PRE - COMMISSIONING CHECKLIST
Date
Ready Ready
1. HVAC Units & Build-Up Units Date
Yes No Yes No
b. FILTERS e. FANS
Above checklists are to be verified by the installing contractor for verifying system readiness for Testing and Balancing.
PUNCHLIST FORM
1st Philippine Industrial Park (Sto tomas, Equipment:
Site:
Batangas) System ID:
Location:
Project: TE Connectivity
Date:
Item Category Raised by On Cleared
Punchlist Details
No. A B Name Date Date
Category A, Major Punchlist items must be resolved prior to testing & commissioning activities commencing.
Category B, Minor Punchlist not impacting on commissioning, Must be resolved for final Handover.
Punchlist Raised
by:
Signature Date
PL Cleared By:
Signature Date
Verified By:
Signature Date
REMARKS:
EQUIPMENT
PERFORMANCE
TESTING
AIR HANDLING UNIT TEST DATA
Submitted Actual Test
Description Remarks
data Data
Unit Designation AHU 1
Quantity 2
Location 2F Utility Area
Manufacturer
Model Number
Horizontal
Model Type Draw Thru
Area Served Auto Assy
Total Heat (TR) 85 TR
Sensible Heat (TR)
Max Face Velocity
(FPM) 500 FPM
Entering Air
Temperature (DB)
Entering Air
Temperature (WB)
Leaving Air
Temperature (DB)
Leaving Air
Temperature (WB)
Supply Air Flow (CFM) 7514 CFM
Free Air Flow (CFM) 7514 LPS
Total Static Pressure
(Pa) 622 Pa
Water Flow (GPM) 12.87 LPS
Mid Filter 35%
Final Filter 85%
Power 20HP
Voltage 460V
clinic toilet
Janitor &
toilet
Tooling
Production
Level 1
Office
Level 2
Office
To be completed by test and air balance
To be completed by design engineer technician
Design CFM VAV Min/Max Actual CFM VAV min/max Percent of Design
Actual #
Pressure
Space air
Location Supply Return Exhaust Relationship Supply Return Exhaust Supply Return Exhaust
Volume changes
+0-
per hour
Inspection
Office
Documents
room
Server
Room
Cafeteria /
Food Prep
Training
room
Alkaline
Storage /
Acid
Storage &
Mezzanine
HUB room
Main Lobby
Facilities
Office
BMS room
Pressurization
0 = Equal: Within +/- 10% of design CFM supply and return/exhaust.
+ = Positive: Exceeds 10% or 50 CFM (which is greater) supply CFM over return/exhaust CFM.
- = Negative: Exceeds 10% or 50 CFM (which is greater) return/exhaust CFM over supply CFM.
Actual Values listed that are more than 10% departure from design values without clarification will not be accepted.
Remarks: