Professional Documents
Culture Documents
Input
Vu = 711.80 kN
Combination = LRFHD 531EH
Joint Number = 2328
f'c = 30 MPa
E = 25742.96 MPa
Slab Thickness = 1500 mm
Rebar Diameter = 29 mm
Concrete Cover = 140 mm
Pile Diameter = 600 mm
Pile Spacing = 1500 mm
Pile Edge Distance = 750 mm
fc = 0.75
d = 1345.50 mm
bw = 3000 mm
When no transverse reinft.
Vc = 2763.60262921 kN
Vu < Vc OK!
Water Height = 8.64 m
Concrete Height = 1.5 m
711.80209
One Way Shear Calculation
Input
Vu = 3045.81 kN
f'c = 30 MPa
E = 25742.96 MPa
Slab Thickness = 1500 mm
Rebar Diameter = 29 mm
Concrete Cover = 140 mm
Pile Diameter = 600 mm
Pile Spacing = 1500 mm
Pile Edge Distance = 750 mm
fc = 0.75
d = 1345.50 mm
bw = 5626 mm
When no transverse reinft.
Vc = 5182.67613065 kN
Vu < Vc OK!
Water Height = 8.64 m
Concrete Height = 1.5 m
3045.8128
One Way Shear Calculation
Input
Vu = 53.44 kN
f'c = 25 MPa
E = 23500.00 MPa
Slab Thickness = 550 mm
Rebar Diameter = 19 mm
Concrete Cover = 140 mm
Column Size = 400 mm
Pile Spacing = 1000 mm
Pile Edge Distance = 500 mm
fc = 0.75
d = 400.50 mm
bw = 1000 mm
When no transverse reinft.
Vc = 250.3125 kN
Vu < Vc OK!
Water Height = 8.64 m
Concrete Height = 1.5 m
2980.4742