You are on page 1of 16

A.

UNIT WEIGHT
I. GENERAL DATA
kN
γ concrete   :=23.6 3
m

1 Concrete,
kN
γ glass   :=25.10
m3
2 Glass,
3 Cladding,
kN kN
γ cladding   :=12 γ
3 marble  
:=24.5 3
m m
4 Marble,
kN
γ steel   :=77 3
m
5 Steel,

1. B. ASSUMED DIMENSIONS
1 SLAB
Perimeter, P :=252.4 m

Thickness, t s :=300 mm

2 BEAMS (Wide-Flange Section)


2
 2nd Floor     W36x527   A 2 nd :=99355 mm d 2 nd :=995.90 mm
2
 3rd Floor     W36x527   A 3   rd   :=99355 mm d 3  rd   :=995.90 mm
2
  4th Floor     W36x485   A 4   th   :=91613 mm d 4   th   :=984.0 mm
2
 5th Floor     W36x485   A5  th   :=91613 mm d 5   th   :=984.0 mm
  Roof     W36X485   A roof   :=91613 mm2 d roof   :=984.0 mm

3 COLUMNS (Wide-Flange Section)


a. cross sectional dimension
2
A1 :=99355 mm Ist Storey
W36 527
2
A2 :=99355 mm 2nd Storey
W36x527
2
A2 :=99355 mm
4 Thickness

5 Major Dimensions

6 Elevators

metal frame
cement finish
access floor system
assembly areas/exits
floor area/storage
Pmf   :=0.38 kPa
P cf :=1.53 kPa
Pafs   :=2.4 kPa
P aa :=4.8 kPa
Pfa   :=1.9 kPa

2. WEIGHT COMPUTATION PER


FLOOR:
LEVEL 5-includes all the live load and dead load of the roof deck and upper half of the 5
Storey.

1 Slab/Stairs
W ss   := A1 ⋅t s ⋅ γ concrete  W SS=27548.28 ⋅ kN

2 Parapet Wall

W pw :=[ (P) ⋅hr ⋅ t w ] ⋅ γ   concrete  


W pw =1340.244 ⋅kN

3 Transverse Beams
N tb5   :=7 C   No. of transverse beams  
W tb5   :=( A roof   ⋅W ) ⋅ γ steel   ⋅ N tb5  
W tb5  =26467.362 ⋅kN

4 Longitudinal Beams
N Lb5 :=63   No. of longitudinal beams  
W Lb 5 :=( A roof   ⋅ L ) ⋅ γ steel   ⋅ N Lb 5
W Lb5=32264.505 ⋅kN

5 Upper Half of the 5th Storey Columns


N C 5=86   No. of column s  

[
W C 5 := A 5 ⋅ ( h2 −d )] ⋅ γ
5
roof  steel   ⋅ N C5

W C 5=373.703 ⋅ kN

6 Upper Half of the 5 th Storey Walls


LW :=1200 m   Total Length of Walls  
h5
W w 5 :=LW ⋅t W ⋅ ⋅γ   concrete  
2
W w 5=5664.000⋅ kN

7 Elevators
w e5   :=w et  
w e5   =18.683 ⋅ kN

8 Glass
h gu 5 :=600 mm   height of glass included in the upper half of  
  total length of the glass in the   5   th Storey  
¿ ¿
9 Floor Finish at the Roof Deck
W ff 5 := At ⋅ PCf
W ff 5=5953.230⋅ kN

10 Cladding

[
W Cl 5 := (P) ⋅ hr + (
h5
2 ) ]
⋅ t Cl ⋅ γ cladding  

W Cl5=154.469 ⋅kN

11 Mechanical Duct
W md 5 :=( At ) ⋅P md
W md 5=778.2⋅ kN

12 Fiberboard
Pfb 5 :=P   Perimeter of the Fiberboard  

[ ( )]
W fb5 := Pfb 5 ⋅ hr +
h5
2
⋅ P fb

W fb5 =2.574 ⋅kN

13 Metal Frame
Pmf5   :=P   Perimeter of the Metal Frame  

[ (
W mf 5 := Pmf ⁡5 ⋅ h r +
h5
2 )]
⋅ Pmf

W mf ⁡5=326.101 ⋅kN

14 Live Loads
W fa5   :=A t ⋅ Pfa  
W fa5   =7392.900 ⋅ kN

W W 5 L=5664.000 ⋅kN

6 Elevators
W e4   :=W et  
W e4   =18.683 ⋅ kN

3. Gloss
a. lower half of the 5 th Storey

h gL5 :=700 mm height of glass included in the lower half of the

Lg 5 =80 m total length of the glass in the 5 th Storey


⋅ ⋅ ⋅γ
W g 5 L :=g ⋅h gL ⋅ L g glass

W g 5 L =14.056⋅ kN

b. upper half of the 4th Storey

hgu4   :=700 mm height of glass included in the upper half of the

Lg 4 :=80 m total length of the glass in the 4 th Storey

W g 4 U :=t g ⋅h gu 4 ⋅ Lg 4 ⋅ γ glass

W g 4 U =14.056 ⋅ kN

8 Flocr Finish at the Roof Deck


W ff 4 :=W ff 5
W ff 4=5953.230 ⋅ kN

9 Cladding
[
W cl := (P) ⋅ ( h2 + h2 )⋅ t ] ⋅ γ
4 5
cl cladding  

W Cl 4=145.382 ⋅kN

10 Mechanical Duct
W md4   :=W md5  
W md 4=778.2 ⋅ kN

11 Fiberboard
Pfb 4 :=P   Perimeter of the Fiberboard  

[ ( )]
W fb 4 := Pfb 4 ⋅
h 4 h5
2 2
+ ⋅ P fb
3
W fb 4=2.423 ×10 N

15 Marbles
W m 5 :=A t ⋅t m ⋅ γ marble  
W m 5 =953.295 ⋅ kN

Total Load
7
W ss + W pw + W fb 5+ W Lb5+ W C 5=8.799 ×10 N
7
W w 5+ W e5 +W g 5 +W ff 5 +W Cl5=1.18 ×10 N
W md 5 +W fb 5 +W mf 5 +W fa 5+W m 5=9.453 ×10 6 N
7 7 6
W 5 :=8.799 ×10 N +1.18 × 10 N +9.453 ×10 N
8
W 5=1.092× 10 N

LEVEL 4-includes all the live load and dead load of the lower half of the 5 th Storey and
upper half of the 4 th Storey

4. Slab/Stairs
W ss =27548.28⋅ kN

2 Transverse Beams
N tb4   :=7 C   No. of transverse beams  
W tb4   :=( A 5   th   ⋅ W ) ⋅ γ steel   ⋅ N tb4  
W tb4   =26467.362⋅kN

3 Longitudinal Beams
N Lb4   :=63   No. of longitudinal beams  
W Lb4   :=( A 5   th   ⋅ L ) ⋅ γ steel   ⋅ N Lb4
W Lb4   =32264.505 ⋅kN

4 Lower Half of the 5 th Storey Columns


N C 5=86   No. of columns  

[
W C 5 L := A 5 ⋅ ( h2 −d )] ⋅ γ
5
5   th   '
steel   N C 5

W C 5 L=373.703⋅ kN

5 Lower Half of the 5 th Storey Walls


3
LW =1.2×10 m   Total Length of Walls  
h
W w5 L := Lw ⋅t W ⋅ 5 ⋅γ concrete  
2

12 Metal Frame
Pmf 4 :=P  Perimeter of the Metal Frame  

[ ( )]
W mf 4 := Pmf 4 ⋅
h4 h5
+
2 2
⋅ P mf

W mf 4=306.918 ⋅kN

13 Live Loads
W fa4   :=W fa5  
W fa4   =7392.900 ⋅ kN

14 Marbles
wm 4 :=W m 5
w m 4 =953.295 ⋅kN

15 Access Floor System


W afs   4 := A t ⋅P afs 
W afs   4=9338.400⋅ kN

16 Upper Half of 4 th Storey Columns


N C 4=86   No. of columns  

[ (
W C 4 U := A 4 ⋅
h4
2 )]
−d 5   th   ⋅ γ steel   ⋅ N C 4

W C 4 U =373.703 ⋅kN

17 Upper Half of the 4th Storey Walls


3
LW =1.2×10   mTotal Length of W alls  
h4
W W 4 U :=LW ⋅t W ⋅ ⋅ γ concrete  
2
W W 4 U =5664.000⋅ kN

18 Total Weight
W 4 :=W SS +W fb 4 +W Lb 4=8.628 × 107 N
7
W mf 4 +W fa 4 +W mL + W C 4 U +W W 4 U =1.469 ×10 N
7
W Cl 4 + W md 4 + W fb 4 +W ffs4 =1.026 ×10 N
7
W C 5 L +W W 5 L +W e4 +W g 5 L +W g 4 U +W ff 4=1.204 × 10 N

8 Floor Finish at the Roof Deck


W ff 3 :=W ff 4
w ff 3=5953.230 ⋅ kN

9 Cladding

[ ( ) ]
W Cl 3 := ( P)⋅
h3 h4
+
2 2
⋅t cl ⋅γ   cladding  

W Cl3=145.382 ⋅ kN

10 Mechanical Duct
W md 3 :=W md 4
W md 3=778.2 ⋅ kN

11 Fiberboard
P fb3 :=P

[ ( )]
W fb3 := Pfb 3 ⋅
h3 h 4
+
2 2
⋅ Pfb

W fb 3=2.423 ×103 N

12 Mefal Frame
Pmf 3 :=P   Perimeter of the Metal Frame  

[ ( )]
W mf 3 := P mf 3 ⋅
h3 h 4
+
2 2
⋅ Pmf

W mf 3=306.918 ⋅kN
L
W g 4 L :=g g ⋅ h gL L g 4 ⋅ γ   glass  
W g 4 L=18.072 ⋅kN
  b. upper half of the 3rd Storey  
h gu3 :=700 mm   height of glass included in the upper half of the  
Lg 3 :=80 m   total length o f the glass in the 3rd Storey  

W g 3 U :=t ⋅h gu3 ⋅ g  3 ⋅ γ  glass  
w g 3 U =14.056 ⋅ kN
7 7 7 7
W 4 v =8.628 ×10 N + 1.469× 10 N +1.026 ×10 N +1.204 × 10 N
8
W 4=1.233 ×10 N

LEVEL 3-includes all the live load and dead load of the lower half of the 4th Storey and
upper half of the 3rd Storey

1 Slab/Stairs
W SS=27548.28 ⋅ kN

2 Transverse Beams
N tb3   :=7 C   No. of transverse beams  
W tb3 := ( A 4 th ⋅ W ) ⋅γ stee ⋅ N tb3  
W tb 3=26467.362⋅ kN

3 Longitudinal Beams
N Lb3   :=63   No. of longitudinal beams  
W Lb3   :=( A 4 t h ⋅ L ) ⋅ γ steel   ⋅ N Lb3  
W Lb3   =32264.505 ⋅kN

4 Lower Half of the 4th Storey Columns


N C 4=86   No. of columns  

[ (
W C 4 L := A 4 ⋅
h4
2 )]
−d 4   th   ⋅ γ steel   −N C 4

W C 4 L =373.703⋅ kN

5 Lower Half of the 4th Storey Walls


LW =1.2×10 3 m   Total Length of Walls  
h4
W W 4 L := LW ⋅t W ⋅ ⋅ γ concrete  
2
W W 4 L =5664.000 ⋅kN

6 Elevators
w e3 :=wet  
w e3 =18.683⋅ kN

7 Glass
a. lower half of the 4 th Storey

h gL4 :=900 mm   height of glass included in the lower half of the  


Lg 4 =80 m 4   th Storey  
¿ ¿
W fa 3 :=W fa 4
W fa 3=7392.900 ⋅kN

14 Marbles
W m 3 :=W m 4
W m 3 =953.295 ⋅kN

15 Access Floor System


W afs  3 :=A +¿⋅ P afs   ¿ W afs  3=9338 ⋅400 ⋅ kN

16 Upper Half of 3rd Storey Columns


N C 3=86   No. of columns  

[ (
W C 3 U := A 3 ⋅
h3
2 )]
−d 4   th   ⋅ γ steel   ⋅ N C 3

W C 3 U =373.703 ⋅kN

17 Upper Half of the 3rd Storey Walls


3
LW =1.2×10   mTotal Length of Walls  
h
W W 3 U :=LW ⋅t W ⋅ 3 ⋅ γ concrete  
2
W W 3 U =5664.000 ⋅kN

18 Total Weight
W 3 :=W sS +W fb 3+W Lb 3+W C 4 L=8.665× 107 N
7
W fa3 +W m 3 +W C3 U +W W 3 U =1.438 ×10 N
7
W Cl 3+ W md 3 +W fb3 +W afs3 +W mf 3 =1.057× 10 N
7
W W 4 L +W e 3+ W g 4 L +W g 3 U +W ff 3 =1.167 ×10 N
W 3=0.7038 .665 ×107 N +1.438 ×107 N + 1.057× 107 N +1.167 ×107 N
W 3=8.665 ×107 N

b. upper half of the 2nd Storey


h height of glass included in the upper half of the

gu2 :=900 mm 2nd Storey

Lg2 :=80 m total length of the glass in the 2 nd Storey



W g 2U :=t g ⋅hgu 2 ⋅ Lg ⋅ γ glass

W g 2U =18.072⋅ kN

8 Floor Finish at the Roof Deck


W ff 2 :=W ff 3

W ff 2=5953.230⋅ kN

9 Cladding

[ ( ) ]
W Cl 2 := (P)⋅
h2 h3
+ ⋅ t cl ⋅ γ cladding  
2 2
W Cl 2=149.926 ⋅ kN

10 Mechanical Duct
W md 2 :=W md3 
W md2  =778.2⋅ kN

11 Fiberboard
Pfb 2 :=P

[ ( )]
W fb2 := Pfb 2 ⋅
h2 h3
+
2 2
⋅ Pfb

W fb2=2.499⋅ kN

12 Metal Frame
Pmf 2 :=P   Perimeter of the Metal Frame  

[
W mf 2 := P mf 2 ⋅ ( h2 + h2 )] ⋅ P
2 3
mf

W mf 2=316.51⋅ kN

13 Live Loads
W fa2  :=W fa3 
W fa2   =7392.900 ⋅kN

1 Slab/Stairs
W ss =27548.28⋅ kN
2 Transverse Beams
N tb 2 :=7 C   No. of transverse beams  
W fb 2 :=( A3 rd ⋅W ) ⋅γ steel   ⋅ N tb 2
W fb 2=28704.057 ⋅kN

3 Longitudinal Beams
N Lb2 :=63   No. of longitudinal beams  
W Lb 2 :=( A3 rd ⋅ L ) ⋅ γ steel   ⋅ N Lb 2
W Lb2=34991.102 ⋅kN

4 Lower Half of the 3rd Storey Columns


N C3 =86   No. of columns  

[ (
W C 3 L := A 3 ⋅
h3
2 )]
−d 3 rd ⋅ γ steel   ⋅ N C3

W C 3 L =366.484 ⋅kN

5 Lower Half of the 3ra Storey Walls


LW =1.2×10 3 m   Total Length of Walls  
h
W W 3 L :=LW ⋅† W ⋅ 3 ⋅γ concrete  
2
W W 3 L =5664.000⋅ kN

6 Elevators
W e 2 :=W et  
W e 2=18.683 ⋅ kN

5. Glass
a. lower half of the 3rd Storey

h   height of glass included in the lower half of the  


  g.3:   3rd Storey  
g 3=80 m   total length of the glass in the 3rd Storey  
W g 3 L:=g⋅ h gL3 ⋅ lg −γ ⁡γ   glass  
W g 3 L =14.056 ⋅kN

14 Marbles
wm 2 :=W m 3
w m 2=953.295 ⋅kN

15 Access Floor System


W afs2   := A t ⋅ P   afs  
W afs2  =9338.400⋅ kN

16 Upper Half of 2nd Storey Columns


N C 2 =86   No. of columns  

[ (
W C 2 U := A 2 ⋅
h2
2 )]
−d 3 rd ⋅γ steel   ⋅ N C 2

W C 2 U =463.248 ⋅ kN

17 Upper Half of the 2nd Storey Walls


LW =1.2×10 3   mTotal Length of Walls  
h2
W W 2 U :=LW ⋅t W ⋅ ⋅ γ  concrete  
2
W w 2 U =6018.000 ⋅ kN

18 Total Weight
7
W 2 :=W SS +W fb 2 +W Lb2+ W C 3 L =9.161 ×10 N
7
W fa 2+ W m 2 +W C 2 U + W w 2 U =1.483 ×10 N
7
W fd 2+ W fb 2+ W afs 2+W mf 2=1.044 ×10 N
W W 3 L +W e2 +W g 3 L +W g 2 U +W ff 2 +W Cl 2=1.182× 107 N
7
W 2=9.161 ×10 N

LEVEL 1-includes all the live load and dead load of the lower half of the 2 nd Storey and
upper half of the Ist Storey

1 Slab/Stairs
W SS=27548.28 ⋅ kN

2 Transverse Beams
N tbl   1 :=72   No. of transverse beams  
W tb  1 :=( A 2 nd ⋅ W ) ⋅γ steel   ⋅ N tbl  

W fb1=29524.173 ⋅ kN

3 Longitudinal Beams
N Lb1 :=63   No. of longitudinal beams  
W Lb1 :=( A 2 nd ⋅ L ) ⋅ γ steel   ⋅ N Lb1
W Lb1=34991.102 ⋅kN

4 Lower Half of the 2 nd Storey Columns


N C 2=86   No. of columns  

[
W C 2 L := A 2 ⋅ ( h2 −d )] ⋅ γ
2
2 nd steel  ⋅ N C 2

W C 2 L =463.248 ⋅ kN

5 Lower Half of the 2 nd Storey Walls


3
LW =1.2×10 m   Total Length of Walls  
h
W W 2 L :=LW ⋅ t W ⋅ 2 ⋅γ   concrete  
2
W W 2 L =60 18.000⋅ kN
W el :=W et  
W e 1=18.683 ⋅ kN

6 Elevators

6. Glass
a. lower half of the 2 nd Storey

  h     height of glass included in the lower half of the  


Lg2=80 m   total length of the glass in the   2 nd   Storey  
W g 2 L :=t g ⋅ h gL2 ⋅ L2 ⋅ γ  glass  
W g 2 L =24.096 ⋅ kN
  b. upper half of the ist Storey  
  height of glass included in the upper half of the  
⋅ ⋅γ
W glu := g g ⋅h gul⋅ g   glass  
w g VU =45.18 ⋅kN

8 Floor Finish at the Roof Deck


W ff 1 :=W ff 2
W ff 1=5953.230⋅ kN

9 Cladding

[ ( ) ]
W Cl 1 := (P)⋅
h1 h2
+ ⋅ t Cl ⋅ γ  cladding  
2 2
W Cl 1=154.469 ⋅ kN

10 Mechanical Duct
W md  1 :=W md 2
W md1 1=778.2 ⋅kN

11 Fiberboard
Pfbl :=P   Perimeter of the Fiberbocrd  

[
W fb1 := Pfbl ⋅ ( h2 + h2 )] ⋅ P
1 2
fb

W fbl=2.574 ⋅ kN

12 Metal Frame
Pmfl :=P   Perimeter of the Metal Frame  

[
W mfl := P mfl ⋅ ( h2 + h2 )] ⋅P
1 2
mf

W mfl=326.101 ⋅kN

13 Live Loads
W fal   :=W fa2  
W fal   =7392.900 ⋅kN

14 Marbles
W m 1 :=W m 2
w m 1=953.295 ⋅kN

15 Access Floor System


W afs  1 :=A t ⋅ Pafs  

W afs  1 =9338.400 ⋅ kN

N C 1=88   No. of columns  

[
W ClU := A1 ⋅ ( h2 −d )] ⋅γ
1
2 nd steel   ⋅ NC1

W ClU =474.021 ⋅kN

17 Upper Half of the Ist Storey Walls


LW =1.2×10 3   mTotal Length of Walls  
h
W WlU :=LW ⋅t W ⋅ 1 ⋅γ concrete  
2
W WlU =6018.000⋅ kN

18 Total Weight
W 1 :=W SS +W fbl +W Lbl +W C L=9.253× 107 N
W mfl +W fal +W ml + W ClU +W W l U =1.516 × 107 N
W ffl 1 +W Cl 1+W mdl +W fbl1 +W afs1=1.623 ×107 N
W W 2 L +W el +W g 2 L +W glU =6.106 ×106 N
W 1=92526.803 ⋅ kN

7. SUMMATION
W 1=9.253× 104 ⋅kN
4
W 2 =9.161× 10 ⋅kN
4
W 3 =8.665 ×10 ⋅kN
5
W 4=1.233 ×10 ⋅kN
5
W 5=1.092 ×10 ⋅kN