 612 Nos
(NEA Schedule = 678 Nos)

4.4 Hardware Fittings suitable for HTLS conductor


4.4.1 Double "I" Suspension Insulator String (except clamps)
MA 6 x 6 = 36 Nos Qty 36 Nos
(NEA Schedule = 186 Nos)

4.4.2 Single 'I' Suspension PILOT String (except clamps) Qty 570 Nos
DD 43 x 6 PI = 258 Nos 258 Nos
DDR 24 x 6 PI = 144 Nos 144 Nos
DDSR 22 x 6 PI = 132 Nos 132 Nos
MD 6 x 6 PI = 36 Nos 36 Nos
(NEA Schedule = 306 Nos)

4.4.3 Double Tension Insulator String (except clamps) Qty 2304 Nos
DB 53 x 12 = 636 Nos 636 Nos
DBR 17 x 12 = 204 Nos 204 Nos
DC 13 x 12 = 156 Nos 156 Nos
DCR 14 x 12 = 168 Nos 168 Nos
DD 43 x 12 = 516 Nos 516 Nos
DDR 24 x 12 = 288 Nos 288 Nos
DDSR 22 x 12 = 264 Nos 264 Nos
MD 6 x 12 = 72 Nos 72 Nos
(NEA Schedule = 1842Nos)

4.5 Clamps for Hardware fittings suitable for HTLS conductor


1) Suspension clamp suitable for suspension insulator string 72 MA 6 x 12 = 72
2) Suspension clamp suitable for suspension Pilot insulator string 72 MD 6 x 12 = 72
3) Dead end clamp for tension insulator string 2304 DB/DBR 70 x 12 + DC/DCR 27 X 12 + DD/DDR 67 X 12 + DDSR 22 X 12 + MD 6 X12 = 2304

4.6 Insulator for 220 ckt with twin ACSR Bison


1 120 KN Disc Insulator 144 MA 6 C/A x 2 sides x 2 insu x 6 twr = 144 nos
2 160 KN Disc Insulator 144 MD 6 C/A x 2 sides x 2 insu x 6 twr = 144 nos

4.7 Hardware Fittings suitable for Twin Bison conductor


i) Single "I" Suspension Insulator String with necessary clamps 72 MA 6 Twr x 12 PI = 72
ii) Double Tension Insulator String with necessary clamps 72 MD 6 Twr x 12 PI =72
iii) Single 'I' Suspension PILOT String with necessary clamps 36 MD 6 Twr x 6 PI = 36

4.8 Conductor and Earthwire Accessories


i) Mid span compression joint for HTLS conductor 604 876 km / 1.5 km (drum length) = 584 + 20 extra(NEA Schedule = 508 Nos)
ii) Mid span compression joint for ACSR Bison conductor 72 100 km /1.5 km (drum length) = 67 + 5 extra (NEA schedule = 61 Nos.)
iii) Mid span compression joint for 7/3.35mm GS earthwire 49 70 km / 1.5 km (drum length) = 47 + 2 extra
iv) Repair Sleeve for HTLS conductor 584 876 km / 1.5 km (drum length) = 584
v) Repair Sleeve for ACSR Bison conductor 72 100 km /1.5 km (drum length) = 67 + 5 extra (NEA schedule = 61 Nos.)
vi) Flexible Copper Bond for 7/3.35mm GS Earthwire 390 (193 twr + 2 gantry)x(1=GW)x(2 for tension twr)
vii) Vibration Damper for for 7/3.35mm GS Earthwire 1276 Refer Drum Schedule sheet (638 x 2 sides = 1276
viii) Vibration Damper for ACSR Bison conductor 932 As per previous BoQ
ix) Rigid Spacer for HTLS conductor 3176
x) Rigid Spacer for ACSR Bison conductor 303 As per previous BoQ
xi) Bundle Spacer for ACSR Bison conductor 945 As per previous BoQ
xii) Earthwire Suspension Clamp 6 MA 6 Twr x 1 = 6 Nos
xiii) Earthwire Tension Clamp 380 {(193-6) twr + 2 gantry)}x 2 sides
xiv ) Vibration Damper for HTLS conductor 15812
xv) Bundle Spacer for HTLS conductor 8483 390

ix) Conductor Accessories : Rigid Spacers for HTLS (Jumper)


DB/DBR 6 C/A x 3 spacer x (53+17) twr = 1260 nos
DC/DCR 6 C/A x 3 spacer x (11+14) twr = 450 nos
DD/DDR/DDSR (2x3 Left C/A + 3x3 Right C/A) x (41+24+21) twr = 1290 nos
MD (2x3 Left C/A + 3x3 Right C/A) x 6 twr = 90 nos
D/C Gantry 6 C/A x 3 spacers x 1 gantry = 18 nos
M/C Gantry 6 C/A x 3 spacers x 1 gantry = 18 nos
Total = 3126 Nos + 50 Extra = 3176 nos
(NEA Schedule = 2722 Nos)

x) Conductor Accessories : Rigid Spacers for ACSR (Jumper)


MD (2x3 Left C/A + 3x6 Right C/A) x 6 twr = 90 nos
M/C Gantry 6 C/A x 3 spacers x 1 gantry = 18 nos
Total = 108 Nos + 1 Extra = 109 nos
(NEA Schedule = …... Nos)

xiv) Conductor Accessories : Vibration Dampers for HTLS Qty 15812 Nos
D/C 604 Nos in one wire x 6 wires x 2 twin x 2 sides = 14496 nos
M/C 26 on one wire x 6 wires x 2 twin x 2 sides = 624 nos
Gantry D/C 6 nos ; M/C 6 nos = 12 nos
Total = 15132 Nos + 50 Extra = 15182 nos
(NEA Schedule = 8140 Nos)

xv) Conductor Accessories : Bundle Spacers for HTLS Qty 8483 Nos
D/C 64.295 km x 6 C/A x 20 per km = 7716 nos
M/C 2.984 km x 12 C/A x 20 per km = 717 nos
Total = 7716 Nos + 717 + 50 Extra = 8483 Nos
(NEA Schedule = 7236 Nos)

4.9.1 24 Fibre (DWSM) OPGW fibre optic cable. Qty 73.02 Km


Refer Drum Schedule sheet = 73.02km
(NEA Schedule = 70km)

a) Suspension Assembly Qty 7 sets


Refer Drum Schedule sheet =7 sets
(NEA Schedule = 30 sets

b) Dead End Assembly Qty 4 sets


Refer Drum Schedule sheet =4 sets
(NEA Schedule = 4 sets

c) Tension Assembly (For joint Box Location) Qty 37 sets


Refer Drum Schedule sheet =37 sets
(NEA Schedule = 42 sets

d) Pass through assembley Qty 125 sets


Refer Drum Schedule sheet = 125 sets
(NEA Schedule = 125 sets)

e) Special Fitting Assembly at suspension tower (for joint box locations) = 2 sets 2 Sets
(NEA schedule = 2)
f) Vibration Damper (NEA Schedule = 600 Sets
g) Down Lead Clamp Assembly (NEA Schedule = 646 Nos.)
iii) Joint Box (24 fibre) {NEA Schedule = 21 Nos.}

4.9.2 FODP
i) FODP 48F : Indoor type, rack mounted with FCPC coupling and pig tails (5 Mtrs each) 4 Nos
(NEA Schedule = 4 Nos)

4.9.3 Fibre Optic approach cable


Km.
2
i) 24 Fibre (DWSM) 2 Set
ii) Installation hardware set for above 24 Fibre, Fibre Optic Approach Cable

4.10 Mandatory Spares of OPGW Cabling


4.10.1 OPGW cable & Accessories
Km.
4
i) 24 Fibre (DWSM) OPGW fibre optic cable
ii) Installation Hardware set for above 24 Fibre OPGW Fibre Optic cabling including all cable fittings
Sets
& accessories except joint box 2
a) Suspension Assembly 2 Sets
b) Dead End Assembly 1 Sets
c) Tension Assembly (For joint Box Location) 6 Sets
d) Pass through Assembly 1 Sets
e) Special Fitting Assembly at suspension tower (for joint box locations) 30 Sets
f) Vibration Damper 33 No.
g) Down Lead Clamp assemblies 1 No.
iii) Joint Box (24 fibre)

4.10.2 Fibre Optic approach cable


Km.
4
i) 24 Fibre (DWSM) 1 Set
ii) Installation hardware set for above 24 Fibre, Approach Fibre Optic Cable

5 Supply of following items for aviation requirements 20 Nos.


i) Span markers
ii) Obstruction lights (to be provided as per IS 5613) 12 Sets.
a) 1 Medium + 2low intensity 8 Sets.
b) 1 Medium + 4low intensity

6 Supply of following softwares 1 Set


i) PLS-CADD (multiuser license for 10 users- with individual keys) 1 Set
ii) PLS-TOWER (multiuser license for 10 users- with individual keys)
Weight List (DB/DBR)

Price of Stub as per


Sl. No. Tower Type Raised Chimney Weight of Stub Unit weight Total Price
masterlist

- 168.85 136.74 1.00 136.74


1.00 203.59 1.00 204.04
2.00 238.34 1.00 238.87
1 DB 3.00 273.09 1.00 273.69
4.00 340.54 1.00 341.29
5.00 375.29 1.00 376.12
6.00 410.03 1.00 410.94

Combined Combined
Description Weight DBR Weight
DB Weight Weight
Peak, X-Arm & CAGE-I 1,569.72 Peak, X-Arm & CAGE-I 1,666.55
CAGE-II 2,505.20 CAGE-II 2,598.85
TOP X-ARM 496.69 TOP X-ARM 547.22
MIDDLE X-ARM 529.17 MIDDLE X-ARM 579.78
BTM X-ARM 630.98 BTM X-ARM 659.96
BODY 3,302.03 BODY 3,320.82
G-G PLAN (BODY) 135.16 G-G PLAN (BODY) 134.88
TOTAL BASIC BODY 9,168.93 9,168.93 TOTAL BASIC BODY 9,508.06
-4.5M LE 357.64 1,430.55 -4.5M LE 357.64
-3.0M LE 465.86 1,863.42 -3.0M LE 465.86
-1.5M LE 598.69 2,394.78 -1.5M LE 620.30
0M LE 776.35 3,105.39 12,274.32 0M LE 774.758
+1.5M LE 889.54 3,558.16 +1.5M LE 889.54
+3.0M LE +3.0M LE
With Basic Body 1,056.63 4,226.51 With Basic Body 1,056.63
PLAN H-H 141.65 566.61 PLAN H-H 141.65 566.61
With Normal Body 388.44 530.10 With Normal Body 388.44 530.09
+4.5M LE 518.22 659.87 +4.5M LE 518.22 659.87
+6.0M LE 678.56 820.22 +6.0M LE 678.56 820.22
+7.5M LE 841.17 982.82 +7.5M LE 841.17 982.82
+9.0M LE 1,006.35 1,148.00 +9.0M LE 1,004.32 1,145.98
TOTAL WEIGHT UPTO +9.0M
WT Summary (DC/DCR)

Price of Stub
Sl. No. Tower Type Raised Chimney Weight of Stub as per Unit weight Total Price
masterlist

- 213.119 148.780 0.911 148.780


1.000 258.454 0.911 235.455
2.000 303.789 0.911 276.755
1 DC 3.000 349.124 0.911 318.056
4.000 437.198 0.911 398.292
5.000 482.532 0.911 439.592
6.000 527.867 0.911 480.893

Description Weight Combined Weight Description Weight Combined Weight


DC DCR
Peak, X-Arm & CAGE-I 1,730.307 1,730.307 Peak, X-Arm & CAGE-I 1,765.466 1,765.466
CAGE-II 2,746.812 2,746.812 CAGE-II 2,794.024 2,794.024
TOP X-ARM 700.093 700.093 TOP X-ARM 713.682 713.682
MIDDLE X-ARM 714.991 714.991 MIDDLE X-ARM 728.712 728.712
BTM X-ARM 811.008 811.008 BTM X-ARM 825.361 825.361
BODY 3,892.644 3,892.644 BODY 3,883.406 3,883.406
H-H PLAN (BODY) 134.480 134.480 G-G PLAN (BODY) 134.200 134.200
TOTAL BASIC BODY 10,313.260 10,313.260 TOTAL BASIC BODY 10,844.851 10,844.851
-4.5M LE 406.693 406.693 -4.5M LE 406.693 406.693
-3.0M LE 541.207 541.207 -3.0M LE 541.207 541.207
-1.5M LE 695.157 695.157 -1.5M LE 695.157 695.157
0M LE 910.361 910.361 0M LE 910.361 910.361
+1.5M LE 1,063.948 1,063.948 +1.5M LE 1,063.948 1,063.948
+3.0M LE +3.0M LE
With Basic Body 1,242.024 1,242.024 With Basic Body 1,242.024 1,242.024
Plan H-H 144.568 578.272 Plan H-H 144.568 578.272
With Normal Body 469.360 613.928 With Normal Body 469.360 613.928
+4.5M LE 599.709 744.277 +4.5M LE 599.709 744.277
+6.0M LE 775.488 920.056 +6.0M LE 775.488 920.056
+7.5M LE 981.401 1,125.969 +7.5M LE 981.401 1,125.969
+9.0M LE 1,167.821 1,312.389 +9.0M LE 1,167.821 1,312.389
WT Summary (DD/DDR)

Price of Stub as
Sl. No. Tower Type Raised Chimney Weight of Stub Unit price Total Price
per masterlist

- 348.59 255.42 0.93 255.42


1.00 411.11 0.93 383.59
2.00 473.69 0.93 441.98
1 DD 3.00 536.21 0.93 500.31
4.00 665.74 0.93 621.16
5.00 728.26 0.93 679.50
6.00 790.78 0.93 737.83

Combined
Description Weight Combined Weight Description Weight
DD DDR Weight
Peak, X-Arm & CAGE-I 1,839.81 1,839.812 Peak, X-Arm & CAGE-I 1,930.299 1,930.299
CAGE-II 5,315.68 5,315.679 CAGE-II 5,373.949 5,373.949
TOP X-ARM 694.48 694.480 TOP X-ARM 780.343 780.343
MIDDLE X-ARM 713.86 713.858 MIDDLE X-ARM 791.943 791.943
BTM X-ARM 941.74 941.736 BTM X-ARM 1,029.692 1,029.692
BODY 5,171.69 5,171.688 BODY 5,157.063 5,157.063
G-G PLAN (BODY) 162.32 162.324 H-H PLAN (BODY) 162.044 162.044
Hikmat:
TOTAL BASIC BODY 14,839.58 14,839.577 13,846.000 0.93 TOTAL BASIC BODY 15,225.333 15,225.333
Average Unit Price/Kg
-4.5M LE 516.59 516.585 -4.5M LE 515.695 515.695
-3.0M LE 693.15 693.150 -3.0M LE 692.081 692.081
-1.5M LE 892.76 892.759 -1.5M LE 891.510 891.510
+0M LE 1,155.62 1,155.616 0M LE 1,153.576 1,153.576
+1.5M LE 1,371.12 1,371.123 +1.5M LE 1,368.714 1,368.714
+3.0M LE Author: +3.0M LE
+3.0M LE (With Basic Body) 1,553.39 1,553.389 738.12 Unit Price of +3.0M LE With Basic Body 1,550.939 1,550.939
Plan H-H 193.85 775.40 combined with Basic Body Plan J-J 194.270 777.080
+3.0 m LE (With Normal Body) 597.24 791.088 With Normal Body 596.575 790.845
+4.5M LE 809.95 1,003.798 +4.5M LE 808.276 1,002.546
+6.0M LE 1,027.57 1,221.419 +6.0M LE 1,025.945 1,220.215
+7.5M LE 1,287.99 1,481.837 +7.5M LE 1,285.841 1,480.111
+9.0M LE 1,530.13 1,723.976 +9.0M LE 1,515.993 1,710.263
Plan R-R & View-N 1,975.92 Plan R-R & View-N 1,973.98
+18.0M LE 6,491.03 2,116.74 +18.0M LE 6,484.92 2,114.73
Plan S-S & View-P 2,461.99 Plan S-S & View-P 2,459.82
+25.0M LE 6,097.42 2,139.85 +25.0M LE 6,094.06 2,138.47
WT Summary (DD/DDR)

Price of Stub as Unit


Sl. No. Tower Type Raised Chimney Weight of Stub Total Price RC Actual
per masterlist weight

- 346.93 296.70 0.96 296.70 0m


1.00 409.93 392.26 0.96 392.26 1.5m 422.401 404.191
2.00 472.93 452.54 0.96 452.54 3m 512.884 490.773
1 DDS 3.00 535.99 512.88 0.96 512.88 4.5m 668.420 639.603
4.00 667.01 638.25 0.96 638.25 6m 758.875 726.158
5.00 730.07 698.59 0.96 698.59
6.00 793.07 758.87 0.96 758.87

DDS Description Weight Combined Weight DDSR Description Weight Combined Weight

Peak, X-Arm & CAGE-I Peak, X-Arm & CAGE-I 2,181.097 2,181.097
CAGE-II CAGE-II 5,630.759 5,630.759
TOP X-ARM TOP X-ARM 975.924 975.924
MIDDLE X-ARM MIDDLE X-ARM 985.511 985.511
BTM X-ARM BTM X-ARM 1,259.803 1,259.803
BODY BODY 5,765.791 5,765.791
H-H PLAN (BODY) H-H PLAN (BODY) 199.896 199.896
Hikmat:
TOTAL BASIC BODY 15,503.38 15,503.38 14,835.00 0.96 TOTAL BASIC BODY 15,968.479 15,968.479
Average Unit Price/Kg
-4.5M LE 521.40 521.40 -4.5M LE 521.40 521.396
-3.0M LE 601.00 601.00 -3.0M LE 601.00 601.004
-1.5M LE 761.64 761.64 -1.5M LE 761.64 761.643
0M LE 965.77 965.77 0M LE 965.77 965.774
+1.5M LE 1,150.52 1,150.52 +1.5M LE 1,150.52 1,150.516
+3.0M LE +3.0M LE -
With Basic Body 1,316.66 1,316.66 With Basic Body 1,316.66 1,316.657
PLAN J-J 831.38 207.84 PLAN J-J 866.744 216.69
With Normal Body 866.42 1,074.26 829.07 With Normal Body 866.42 1,083.106
+4.5M LE 972.23 1,180.08 +4.5M LE 972.23 1,188.920
+6.0M LE 1,078.05 1,285.89 +6.0M LE 1,078.05 1,294.731
+7.5M LE 1,360.69 1,568.53 +7.5M LE 1,360.69 1,577.373
+9.0M LE 1,519.36 1,727.21 +9.0M LE 1,519.36 1,736.050
-
TOTAL WEIGHT UPTO +9.0M TOTAL WEIGHT UPTO +9.0M -
PLAN R-R (+18.0M) 764.48 PLAN R-R (+18.0M) 764.48
VIEW-N (+18.0M) 1,122.65 VIEW-N (+18.0M) 1,122.65
+18.0M LE 6,788.16 2,168.82 +18.0M LE 6,788.16 2,168.823
-
PLAN S-S (+25.0M) 1,371.07 PLAN S-S (+25.0M) 1,371.07
VIEW-P (+18.0M) 947.29 VIEW-P (+18.0M) 947.29
+25.0M LE 6,568.49 2,221.71 +25.0M LE 6,568.49 2,221.713
Weight Summary (MA)

Price of Stub
Sl. No. Tower Type Raised Chimney Weight of Stub as per Unit weight
masterlist

- 348.59 210.70 1.00


1.00 - 1.00
2.00 - 1.00
1 MA 3.00 - 1.00
4.00 - 1.00
5.00 - 1.00
6.00 - 1.00

Description Weight Total Wt./Tower


MA
Peak, X-Arm & CAGE-I 1,182.76
CAGE-II 3,154.88
CAGE-III 4,314.95
X-ARM-1 446.34
X-ARM-2 440.09
X-ARM-3 471.23
X-ARM-4 484.39
X-ARM-5 523.73
X-ARM-6 557.26
BODY 5,119.72
G-G PLAN (BODY) 177.95
TOTAL BASIC BODY 16,873.29 16,873.29
-4.5M LE
-3.0M LE
-1.5M LE
0M LE 756.71 756.71
+1.5M LE -
+3.0M LE -
With Basic Body -
PLAN H-H 138.78 555.13
With Normal Body -
+4.5M LE -
+6.0M LE -
+7.5M LE -
+9.0M LE 1,191.70 4,766.80
Weight Summary (MD)
Raised
Sl. No. Tower Type Weight of Stub
Chimney
- 348.59
1.00 -
2.00 -
1 MD 3.00 -
4.00 -
5.00 -
6.00 -

Description Weight Total Wt./Tower


MD
Peak, X-Arm & CAGE-I
CAGE-II
CAGE-III
X-ARM-1
X-ARM-2
X-ARM-3
X-ARM-4
X-ARM-5
X-ARM-6
BODY
G-G PLAN (BODY)
TOTAL BASIC BODY - -
-4.5M LE 1,094.62
-3.0M LE 1,386.52
-1.5M LE 1,838.68
0M LE -
+1.5M LE 2,709.08 10,836.30
+3.0M LE -
With Basic Body 3,094.79 12,379.17
PLAN H-H
With Normal Body 1,297.10 5,188.41
+4.5M LE 1,700.11 6,800.42
+6.0M LE 2,103.11 8,412.44
+7.5M LE 2,644.75 10,579.01
+9.0M LE -
220kV UDIPUR-BHARATPUR TRANSMISSION LINE PROJECT
Comparision of Guaranteed Foundation Volume and Design Foundation Volume
Annexure-1

Guaranteed Foundation Unit Rate


Guaranteed Foundation Volume Design Foundation Volume Minimum of Design & Guaranteed Difference in Unit price
in NRs
Tower Type DB +1.5, +3.0, +4.5, +6.0, +7.5 & Reduction in Unit
Sl. No. PCC PCC RCC RCC
+9.0m Leg Extension Excavation in RCC Excavation in Rebar per Excavation in PCC (M10) Price
(M10) Rebar (kg) (M10) (M20) Rebar (kg) Excabation PCC (M10) RCC (M20) (M20) Rebar (kg) Excabation PCC (M10) RCC (M20) Rebar per Kg
Soil(m³) (M20) (m³) Soil(m³) Kg Soil(m³) (m³)
(m³) (m³) (m³) (m³)
1 DRY FOUNDATION 230.85 3.85 36.86 4037.00 232.32 3.36 36.86 4047.00 480.00 11520.00 22000.00 110.00 230.85 3.36 36.86 4037.00 110808.00 38707.20 810920.00 444070.00 1,404,505.20
2 WET FOUNDATION 446.52 7.44 64.04 7082.00 446.52 6.73 64.19 7126.00 480.00 11520.00 22000.00 110.00 446.52 6.73 64.04 7082.00 214329.60 77529.60 1408880.00 779020.00 2,479,759.20
3 PARTIALLY SUBMERGED FOUNDATION 446.52 7.44 64.04 7082.00 446.52 6.73 64.19 7126.00 480.00 11520.00 22000.00 110.00 446.52 6.73 64.04 7082.00 214329.60 77529.60 1408880.00 779020.00 2,479,759.20
4 FULLY SUBMERGED FOUNDATION 538.68 8.98 75.46 8365.00 538.68 8.19 75.49 8421.00 480.00 11520.00 22000.00 110.00 538.68 8.19 75.46 8365.00 258566.40 94348.80 1660120.00 920150.00 2,933,185.20
5 WET BLACK COTTON FOUNDATION 622.08 10.37 85.80 9526.00 622.08 9.52 85.93 9542.00 480.00 11520.00 22000.00 110.00 622.08 9.52 85.80 9526.00 298598.40 109670.40 1887600.00 1047860.00 3,343,728.80
6 DRY FISSURED FOUNDATION 276.48 4.61 42.95 4715.00 235.98 4.61 43.26 4716.00 750.00 11520.00 22000.00 110.00 235.98 4.61 42.95 4715.00 176985.00 53107.20 944900.00 518650.00 1,693,642.20
7 WET FISSURED FOUNDATION 376.31 6.27 55.33 6105.00 326.27 6.23 55.58 6139.00 750.00 11520.00 22000.00 110.00 326.27 6.23 55.33 6105.00 244702.50 71769.60 1217260.00 671550.00 2,205,282.10
8 SUBMERGED FISSURED FOUNDATION 476.28 7.94 70.43 6105.00 408.46 7.69 70.55 6164.00 750.00 11520.00 22000.00 110.00 408.46 7.69 70.43 6105.00 306345.00 88588.80 1549350.00 671550.00 2,615,833.80

Guaranteed Foundation Unit Rate


Guaranteed Foundation Volume Design Foundation Volume Minimum of Design & Guaranteed Difference in Unit price
in NRs
Tower Type DC +1.5, +3.0, +4.5, +6.0, +7.5 & Reduction in Unit
Sl. No. PCC PCC RCC RCC
+9.0m Leg Extension Excavation in RCC Excavation in Rebar per Excavation in PCC (M10) Price
(M10) Rebar (kg) (M10) (M20) Rebar (kg) Excabation PCC (M10) RCC (M20) (M20) Rebar (kg) Excabation PCC (M10) RCC (M20) Rebar per Kg
Soil(m³) (M20) (m³) Soil(m³) Kg Soil(m³) (m³)
(m³) (m³) (m³) (m³)
1 DRY FOUNDATION 324.48 5.41 52.68 5723.00 324.48 4.80 52.98 5744.00 480.00 11520.00 22000.00 110.00 324.48 4.80 52.68 5723.00 155750.40 55296.00 1158960.00 629530.00 1,999,536.40
2 WET FOUNDATION 507.00 8.45 76.41 8351.00 507.00 7.69 76.55 8394.00 480.00 11520.00 22000.00 110.00 507.00 7.69 76.41 8351.00 243360.00 88588.80 1681020.00 918610.00 2,931,578.80
3 PARTIALLY SUBMERGED FOUNDATION 507.00 8.45 76.41 8351.00 507.00 7.69 76.92 8403.00 480.00 11520.00 22000.00 110.00 507.00 7.69 76.41 8351.00 243360.00 88588.80 1681020.00 918610.00 2,931,578.80
4 FULLY SUBMERGED FOUNDATION 538.68 8.98 80.53 8807.00 598.12 9.14 80.69 8818.00 480.00 11520.00 22000.00 110.00 538.68 8.98 80.53 8807.00 258566.40 103449.60 1771660.00 968770.00 3,102,446.00
5 WET BLACK COTTON FOUNDATION 657.12 10.95 95.93 10513.00 722.61 11.13 96.10 10530.00 480.00 11520.00 22000.00 110.00 657.12 10.95 95.93 10513.00 315417.60 126144.00 2110460.00 1156430.00 3,708,451.60
6 DRY FISSURED FOUNDATION 324.48 5.41 52.68 5723.00 283.95 5.47 52.76 5736.00 750.00 11520.00 22000.00 110.00 283.95 5.41 52.68 5723.00 212962.50 62323.20 1158960.00 629530.00 2,063,775.70
7 WET FISSURED FOUNDATION 324.48 5.41 52.68 5723.00 376.89 7.13 57.95 6821.00 750.00 11520.00 22000.00 110.00 324.48 5.41 52.68 5723.00 243360.00 62323.20 1158960.00 629530.00 2,094,173.20
8 SUBMERGED FISSURED FOUNDATION 324.48 5.41 52.68 5723.00 528.14 9.80 80.58 8836.00 750.00 11520.00 22000.00 110.00 324.48 5.41 52.68 5723.00 243360.00 62323.20 1158960.00 629530.00 2,094,173.20

Guaranteed Foundation Unit Rate


Guaranteed Foundation Volume Design Foundation Volume Minimum of Design & Guaranteed Difference in Unit price
in NRs
Tower Type DD +1.5, +3.0, +4.5, +6.0, +7.5 & Reduction in Unit
Sl. No. PCC PCC RCC RCC
+9.0 Leg Extension Excavation in RCC Excavation in Rebar per Excavation in PCC (M10) Price
(M10) Rebar (kg) (M10) (M20) Rebar (kg) Excabation PCC (M10) RCC (M20) (M20) Rebar (kg) Excabation PCC (M10) RCC (M20) Rebar per Kg
Soil(m³) (M20) (m³) Soil(m³) Kg Soil(m³) (m³)
(m³) (m³) (m³) (m³)
1 DRY FOUNDATION 571.32 9.52 92.53 9984.00 571.32 8.71 92.96 10032.00 480.00 11520.00 22000.00 110.00 571.32 8.71 92.53 9984.00 274233.60 100339.20 2035660.00 1098240.00 3,508,472.80
2 WET FOUNDATION 806.88 13.45 124.57 13490.00 806.88 12.48 124.87 13508.00 480.00 11520.00 22000.00 110.00 806.88 12.48 124.57 13490.00 387302.40 143769.60 2740540.00 1483900.00 4,755,512.00
3 PARTIALLY SUBMERGED FOUNDATION 806.88 13.45 124.57 13490.00 806.88 12.48 124.87 13508.00 480.00 11520.00 22000.00 110.00 806.88 12.48 124.57 13490.00 387302.40 143769.60 2740540.00 1483900.00 4,755,512.00
4 FULLY SUBMERGED FOUNDATION 806.88 13.45 124.57 13490.00 806.88 12.48 124.87 13508.00 480.00 11520.00 22000.00 110.00 806.88 12.48 124.57 13490.00 387302.40 143769.60 2740540.00 1483900.00 4,755,512.00
5 WET BLACK COTTON FOUNDATION 929.28 15.49 141.21 15311.00 929.28 14.45 141.33 15346.00 480.00 11520.00 22000.00 110.00 929.28 14.45 141.21 15311.00 446054.40 166464.00 3106620.00 1684210.00 5,403,348.40
6 DRY FISSURED FOUNDATION 554.88 9.25 90.30 9740.00 478.42 8.92 90.71 9756.00 750.00 11520.00 22000.00 110.00 478.42 8.92 90.30 9740.00 358815.00 102758.40 1986600.00 1071400.00 3,519,573.40
7 WET FISSURED FOUNDATION 604.92 10.08 97.10 10484.00 520.21 9.66 97.33 10512.00 750.00 11520.00 22000.00 110.00 520.21 9.66 97.10 10484.00 390157.50 111283.20 2136200.00 1153240.00 3,790,880.70
8 SUBMERGED FISSURED FOUNDATION 730.08 12.17 114.12 12347.00 699.34 12.80 117.25 12385.00 750.00 11520.00 22000.00 110.00 699.34 12.17 114.12 12347.00 524505.00 140198.40 2510640.00 1358170.00 4,533,513.40
BILLS OF QUANTITY FO UDIPUR - MARKCHOWK - BHARATPUR
Revised on 14.06.2021 SECTION
Quanitity as
Estimated
Item Item description Unit Quanitity as per per Tower
No. schedule dt
Tender 21.07.2021
1.1.1 Suspension Tower DA
a.1) Basic tower Nos. 21.00 -
a.2) Stub Nos. 84.00 -
b) -4.5 m Leg Extension Nos. 4.00 -
c) -3 m Leg Extension Nos. 6.00 -
d) -1.5 m Leg Extension Nos. 8.00 -
e) +/- 0 m Leg Extension Nos. 30.00 -
f) +1.5 m Leg Extension Nos. 8.00 -
g) +3 m Leg Extension Nos. 28.00 -
h) +4.5 m Leg Extension Nos. 2.00 -
i) +6 m Leg Extension Nos. 12.00 -
j) +7.5 m Leg Extension Nos. 2.00 -
k) +9 m Leg Extension Nos. 8.00 -
l) +18 m Leg Extension Nos. 3.00 -
m) +25 m Leg Extension Nos. 3.00 -

1.1.2 Tension Tower DB


a.1.1) Basic tower DB Nos. 35.00 Err:509
a.1.2) Basic tower DB (Reinforced) Nos. Err:509
a.2) Total Stubs Nos. 140.00 Err:509
a.2.1) Stub, Normal 0 m Chimney extension Nos. - Err:509
a.2.2) Stub, 1 m Chimney extension Nos. - Err:509
a.2.3) Stub, 2 m Chimney extension Nos. - Err:509
a.2.4) Stub, 3 m Chimney extension Nos. - Err:509
a.2.5) Stub, 4 m Chimney extension Nos. - Err:509
a.2.6) Stub, 5 m Chimney extension Nos. - Err:509
a.2.7) Stub, 6 m Chimney extension Nos. - Err:509
b) -4.5 m Leg Extension Nos. 4.00 Err:509
c) -3 m Leg Extension Nos. 10.00 Err:509
d) -1.5 m Leg Extension Nos. 14.00 Err:509
e) +/- 0 m Leg Extension Nos. 88.00 Err:509
f) +1.5 m Leg Extension Nos. 14.00 Err:509
g.1) +3 m Leg Extension (to Basic Body) Nos. - Err:509
g.2) +3 m Leg Extension (to Normal Tower) Nos. 10.00 Err:509
h) +4.5 m Leg Extension Nos. 8.00 Err:509
i) +6 m Leg Extension Nos. 16.00 Err:509
j) +7.5 m Leg Extension Nos. 6.00 Err:509
k) +9 m Leg Extension Nos. 18.00 Err:509

1.1.3 Tension Tower DC


a.1.1) Basic tower DC Nos. 18.00 27.00
a.1.2) Basic tower DC (Reinforced) Nos. Err:509
a.2) Total Stubs Nos. 72.00 Err:509
a.2.1) Stub, Normal 0 m Chimney extension Nos. - Err:509
a.2.2) Stub, 1 m Chimney extension Nos. - Err:509
a.2.3) Stub, 2 m Chimney extension Nos. - Err:509
a.2.4) Stub, 3 m Chimney extension Nos. - Err:509
a.2.5) Stub, 4 m Chimney extension Nos. - Err:509
a.2.6) Stub, 5 m Chimney extension Nos. - Err:509
a.2.7) Stub, 6 m Chimney extension Nos. - Err:509
b) -4.5 m Leg Extension Nos. 2.00 Err:509
c) -3 m Leg Extension Nos. 6.00 Err:509
d) -1.5 m Leg Extension Nos. 8.00 Err:509
e) +/- 0 m Leg Extension Nos. 44.00 Err:509
f) +1.5 m Leg Extension Nos. 4.00 Err:509
g.1) +3 m Leg Extension (to Basic Body) Nos. - Err:509
g.2) +3 m Leg Extension (to Normal Tower) Nos. 8.00 Err:509
h) +4.5 m Leg Extension Nos. 4.00 Err:509
i) +6 m Leg Extension Nos. 8.00 Err:509
j) +7.5 m Leg Extension Nos. 2.00 Err:509
k) +9 m Leg Extension Nos. 6.00 Err:509

1.1.4 Tension Tower DD


a.1.1) Basic tower DD Nos. 75.00 66.00
a.1.2) Basic tower DD (Reinforced) Nos. Err:509
a.2) Total Stubs Nos. 300.00 Err:509
a.2.1) Stub, Normal 0 m Chimney extension Nos. - Err:509
a.2.2) Stub, 1 m Chimney extension Nos. - Err:509
a.2.3) Stub, 2 m Chimney extension Nos. - Err:509
a.2.4) Stub, 3 m Chimney extension Nos. - Err:509
a.2.5) Stub, 4 m Chimney extension Nos. - Err:509
a.2.6) Stub, 5 m Chimney extension Nos. - Err:509
a.2.7) Stub, 6 m Chimney extension Nos. - Err:509
b) -4.5 m Leg Extension Nos. 8.00 Err:509
c) -3 m Leg Extension Nos. 14.00 Err:509
d) -1.5 m Leg Extension Nos. 30.00 Err:509
e) +/- 0 m Leg Extension Nos. 214.00 Err:509
f) +1.5 m Leg Extension Nos. 14.00 Err:509
g.1) +3 m Leg Extension (to Basic Body) Nos. - Err:509
g.2) +3 m Leg Extension (to Normal Tower) 20.00 Err:509
h) +4.5 m Leg Extension Nos. 4.00 Err:509
i) +6 m Leg Extension Nos. 20.00 Err:509
j) +7.5 m Leg Extension Nos. 4.00 Err:509
k) +9 m Leg Extension Nos. 20.00 Err:509
l) +18 m Leg Extension Nos. 72.00 Err:509
m) +25 m Leg Extension Nos. 44.00 Err:509

1.1.5 Tension Tower DDSR


a.1.2) Basic tower DDSR 11.00 Err:509
a.2) Total Stubs Nos. 44.00 Err:509
a.2.1) Stub, Normal 0 m Chimney extension Nos. - Err:509
a.2.2) Stub, 1.5m Chimney extension Nos. - Err:509
a.2.3) Stub, 3.0m Chimney extension Nos. - Err:509
a.2.4) Stub, 4.5m Chimney extension Nos. - Err:509
a.2.5) Stub, 6.0m Chimney extension Nos. - Err:509
b) -4.5 m Leg Extension Nos. - Err:509
c) -3 m Leg Extension Nos. - Err:509
d) -1.5 m Leg Extension Nos. - Err:509
e) +/- 0 m Leg Extension Nos. 44.00 Err:509
f) +1.5 m Leg Extension - Err:509
g.1) +3 m Leg Extension with Basic Tower Body Nos. - Err:509
g.2) +3 m Leg Extension with Normal Tower Body Nos. - Err:509
h) +4.5 m Leg Extension Nos. - Err:509
i) +6 m Leg Extension Nos. - Err:509
j) +7.5 m Leg Extension Nos. - Err:509
k) +9 m Leg Extension Nos. - Err:509
l) +18 m Leg Extension Nos. 22.00 Err:509
m) +25 m Leg Extension Nos. 22.00 Err:509

1.1.6 Suspension Tower MA


a.1.1) Basic tower Nos. 11.00 Err:509
a.2) Total Stubs 44.00 Err:509
a.2.1) Stub, Normal 0 m Chimney extension Nos. - Err:509
a.2.2) Stub, 1 m Chimney extension Nos. - Err:509
a.2.3) Stub, 2 m Chimney extension Nos. - Err:509
a.2.4) Stub, 3 m Chimney extension Nos. - Err:509
a.2.5) Stub, 4 m Chimney extension Nos. - Err:509
a.2.6) Stub, 5 m Chimney extension Nos. - Err:509
a.2.7) Stub, 6 m Chimney extension Nos. - Err:509
b) -4.5 m Leg Extension Nos. - Err:509
c) -3 m Leg Extension Nos. 2.00 Err:509
d) -1.5 m Leg Extension Nos. 3.00 Err:509
e) +/- 0 m Leg Extension Nos. 24.00 Err:509
f) +1.5 m Leg Extension Nos. 3.00 Err:509
g) +3 m Leg Extension (to Basic Body) Nos. 12.00 Err:509
h) +4.5 m Leg Extension Nos. - Err:509
i) +6 m Leg Extension Nos. 12.00 Err:509
j) +7.5 m Leg Extension Nos. - Err:509
k) +9 m Leg Extension Nos. 3.00 Err:509

1.1.7 Tension Tower MD


a.1.1) Basic tower Nos. 15.00 Err:509
a.2) Total Stubs 60.00 Err:509
a.2.1) Stub, Normal 0 m Chimney extension Nos. - Err:509
a.2.2) Stub, 1 m Chimney extension Nos. - Err:509
a.2.3) Stub, 2 m Chimney extension Nos. - Err:509
a.2.4) Stub, 3 m Chimney extension Nos. - Err:509
a.2.5) Stub, 4 m Chimney extension Nos. - Err:509
a.2.6) Stub, 5 m Chimney extension Nos. - Err:509
a.2.7) Stub, 6 m Chimney extension Nos. - Err:509
b) -4.5 m Leg Extension Nos. 8.00 Err:509
c) -3 m Leg Extension Nos. 8.00 Err:509
d) -1.5 m Leg Extension Nos. 32.00 Err:509
e) +/- 0 m Leg Extension Nos. 8.00 Err:509
f) +1.5 m Leg Extension Nos. 4.00 Err:509
g) +3 m Leg Extension (to Basic Body) Nos. - Err:509
h) +4.5 m Leg Extension Nos. 38.00 Err:509
i) +6 m Leg Extension Nos. - Err:509
j) +7.5 m Leg Extension Nos. 19.00 Err:509
k) +9 m Leg Extension Nos. - Err:509

2 Supply of Earthing of towers


a) Pipe Type Nos. 133.00 193.00
b) Counterpoise Type Nos. 53.00 75.00

3 Supply of following tower accessories


a) Danger Plate Nos. 186.00 193.00
b) Number Plate Nos. 186.00 193.00
c) Phase Plate ( Set of three) Sets 420.00 410.00
d) Circuit Plate(Set of two) Sets 420.00 205.00
e) Anti climbimg device Nos. 186.00 193.00
f) Bird Guard(set of three) Sets 90.00 128.00

4 Supply of following Line Materials


a) 7/3.35mm Earthwire KM 70.00 70.00

5 Conductor
a) HTLS Conductor KM 832.00 865.00
b) ACSR Bison Conductor KM 100.00 100.00

6. Insulators for 220kV line with HTLS Conductor


A. Option-1: Composite Insulators
a) 120kN Composite Long Rod Insulator Nos 678.00 804.00
b) 160kN Composite Long Rod Insulator Nos 3,684.00 4,584.00

B Option-2: Disc Insulators


a) 120kN Disc Insulator Nos 10,848.00 -
b) 160kN Disc Insulator Nos 62,628.00 -

7.1. Hardware Fittings suitable for HTLS conductor


a) Double "I" Suspension Insulator String (except clamps) Sets 186.00 84.00
b) Single 'I' Suspension PILOT String (except clamps) Sets 306.00 636.00
c) Double Tension Insulator String (except clamps) Sets 1,842.00 2,292.00

7.2. Clamps for Hardware fittings suitable for HTLS conductor


a) Suspension clamp suitable for suspension insulator strings Sets 372.00 168.00
b) Suspension clamp suitable for suspension pilot insulator strings Sets 612.00 1,272.00
c) Dead end clamp for tension insulator string Sets 3,684.00 4,584.00

9.. Insulators for 220kV ckts with Twin ACSR Bison


A. Option-1: Composite Insulators
a) 120kN Composite Long Rod Insulator Nos 168.00 -
b) 160kN Composite Long Rod Insulator Nos 360.00 -

B Option-2: Disc Insulators


a) 120kN Disc Insulator Nos 2,688.00 -
b) 160kN Disc Insulator Nos 6,120.00 -

10.. Hardware Fittings suitable for Twin Bison conductor


a) Single "I" Suspension Insulator String with necessary clamps Sets 63.00 -
b) Double Tension Insulator String with necessary clamps Sets 180.00 -
c) Single 'I' Suspension PILOT String with necessary clamps Sets 42.00 -

11.. Conductor and Earthwire Accessories


a) Mid span compression joint for HTLS conductor Nos 508.00 604.00
b) Mid span compression joint for ACSR Bison conductor Nos 61.00 -
c) Mid span compression joint for 7/3.35mm GS earthwire Nos 41.00 49.00
d) Repair Sleeve for HTLS conductor Nos 153.00 584.00
e) Repair Sleeve for ACSR Bison conductor Nos 19.00 -
f) Flexible Copper Bond for 7/3.35mm GS Earthwire Nos 376.00 390.00
g) Vibration Damper for for 7/3.35mm GS Earthwire Nos 752.00 1,276.00
h) Vibration Damper for ACSR Bison conductor Nos 932.00 -
i) Rigid Spacer for HTLS conductor Nos 2,722.00 3,254.00
j) Rigid Spacer for ACSR Bison conductor Nos 303.00 -
k) Bundle Spacer for ACSR Bison conductor Nos 945.00 -
l) Earthwire Suspension Clamp Nos 37.00 7.00
m) Earthwire Tension Clamp Nos 303.00 376.00
n) Vibration Damper for HTLS conductor Nos 8,140.00 15,812.00
o) Bundle Spacer for HTLS conductor Nos 7,236.00 8,483.00
p) Spacer damper for HTLS conductor ( as an alternative to (xiv) & (xv)) Nos
7,236.00 -
12.. Supply of Fibre Cable & Accessories

12.1.. OPGW cable & Accessories


a) 24 Fibre (DWSM) OPGW fibre optic cable. km 70.00 73.02
b) Suspension Assembly Sets 30.00 6.00
c) Dead End Assembly Sets 4.00 4.00
d) Tension Assembly (For joint Box Location) Sets 42.00 36.00
e) Pass through Assembly Sets 125.00 152.00
f) Special Fitting Assembly at suspension tower (for joint box Sets
locations) 2.00
g) Vibration Damper Sets 600.00 640.00
h) Down Lead Clamp assemblies No. 646.00 1,162.00
i) Joint Box (24 fibre) - OPGW to OPGW No. 21.00 36.00
j) Joint Box (24 fibre) - OPGW - Approach Cable No. 21.00 4.00

12.2.. FODP
a) FODP 48F : Indoor Type, rack mounted with FCPC coupling and pig No.
tails (5 mtrs each). 4.00 ?

12.3.. Fibre Optic approach cable


a) 24 Fibre (DWSM) Km. 2.00 ?
b) Installation hardware set for above 24 Fibre, Fibre Optic Approach Set
Cable 2.00 ?

13.. Mandatory Spares of OPGW Cabling


13.1.. OPGW cable & Accessories
a) 24 Fibre (DWSM) OPGW fibre optic cable Km. 4.00
b) Suspension Assembly Sets 2.00
c) Dead End Assembly Sets 2.00
d) Tension Assembly (For joint Box Location) Sets 1.00
e) Pass through Assembly Sets 6.00
f) Special Fitting Assembly at suspension tower (for joint box Sets
locations) 1.00
g) Vibration Damper Sets 30.00
h) Down Lead Clamp assemblies No. 33.00
i) Joint Box (24 fibre) No. 1.00

14.. Fibre Optic approach cable


a) 24 Fibre (DWSM) Km. 4.00
b) Installation hardware set for above 24 Fibre, Approach Fibre Optic Set
Cable 1.00

15.. Supply of following items for aviation requirements


a) Span markers Nos. 20.00 -
b) Obstruction lights (to be provided as per IS 5613) -
c) 1 Medium + 2low intensity Sets. 12.00 -
d) 1 Medium + 4low intensity Sets. 8.00 -
Remarks

DA tower not required


UM MK
SN Type SN Type
1 DFR 1 NDF
2 DFR 2 NDF
3 WS 3 DFR
4 NDF 4 DFR
5 NDF 5 NDF
6 DFR 6 NDF
7 DFR 7 NDF
8 WS 8 NDF
9 WFR 9 NDF
10 NDF 10 DFR
11 NDF 11 DFR
12 NDF 12 NDF
13 NDF 13 NDF
14 NDF 14 DFR
15 WS 15 DFR
16 DFR 16 NDF
17 FS 17 NDF
18 FS 18 DFR
19 NDF 19 NDF
20 DFR 20 NDF
21 NDF
22 NDF
23 NDF
#NAME? 24 FS
25 DFR
26 NDF
27 NDF
28 NDF
29 WS
DFR DFR
DFR DFR
DFR DFR
DFR DFR
DFR DFR
DFR DFR
FS DFR
FS DFR
NDF FS
NDF NDF
NDF NDF
NDF NDF
NDF NDF
NDF NDF
NDF NDF
NDF NDF
WFR NDF
WS NDF
WS NDF
WS NDF
NDF
NDF
NDF
NDF
110 NDF
Udipur Markichowk NDF
DFR 6 30% 33 NDF
FS 2 10% 11 NDF
NDF 8 40% 44 WS Markichowk Bharatpur
WFR 1 5% 6 DFR
WS 3 15% 16 FS
20 NDF
WS

49 193
DFR 6 8 14 29% 55.142857 55
FS 2 1 3 6% 11.816327 12
NDF 8 19 27 55% 106.34694 106
WFR 1 1 2% 3.9387755 4
WS 3 1 4 8% 15.755102 16
20 29 193

DFR FS NDF WFR WS


29% 6% 55% 2% 8% Total
DB+0M 20 6 1 11 0 2 20
DB+9M 50 14 3 28 1 4 50
DC+0M 3 1 0 2 0 0 3
DC+9M 22 6 1 12 0 2 21
DD+0M 15 4 1 8 0 1 14
DD+9M 45 13 3 25 1 4 46
DD+18M 6 2 0 3 0 0 5
DDSR+0M 3 1 0 2 0 0 3
DDSR+9M 16 5 1 9 0 1 16
DDSR+18M 1 0 0 1 0 0 1
MA-3M 3 1 0 2 0 0 3
MA+4.5M 4 1 0 2 0 0 3
MD+0M 1 0 0 1 0 0 1
MD+9M 4 1 0 2 0 0 3
193 189
DB-3M 1 1
DB+0M 2 2
DB+0M 3 3
DB+0M 4 4
DB+0M 5 5
DB+0M 6 6
DB+0M 7 7
DB+0M 8 8
DB+0M 9 9
DB+0M 10 10
DB+0M 11 11
DB+0M 12 12
DB+0M 13 13
DB+0M 14 14 14
DB+3M 1 15
DB+3M 2 16
DB+3M 3 17
DB+3M 4 18
DB+3M 5 19
DB+3M 6 20
DB+3M 7 21
DB+3M 8 22
DB+3M 9 23
DB+3M 10 24
DB+4.5M 11 25
DB+4.5M 12 26
DB+4.5M 13 27
DB+6M 14 28
83 DB+6M 15 29
DB+6M 16 30
Markichowk Bharatpur DB+6M 17 31
8 28% 22.896552 23 DB+6M 18 32
1 3% 2.862069 3 DB+6M 19 33
19 66% 54.37931 54 DB+6M 20 34
1 3% 2.862069 3 DB+6M 21 35
29 100% 83 83 DB+6M 22 36
DB+6M 23 37
DB+6M 24 38
DB+0M 14 6 20 DB+6M 25 39
DB+9M 39 11 50 DB+6M 26 40
DC+0M 2 1 3 DB+7.5M 27 41
DC+9M 10 12 22 DB+9M 28 42
DD+0M 13 2 15 DB+9M 29 43
DD+9M 26 19 45 DB+9M 30 44
DD+18M 3 3 6 DB+9M 31 45
DDSR+0M 3 3 DB+9M 32 46
DDSR+9M 16 16 DB+9M 33 47
DDSR+18M 1 1 DB+9M 34 48
MA-3M 3 3 DB+9M 35 49
MA+4.5M 4 4 DB+9M 36 50
MD+0M 1 1 DB+9M 37 51
MD+9M 4 4 DB+9M 38 52
193 DB+9M 39 39 53
DBR-3M 1 54
DBR+0M 2 55
DBR+0M 3 56
DDR+25M 3 DBR+0M 4 57
DBR+0M 5 58
DBR+0M 6 6 59
DBR+3M 1 60
DBR+4.5M 2 61
DBR+4.5M 3 62
DBR+4.5M 4 63
DBR+6M 5 64
DBR+6M 6 65
DBR+6M 7 66
DBR+6M 8 67
DBR+6M 9 68
DBR+6M 10 69
DBR+9M 11 11 70
DC+0M 1 71
DC+0M 2 2 72
DC+6M 1 73
DC+6M 2 74
DC+6M 3 75
DC+6M 4 76
DC+7.5M 5 77
DC+7.5M 6 78
DC+7.5M 7 79
DC+9M 8 80
DC+9M 9 81
DC+9M 10 10 82
DCR+0M 1 1 83
DCR+3M 1 84
DCR+3M 2 85
DCR+3M 3 86
DCR+3M 4 87
DCR+4.5M 5 88
DCR+4.5M 6 89
DCR+4.5M 7 90
DCR+6M 8 91
DCR+6M 9 92
DCR+6M 10 93
DCR+6M 11 94
DCR+6M 12 12 95
DD+0M 1 96
DD+0M 2 97
DD+0M 3 98
DD+0M 4 99
DD+0M 5 100
DD+0M 6 101
DD+0M 7 102
DD+0M 8 103
DD+0M 9 104
DD+0M 10 105
DD+0M 11 106
DD+0M 12 107
DD+0M 13 13 108
DD+18M 1 109
DD+18M 2 110
DD+18M 3 111
DD+25M 4 112
DD+3M 5 113
DD+3M 6 114
DD+3M 7 115
DD+3M 8 116
DD+3M 9 117
DD+4.5M 10 118
DD+4.5M 11 119
DD+4.5M 12 120
DD+4.5M 13 121
DD+4.5M 14 122
DD+4.5M 15 123
DD+4.5M 16 124
DD+4.5M 17 125
DD+4.5M 18 126
DD+6M 19 127
DD+6M 20 128
DD+6M 21 129
DD+6M 22 130
DD+6M 23 131
DD+6M 24 132
DD+9M 25 133
DD+9M 26 134
DD+9M 27 135
DD+9M 28 136
DD+9M 29 29 137
DDR+0M 1 138
DDR+0M 2 2 139
DDR+18M 1 140
DDR+18M 2 141
DDR+25M 3 142
DDR+3M 4 143
DDR+3M 5 144
DDR+3M 6 145
DDR+4.5M 7 146
DDR+4.5M 8 147
DDR+4.5M 9 148
DDR+4.5M 10 149
DDR+4.5M 11 150
DDR+4.5M 12 151
DDR+4.5M 13 152
DDR+4.5M 14 153
DDR+4.5M 15 154
DDR+4.5M 16 155
DDR+6M 17 156
DDR+6M 18 157
DDR+6M 19 158
DDR+6M 20 159
DDR+6M 21 160
DDR+9M 22 22 161
DDSR-1.5M 1 162
DDSR-3M 2 163
DDSR+0M 3 3 164
DDSR+18M 1 165
DDSR+3M 2 166
DDSR+3M 3 167
DDSR+3M 4 168
DDSR+4.5M 5 169
DDSR+4.5M 6 170
DDSR+4.5M 7 171
DDSR+4.5M 8 172
DDSR+4.5M 9 173
DDSR+4.5M 10 174
DDSR+4.5M 11 175
DDSR+6M 12 176
DDSR+6M 13 177
DDSR+7.5M 14 178
DDSR+9M 15 179
DDSR+9M 16 180
DDSR+9M 17 17 181
MA+0M 1 182
MA+1.5M 2 183
MA-3M 3 3 184
MA+3M 1 185
MA+3M 2 186
MA+3M 3 187
MA+4.5M 4 4 188
MD+0M 1 1 189
MD+3M 1 190
MD+4.5M 2 191
MD+9M 3 192
MD+9M 4 4 193
193
53

59

70

72

82
83
95

108
137

139

161

164
181

184

188
189

193

You might also like