TTMN12H – MITIGATING MEASURES

SECTION – H430
MITIGATING MEASURES
GROUP NUMBER 9

GROUP MEMBERS 1. Melissa Fernandez

2. Joseph Lawrence Moreno

3. Edward James P. Maun

REGION IX
PROVINCE Zamboanga Del Norte

IDENTIFIED RISK CONTINGENCY PLAN ACTION PLAN

1. Hydro Meteorological Implementation of an Establishing Concrete plan of


Hazards Emergency Notification Evacuation Procedures.
System. Once effectively Evacuation maps should be
established emergency distributed with citizen utility
response protocols, a mass bills and posted on your local
communication system is government's website so that
needed to notify citizens when residents are informed of all
disaster has occurred. ENS major and alternate
should have systems that evacuation routes leading out
makes use of FEMA's of their neighborhood.
Integrated Public Alert and
Warning System (IPAWS) to
extend messaging to travelers
and individuals who have not
yet signed up for emergency
notifications.

2. Climate Change Risk By Promoting The Local Include a community-wide


Government Operations inventory of greenhouse gas
Protocol for Greenhouse Gas emissions, an emissions
Assessments explains how to target, and a set of activities
inventory GHG emissions from and targets that the

Date:
TTMN12H – MITIGATING MEASURES

SECTION – H430
government buildings and community proposes to
facilities, government fleet reduce emissions. Climate
vehicles, wastewater and change threats, such as flood
potable water treatment risks from rising water levels,
plants, landfills, and other effects on water quality and
operations. availability, and the quantity
and severity of wildfires, may
also be assessed, as well as
steps the town and its citizens
might take to manage the
dangers.

3. Construction Risk To apply proper To have a design and updating


Documentation and Standard of building regulations that is
form contracts. Contracts and driven by assessing the
other necessary bidding possible risk projected over
documents for infrastructure the life of a building, bridge,
projects differ depending on or key facility.
the type of project, however
implementing agencies can use
NEDA and the PPP Center's
sample contracts (an agency
attached to NEDA). Parties,
project, modality, term,
contributions, risks,
governance, approvals, roles,
and modifications are all
common components in PPP
contracts, for example.
Financial closure, regulatory
approvals, permits and
clearances, right-of-way
clauses, and insurance are all
common post-award
obligations.

4. Inflation Risk Improving pf Domestic Mandating of Price controls,


Production and providing the these are government-
needed support from local imposed price ceilings or
producers and farmers. If floors that apply to specified

Date:
TTMN12H – MITIGATING MEASURES

SECTION – H430
necessary, augmentation of items. Wage restrictions can
supply with importation to be used in conjunction with
keep prices stable and to be price controls to reduce wage
able to guarantee food security inflation.
– This balancing act will help
better manage the impact of
inflation for both the people
and the economy.

5. Geologic Risk Construct a Local Disaster Risk Develop cost effective


Reduction and Management measures to mitigate the
Plan (LDRRMP) with disaster effects of earthquakes on
preparedness, response, people, the built
prevention and mitigation, and environment, and society as a
rehabilitation and recovery whole. Advanced reference
themes linked with the materials suitable for use by
NDRRMP NDRRMCs and building code developers;
LDRRMCs should also work support for hazard mitigation
closely together, and RA 10121 ordinances, programs, and
defined the responsibilities' incentives; and early warning
jurisdiction. If two or more of major earthquake activity
regions are affected, the lead will be among the products.
agency will be the NDRRMC, These goods will be evaluated
regional DRRMC if two or more for their application as well as
provinces are affected, their acceptability by
provincial DRRMC if two or professional organizations.
more cities and/or
municipalities are affected,
city/municipal if two or more
barangays are affected, and
barangay development council
if only one barangay is
affected.
*Note: Numbers 1-3 obtain Yes from the Risk Assessment while numbers 4 and 5 got No.

REMINDERS:
Please note, all entries in the IDENTIFIED RISKS should be in narrative form. You need to
explain it briefly and CITE THE BASIS for such an assessment.
2 the locality, firsthand information may be
If you have a groupmate who is a native of
included in the IDENTIFIED RISKS, but the person whom you are quoting as a resource
Date:person should, ideally, be named.
TTMN12H – MITIGATING MEASURES

SECTION – H430

References:

https://www.pna.gov.ph/articles/1146146

https://thelawreviews.co.uk/title/the-projects-and-construction-review/philippines

https://www.civicplus.com/blog/ps/local-government-community-emergency-preparedness

https://www.nehrp.gov/pdf/strategic_plan_2008.pdf

Date:

You might also like