You are on page 1of 13

FRONT ELEVATION

TOTAL AREA OF THE AREA OF DOORS:


109.15
FRONT: D/1 2.94
D/6 3.36
AREA OF WINDOWS:
NET AREA OF THE
FRONT (W/O W/1 3.6
91.77
WINDOWS AND W/2 2.88
DOORS):
W/3 1.44
W/4 0.36
STAIRS 3.8 W/5 1.08
W/8 0.72

TOTAL AREA OF WINDOWS AND DOORS:


PER DOOR OR WINDOW AREA PER PIECE QTY
D/1 2.94 1
D/6 3.36 2
W/1 3.6 1
W/2 2.88 1
W/3 1.44 2
W/4 0.36 1
W/5 1.08 1
W/8 0.72 1
GRAND TOTAL:

NUMBER OF CHB REQUIRED PLASTER NEEDED (40KG CLASS B):


1147.125
(CLASS B):
AREA REQUIRED TO BE PLASTERED 91.77

FOR MORTAR: FACES 2

NUMBER OF BAGS OF CEMENT TOTAL AREA TO BE PLASTERED 183.54


92.96301
NEEDED ( 40KG CLASS B):
NUMBER OF CEMENT NEEDED (IN
35.23968
NUMBER OF SAND IN CU.M BAGS)
7.745388
NEEDED (15x20x40 CHB SIZE):
NUMBER OF SAND NEEDED (IN CU.M) 2.93664

TOTAL MATERIALS NEEDED


TYPE OF MATERIAL TOTAL NUMBER OF MATERIAL NEEDED
CHB 1147.125
CEMENT 137.22519
SAND 11.283528
GRAVEL 1.203

TOTAL MATERIALS NEEDED (ROUNDED OFF)


TYPE OF MATERIAL TOTAL NUMBER OF MATERIAL NEEDED
CHB 1148
CEMENT 138
SAND 12
GRAVEL 2

LEFT ELEVATION
LEFT SIDE ELEVATION (FIREW
LENGTH 10.0000
WIDTH 9.7000

NUMBER OF CHB REQUIRED (CLASS


1212.5
B):

FOR PLASTER NEEDED (40KG CLASS B):

AREA TO BE PLASTERED 97.0000

FACE 2.0000

TOTAL AREA TO BE PLASTERED 194.0000

NUMBER OF CEMENT NEEDED (IN


37.248
BAGS)
NUMBER OF SAND NEEDED (IN
3.104
CU.M)

TOTAL MATERIALS NEEDED


TYPE OF MATERIAL TOTAL NUMBER OF MATERIAL NEEDED
CHB 1212.5000
CEMENT 139.109
SAND 11.5308
GRAVEL 0.48

TOTAL MATERIALS NEEDED


TYPE OF MATERIAL TOTAL NUMBER OF MATERIAL NEEDED
CHB 1213
CEMENT 140
SAND 12
GRAVEL 1

RIGHT ELEVATION
RIGHT SIDE ELEVATION
LENGTH 10.0000
WIDTH 9.7000
TOTAL AREA (MINUS THE WINDOW AREA)
NUMBER OF CHB REQUIRED (CLASS B): 1185.5

FOR PLASTER NEEDED (40KG CLASS B):

AREA TO BE PLASTERED 94.8400

FACE 2.0000

TOTAL AREA TO BE PLASTERED 189.6800

NUMBER OF CEMENT NEEDED (IN


36.41856
AREA OF WINDOWS: BAGS)
W/8 1.44
NUMBER OF SAND NEEDED (IN CU.M) 3.03488
W/3 0.72
TOTAL AREA 2.16

TOTAL MATERIALS NEEDED


TYPE OF MATERIAL TOTAL NUMBER OF MATERIAL NEEDED
CHB 1185.5000
CEMENT 135.55148
SAND 11.243376
GRAVEL 0.408

TOTAL MATERIALS NEEDED


TYPE OF MATERIAL TOTAL NUMBER OF MATERIAL NEEDED
CHB 1186
CEMENT 136
SAND 12
GRAVEL 1

REAR ELEVATION
TOTAL AREA OF THE AREA OF DOORS:
83.25
FRONT: D/2 1.68

FIREWALL 22.79 AREA OF WINDOWS:


W/2 2.88
STAIRS 3.8 W/3 1.44
W/4 0.36
W/6 0.96
NET AREA OF THE
FRONT (W/O W/9 2.16
95.8
WINDOWS AND
DOORS):

TOTAL AREA OF WINDOWS AND DOORS:


PER DOOR OR WINDOW AREA PER PIECE QTY
D/2 1.68 1
W/2 2.88 2
W/3 1.44 1
W/4 0.36 3
W/6 0.96 2
W/9 2.16 1
GRAND TOTAL:

NUMBER OF CHB REQUIRED PLASTER NEEDED (40KG CLASS B):


1197.5
(CLASS B):
AREA REQUIRED TO BE PLASTERED 95.8

FOR MORTAR: FACES 2

NUMBER OF BAGS OF CEMENT TOTAL AREA TO BE PLASTERED 191.6


97.0454
NEEDED ( 40KG CLASS B):
NUMBER OF CEMENT NEEDED (IN
36.7872
NUMBER OF SAND IN CU.M BAGS)
8.08552
NEEDED (15x20x40 CHB SIZE):
NUMBER OF SAND NEEDED (IN CU.M) 3.0656

TOTAL MATERIALS NEEDED


TYPE OF MATERIAL TOTAL NUMBER OF MATERIAL NEEDED
CHB 1197.5000
CEMENT 143.5976
SAND 11.80212
GRAVEL 1.302

TOTAL MATERIALS NEEDED


TYPE OF MATERIAL TOTAL NUMBER OF MATERIAL NEEDED
CHB 1198
CEMENT 144
SAND 12
GRAVEL 2

FENCE
FENCE
LENGTH 11.2500 m
WIDTH 2.0000 m

NUMBER OF CHB REQUIRED FOR M


281.25
(CLASS B): NUMBER OF BAGS O
NEEDED ( 40KG C
FOR CHB FOOTING: NUMBER OF SAND
NEEDED (15x20x40
TOTAL LENGTH OF THE FOOTING 11.25

NUMBER OF CEMENT NEEDED FOR PLASTER NEE


5.0625
(IN BAGS)
NUMBER OF CEMENT NEEDED
5.0625
(IN BAGS)
TOTAL AREA TO BE
NUMBER OF SAND NEEDED (IN
0.3375
CU.M) NUMBER OF CEMENT
NUMBER OF GRAVEL NEEDED BAGS)
16.875
(IN CU.M) NUMBER OF SAND
CU.M)

INSIDE WALLS or PARTITIONS

NON BEARING WALLS


MINUS AREA OF W/ AND
WALL LENGTH WIDTH AREA TOTAL AREA
D/
3 2.8 3.2 8.96 1.26 7.7
4 1.7 3.2 5.44 0 5.44
5 2.8 3.2 8.96 0 8.96
6 2.25 3.2 7.2 1.68 5.52
7 2.8 3.2 8.96 1.68 7.28
8 3.3 3.2 10.56 0 10.56
9 2.8 3.2 8.96 0 8.96
10 4.25 3.2 13.6 1.68 11.92
11 2.8 3.2 8.96 1.26 7.7
12 1.45 3.2 4.64 0 4.64
13 2.8 3.2 8.96 0 8.96
14 4 3.2 12.8 0 12.8
15 3.3 3.2 10.56 1.26 9.3
16 3.3 3.2 10.56 1.26 9.3
17 2.25 3.2 7.2 1.68 5.52
18 2.8 3.2 8.96 0 8.96
19 1.45 3.2 4.64 0 4.64
20 2.8 3.2 8.96 1.26 7.7
21 4.25 3.2 13.6 1.68 11.92
22 2.8 3.2 8.96 0 8.96
TOTAL AREA 166.74

AREA OF WINDOWS: AREA OF DOORS:


W/1 3.6 D/1 2.94
W/2 2.88 D/2 1.68
W/3 1.44 D/3 1.68
W/4 0.36 D/4 1.26
W/5 1.08 D/5 2.52
W/6 0.96 D/6 3.36
W/7 0.72
W/8 0.72
W/9 2.16

BEARING WALL
MINUS AREA OF W/ AND
WALL LENGTH WIDTH AREA TOTAL AREA
D/
1 6.8 4.2 28.56 3.96 24.6
2 4 3.2 12.8 2.64 10.16
TOTAL AREA 34.76

AREA OF WINDOWS: AREA OF DOORS:


W/1 3.6 D/1 2.94
W/2 2.88 D/2 1.68
W/3 1.44 D/3 1.68
W/4 0.36 D/4 1.26
W/5 1.08 D/5 2.52
W/6 0.96 D/6 3.36
W/7 0.72
W/8 0.72
W/9 2.16
RS:
QTY TOTAL AREA
1 2.94
2 6.72
1 3.6
1 2.88
2 2.88
1 0.36
1 1.08
1 0.72
21.18

FOR CHB FOOTING:

TOTAL LENGTH OF THE FOOTING 20.05

NUMBER OF CEMENT NEEDED


9.0225
(IN BAGS)
NUMBER OF SAND NEEDED (IN
0.6015
CU.M)
NUMBER OF GRAVEL NEEDED
1.203
(IN CU.M)

ERIAL NEEDED UNIT


PIECES
BAGS
CU.M
CU.M

OFF)
ERIAL NEEDED UNIT
PIECES
BAGS
CU.M
CU.M

EVATION (FIREWALL)
10.0000 m TOTAL
97.0000
9.7000 m AREA

FOR MORTAR:
NUMBER OF BAGS OF CEMENT
98.261
NEEDED ( 40KG CLASS B):
NUMBER OF SAND IN CU.M
8.1868
NEEDED (15x20x40 CHB SIZE):

FOR CHB FOOTING:

TOTAL LENGTH OF THE FOOTING 8

NUMBER OF CEMENT NEEDED


3.6
(IN BAGS)
NUMBER OF SAND NEEDED (IN
0.24
CU.M)
NUMBER OF GRAVEL NEEDED
0.48
(IN CU.M)

ERIAL NEEDED UNIT


PIECES
BAGS
CU.M
CU.M

ERIAL NEEDED UNIT


PIECES
BAGS
CU.M
CU.M

SIDE ELEVATION
10.0000 m
AREA 97.0000
9.7000 m
INDOW AREA) 94.8400
FOR MORTAR:
NUMBER OF BAGS OF CEMENT
96.07292
NEEDED ( 40KG CLASS B):
NUMBER OF SAND IN CU.M
8.004496
NEEDED (15x20x40 CHB SIZE):

FOR CHB FOOTING:

TOTAL LENGTH OF THE FOOTING 6.8

NUMBER OF CEMENT NEEDED


3.06
(IN BAGS)
NUMBER OF SAND NEEDED (IN
0.204
CU.M)
NUMBER OF GRAVEL NEEDED
0.408
(IN CU.M)

ERIAL NEEDED UNIT


PIECES
BAGS
CU.M
CU.M

ERIAL NEEDED UNIT


PIECES
BAGS
CU.M
CU.M

RS:
QTY TOTAL AREA
1 1.68
2 5.76
1 1.44
3 1.08
2 1.92
1 2.16
14.04

FOR CHB FOOTING:

TOTAL LENGTH OF THE FOOTING 21.7

NUMBER OF CEMENT NEEDED


9.765
(IN BAGS)
NUMBER OF SAND NEEDED (IN
0.651
CU.M)
NUMBER OF GRAVEL NEEDED
1.302
(IN CU.M)

ERIAL NEEDED UNIT


PIECES
BAGS
CU.M
CU.M

ERIAL NEEDED UNIT


PIECES
BAGS
CU.M
CU.M

TOTAL
22.5000
AREA

FOR MORTAR:
UMBER OF BAGS OF CEMENT
22.7925
NEEDED ( 40KG CLASS B):
NUMBER OF SAND IN CU.M
1.899
EEDED (15x20x40 CHB SIZE):

FOR PLASTER NEEDED (40KG CLASS B):


TAL AREA TO BE PLASTERED 45.0000

MBER OF CEMENT NEEDED (IN


8.64
BAGS)
UMBER OF SAND NEEDED (IN
0.72
CU.M)

TIONS

NUMBER OF CHB REQUIRED


2084.25
(CLASS B):

FOR MORTAR:

NUMBER OF BAGS OF CEMENT


87.5385
NEEDED ( 40KG CLASS B):

NUMBER OF SAND IN CU.M


73.03212
NEEDED (15x20x40 CHB SIZE):

PLASTER NEEDED (40KG CLASS B):


AREA REQUIRED TO BE
166.74
PLASTERED
FACES 2

TOTAL AREA TO BE PLASTERED 333.48

NUMBER OF CEMENT NEEDED


64.02816
(IN BAGS)
NUMBER OF CEMENT NEEDED
64.02816
(IN BAGS)
NUMBER OF SAND NEEDED (IN
5.33568
CU.M)

FOR CHB FOOTING:

TOTAL LENGTH OF THE FOOTING 56.7

NUMBER OF CEMENT NEEDED


25.515
(IN BAGS)
NUMBER OF SAND NEEDED (IN
1.701
CU.M)
NUMBER OF GRAVEL NEEDED
3.402
(IN CU.M)

NUMBER OF CHB REQUIRED


434.5
(CLASS B):

FOR MORTAR:

NUMBER OF BAGS OF CEMENT


18.249
NEEDED ( 40KG CLASS B):

NUMBER OF SAND IN CU.M


15.22488
NEEDED (15x20x40 CHB SIZE):

PLASTER NEEDED (40KG CLASS B):


AREA REQUIRED TO BE
34.76
PLASTERED
FACES 2

TOTAL AREA TO BE PLASTERED 69.52

NUMBER OF CEMENT NEEDED


13.34784
(IN BAGS)
NUMBER OF SAND NEEDED (IN
1.11232
CU.M)

FOR CHB FOOTING:

TOTAL LENGTH OF THE FOOTING 34.76

NUMBER OF CEMENT NEEDED


15.642
(IN BAGS)
NUMBER OF SAND NEEDED (IN
1.0428
CU.M)
NUMBER OF GRAVEL NEEDED
2.0856
(IN CU.M)
NUMBER OF GRAVEL NEEDED
2.0856
(IN CU.M)