Set up Frac string pumping lines:
a) Set up PRV on main Frac line on upstream side (High pressure pump side) of main check valve. Wheel
2 b) Ensure there is a "kick" between main line and PRV trailer. valve
c) Ensure the PRV trailer is spotted within 150 ft. of the TechCommand® center (TCC)
CV
To wellhead
REVIEW/REVISION DATE:
Printed version of this document is uncontrolled 1 15.OCT.2019
Halliburton Hydraulic PrV Trailer Work Method WM-GL-HAL-PE-412
3b
Unit Preparation:
3 a) Ensure hatch is open on tank
b) If connecting to an external tank ensure drain valves are open to supporting tank
5a
Prime Up:
a) Set the Relief Valve Back Pressure control to OFF position
5c
5 b) Set the manual isolation valve to fully open
c) Set the hydraulically-controlled isolation valve to OPEN
d) Pump fluid through the high pressure manifold until it is clearly flowing in the tank
REVIEW/REVISION DATE:
Printed version of this document is uncontrolled 2 15.OCT.2019
Halliburton Hydraulic PrV Trailer Work Method WM-GL-HAL-PE-412
e) Set the hydraulically-controlled isolation valve to OPEN by holding the switch in the OPEN position until
the green OPEN light turns on
f) Bleed off Pressure
REVIEW/REVISION DATE:
Printed version of this document is uncontrolled 3 15.OCT.2019
Halliburton Hydraulic PrV Trailer Work Method WM-GL-HAL-PE-412
PRV Activation:
a) Typically a PRV activation is a stage ending event
9 b) To reset PRV, lower hydraulic pressure by turning the pressure adjustment knob counter clock wise, this will
reduce pressure prior to activating reset button and prevent damage to internal components
Contingency plan should customer increase pressure requirements during Frac job:
10 PRV MUST be set to 500 psi higher than anticipated kick out pressure BEFORE kick outs are set! Pressure-Relief Valve Trailer Operation and Maintenance Manual
REVIEW/REVISION DATE:
Printed version of this document is uncontrolled 4 15.OCT.2019
Halliburton Hydraulic PRV Trailer Work Method WM-GL-HAL-PE-412
NOTES:
Review/Revision
DATE Summary of Revisions
No
01.OCT.2019 6 Annual review; no revisions/updates
26.JUL.2017 5 Annual review; no revisions/updates
APR.2015 4 Complete revision to document
Revisions highlighted in BLUE to; Quality/Critical Checks, Work
MAY.2013 3
Instructions/Sequence, Prime Up, Visual Instructions
MAR.2013 2 Annual review; no revisions/updates
JAN.2012 1 Original release
REVIEW/REVISION DATE:
5 14.APR.2015