ENGINEERING

UTILITIES 2: PROJECT
SECOND SEMESTER: AY 2020 - 2021

GIVEN NAME MIDDLE INITIAL SURNAME


COURSE | YEAR AND SECTION
Table of Contents

Executive Summary....................................................................................................................................2
Plumbing system.........................................................................................................................................3
Initial observation....................................................................................................................................3
Water supply layout................................................................................................................................3
Sanitary layout.........................................................................................................................................3
Summary and recommendation..............................................................................................................3
Fire protection system.................................................................................................................................4
Initial observation....................................................................................................................................4
Assessment..............................................................................................................................................4
Summary and recommendation..............................................................................................................4
Cooling and ventilation system...................................................................................................................5
Initial observation....................................................................................................................................5
Assessment..............................................................................................................................................5
Summary and recommendation..............................................................................................................5
Acoustic system...........................................................................................................................................6
Initial observation....................................................................................................................................6
Assessment..............................................................................................................................................6
Summary and recommendation..............................................................................................................6
Lighting system............................................................................................................................................7
Initial observation....................................................................................................................................7
Assessment..............................................................................................................................................7
Summary and recommendation..............................................................................................................7

Page 1 of 8
Executive Summary

(it is the overview of the content of the paper, the summary of each assessment and the relation
of each system design to the field of building design)

Page 2 of 8
Plumbing system
(Give a brief description of the system, and the target outcome of the assessment of the said
system)

Initial observation
(Do an initial observation of the plumbing layout. List down the information or observation that
will enable you to draw conclusion and recommendation from the design layout)

Water supply layout


(Start with the presentation of the drawings, give description/explanation of the figures. Then
present the summary of pipe diameters and specifications in table form)

Sanitary layout
(Start with the presentation of the drawings, give description/explanation of the figures. Then
present the summary of pipe diameters and specifications in table form)

Summary and recommendation


(Base on your initial observation and the layout design that you have created, draw some
recommendations that will help with the current system layout and operation)

Page 3 of 8
Fire protection system
(Give a brief description of the system, and the target outcome of the assessment of the said
system)

Initial observation
(Do an initial observation of the condition of the household pertinent to the fire protection
assessment. List down the information or observation.)

Assessment
(Using your floor plan as reference, identify all the fire exit points and the fire exit plan of your
house. Fire exit plan is a path that must be taken by the individual from his location to the identified fire
exit points.)

(Using the Fire Code of the Philippines, specifically Section 10.2.14.6, identify the passive and
active fire protection that are being used in your house.)

Summary and recommendation


(Base on your initial observation and the layout design that you have created, draw some
recommendations that will help with the current system layout and operation)

Page 4 of 8
Cooling and ventilation system
(Give a brief description of the system, and the target outcome of the assessment of the said
system)

Initial observation
(Do an initial observation of the condition of the household pertinent to cooling and ventilation
system. List down the information or observation.)

Assessment
(Using your floor plan as your reference, identify first the orientation of your house also include
conditions within the property line. Any trees or external shades should be identified as well as nearby
buildings/structures.)

(Based on your calculation on quiz 2, create a summary table and give a brief description of the
calculations done)

Summary and recommendation


(Base on your initial observation and the layout design that you have created, draw some
recommendations that will help with the current system layout and operation)

Page 5 of 8
Acoustic system
(Give a brief description of the system, and the target outcome of the assessment of the said
system)

Initial observation
(Do an initial observation of the condition of the household pertinent to acoustic system. List
down the information or observation.)

Assessment
(Using your floor plan and site plan as reference, map the external and internal sources of
noise/sound in your area. Red dot for loud noise and blue dot for tolerable noise. Give a description or
analysis of the figure)

(Identify the current acoustical controls, passive and active that lessen the perceived noise)

Summary and recommendation


(Base on your initial observation and the layout design that you have created, draw some
recommendations that will help with the current system layout and operation)

Page 6 of 8
Lighting system
(Give a brief description of the system, and the target outcome of the assessment of the said
system)

Initial observation
(Do an initial observation of the condition of the household pertinent to lighting system. List
down the information or observation.)

Assessment
(Using your floor plan and site plan as reference, locate all the artificial light sources and any
means to utilize daylight. Also describe the way, average duration of utilization of the artificial light
sources are being utilized.)

Summary and recommendation


(Base on your initial observation and the layout design that you have created, draw some
recommendations that will help with the current system layout and operation)