Essential Electrical load Calculation - Manglam Ananda at Jaipur (Phase-02)-

Commercial
ESS- 02

S.no Description No. of unit Load per Unit Total Load

Tower - 4,5 & 13 (S+12) Nos of Block = 3


1 4 BHK 72 units @ 0.75 KW = 54 KW
2 4 BHK + Servent 66 units @ 0.75 KW = 50 KW
3 3 BHK + 3 Toi 6 units @ 0.75 KW = 5 KW

Tower - 1 & 3 (3rd to 12th) Nos of Block = 2


4 3 BHK + 3 Toi. (1) 40 units @ 0.75 KW = 30 KW
5 3 BHK + 3 Toi. (2) 40 units @ 0.75 KW = 30 KW

Tower - 2 (3rd to 12th) Nos of Block = 1


6 3 BHK + 3 Toi. (2) 40 units @ 0.75 KW = 30 KW

Commercial

7 Commercial 96 units @ 0.75 KW = 72 KW

COMMON SERVICES - Towers

Tower - 4,5 & 13 (S+12) Nos of Block = 3

8 Elevators (16 Passenger) 1.0 mps 6 nos @ 9.0 KW = 54 KW

9 Common Lights 3 towers @ 2.0 KW = 6 KW

Tower - 1 & 3 (3rd to 12th) Nos of Block = 2

10 Elevators (16 Passenger) 1.0 mps 4 nos @ 9.0 KW = 36 KW

11 Common Lights 2 towers @ 2.0 KW = 4 KW

Tower - 2 (3rd to 12th) Nos of Block = 1

12 Elevators (16 Passenger) 1.0 mps 2 nos @ 9.0 KW = 18 KW

13 Common Lights 1 towers @ 2.0 KW = 2 KW

COMMON SERVICES - General

14 External / Gate / Landscape lighting = 5 KW

15 Basement Lights 7461 Sq M @ 0.7 W/sq m = 5 KW

16 Basement Ventilation = 50 KW

17 Club = 200 KW

Total Load = 650 KW


By taking Overall Diversity factor 75 % => 488 KW

By taking Power factor 0.80 => 610 KVA


Total Electrical Load = 610 KVA

Recommended DG Sets at 85% loading


= 1 no. 380 KVA + 1 nos 250 KVA (for Residential & common services)
and 1 nos 125 KVA (for Commercial)