PEMBINAAN MITRAJAYA

PMJ/MTS/CON/PTW
SDN BHD

Construction
Method Statements Painting Works Page : 1/2
Manual

1.0 OBJECTIVE

To outline method statement by which painting work is carried out.

2.0 SCOPE

This method statement shall apply for all painting works on building and civil
engineering projects.

3.0 REFERENCES

ISO 9001 Clause 7.1.3, 8.1 and 8.5


Process Reference P4.0
Receiving Inspection and Testing - PMJ/PRO/CON/03
Inspection and Test Plan - PMJ/ITP
Painting Works Inspection Checklist - PMJ/PWIC
Project Filing Index - PMJ/PFI
Receiving Inspection Checklist - PMJ/RIC
Request for Inspection Form - PMJ/RFI
Construction Drawings
Project Specifications

4.0 DEFINITIONS

NIL

5.0 RESPONSIBILITY

Project/Site Engineer
Site Supervisor

6.0 MATERIALS

Paint as per specifications

7.0 HANDLING AND STORAGE OF MATERIALS

Handling: NIL

Storage: In sealed containers in a docked-up store.

8.0 PLANT, MACHINERY AND EQUIPMENT

NIL

Revision : 01 Effective Date : 02-01-2020


PEMBINAAN MITRAJAYA
PMJ/MTS/CON/PTW
SDN BHD

Construction
Method Statements Painting Works Page : 2/2
Manual

9.0 PREPARATORY WORKS

9.1 Obtain approved PTW from the client/client’s representative.

9.2 Ensure surface to be painted are clean.

9.3 Protect appropriate fittings and other surfaces using plastic canvas or
equivalent material. Barricade the working radius and posted appropriate
signages. Provide secondary container for storage purpose. Standby
person shall be monitor and ensure all precaution measure has been
done prior to start work.

9.4 Before applying coatings, ensure moisture content of substrate will not
adversely affect the completed work.

9.5 Check for surface irregularities.

9.6 Ensure provision of artificial lighting.

9.7 Submit Request for Inspection Form before proceeding with the work.

9.8 Carry out receiving inspection of necessary materials as per Receiving


Inspection and Testing Procedure.

9.9 File completed Receiving Inspection Checklist as per Project Filing Index.

10.0 WORK METHODOLOGY

10.1 Mix paint well by stirring. If thinner is required ensure approval by


client/client’s representative.

10.2 Apply all painting materials as per Client’s instructions. The paint can be
applied by brushing and roller painting.

10.3 If primer is required, work primer well into surface, joints, angles and, on
timber, into end grain.

10.4 Apply undercoats and finishing coats evenly to give a continuous film,
free from runs, brush marks and other imperfections. Allow each coat to
dry before succeeding coat is applied.

10.5 Submit Request for Inspection Form for joint inspection with client/client’s
representative.

10.6 On completion of joint inspection, request client/client’s representative to


sign on the Painting Works Inspection Checklist and file as per Project
Filing Index.

10.7 Carry out computation and submit for claim.

Revision : 01 Effective Date : 02-01-2020