Date: 01-05-2022

CONCRETE POURING SCHEDULE


Quantity
QC Construction
(m3)
Grade Number of Inspection Type of
S/N Location Time Remarks
(Mpa) Plan Local Korean Local Korean PumpCar Status Cement

PLAN

Reclaimer-2
Ashraful Inspection
1 5th Span 25 72 8:00 AM KB Choi Ariful YI Choi 1 CEM-II New Agg.
(01739658515) Done
FDN Conc.

Stacker-4
Ashraful Inspection
2 2nd Span 25 110 8:00 AM KB Choi Ariful YI Choi 1 CEM-II New Agg.
(01739658515) Done
FDN Conc.

Power House-1
STB Wall Remaining Rakib Inspection
3 25 13 8:00 AM TB Kim Mehedi CS Jung 1 CEM-I Old Agg.
Portion (01718200280) Today
(GL 4~5,A)

Elec.Manhole
Jaber Inspection
4 EMH-Z02 & Z04 12 1 9:00 AM KB Choi Solaiman YC Chang 1 CEM-II New Agg.
(01811840061) Done
Lean

Clarifier in Ash Water


Halim Inspection
5 Recovery Area 30 120 9:30 AM KB Choi Solaiman YC Chang 1 CEM-II New Agg.
(01889210340) Done
FDN Conc.

Reclaimer-2
Ashraful Inspection
6 6th Span 25 72 10:30 AM KB Choi Ariful YI Choi 1 CEM-II New Agg.
(01739658515) Done
FDN Conc.

ID Fan B Unit-2 Old Agg. -> New


Halim Inspection
7 3rd Layer FDN 25 250 10:30 AM KB Choi Solaiman YC Chang 1 CEM-I Agg.
(01889210340) Done
Conc.

Stacker-2
Ashraful Inspection
8 Span -6 25 40 11:00 AM KB Choi Ariful YI Choi 1 CEM-II New Agg.
(01739658515) Done
Pedestal

Pipe Rack-1 (P08~P10) Halim Inspection


9 12 0.5 3:00 PM KB Choi Alamgir CM Park 1 CEM-II New Agg.
Lean (01889210340) Done

Pipe Rack-1 (P08~P10) Halim Inspection


10 21 0.5 3:00 PM KB Choi Alamgir CM Park 1 CEM-II New Agg.
Pile Plug (01889210340) Done

Pipe Sleeper Trench


Halim Inspection
11 TR-13 12 5 3:00 PM KB Choi Solaiman CM Park 1 CEM-II New Agg.
(01889210340) Done
Lean

Condensate Polishing shahin Inspection


12 12 6 3:00 PM KB Choi Alamgir CM Park 1 CEM-II New Agg.
System Lean (01722706463) Today

Total 690
*This Schedule can be delayed and changed based on inspection status and Pump Car status .