Project Start Date 8/9/2022 (Tuesday) Tuần Hiển Thị 1 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8
Project Lead Mr . Lân 8 Aug 2022 15 Aug 2022 22 Aug 2022 29 Aug 2022 5 Sep 2022 12 Sep 2022 19 Sep 2022 26 Sep 2022
Người % 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2
WORK
WBS Danh Mục Việc Làm Thực Ngày Bắt ĐầuNgày Hoàn Thành Trong Bao Lâu Hoàn
DAYS
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
Err:50 Kế Hoạch Ngày hiện - Thành] -
Lập bảng kế hoạch
Err:508 ngày/tuần/tháng. Đăng tin [Name] Mon 8/08/22 Mon 8/08/22 1 100% 1
Err:508 [Task] FB/Tìm Data Khách Tue 8/09/22 Thu 8/11/22 3 75% 3
Err:508 [Task] Fri 8/12/22 Fri 8/12/22 1 0% 1
Err:508 [Task] Sat 8/13/22 Sat 8/13/22 1 0% 1
Err:508 [Sub-task] Sun 8/14/22 Sun 8/14/22 1 0% 1
Err:508 [Sub-task] Mon 8/15/22 Mon 8/15/22 1 0% 1
Err:508 [Task] Tue 8/16/22 Tue 8/16/22 1 0% 1
Err:508 [Task] Wed 8/17/22 Wed 8/17/22 1 0% 1
Err:508 [Task] Thu 8/18/22 Thu 8/18/22 1 0% 1
Err:50 Kế Hoạch Tuần - -
Err:508 [Task] Sat 2/10/18 Mon 2/12/18 3 0% 1
Err:508 [Task] Wed 2/14/18 Fri 2/16/18 3 0% 3
Err:508 [Task] Sun 2/18/18 Tue 2/20/18 3 0% 2
Err:508 Thu 2/22/18 Thu 2/22/18 1
Err:508 Mon 2/26/18 Mon 2/26/18 1
Err:508 [Task] Fri 3/02/18 Wed 3/07/18 6 0% 4
Err:508 Tue 3/06/18 Tue 3/06/18 1
Err:508 [Task] Sat 3/10/18 Mon 3/12/18 3 0% 1
Err:508 - -
Err:508 [Task] Sat 2/10/18 Tue 2/13/18 4 0% 2
Err:508 [Task] Wed 2/14/18 Fri 2/16/18 3 0% 3
Err:508 [Task] Wed 2/14/18 Fri 2/16/18 3 0% 3
Err:508 [Task] Sat 2/17/18 Thu 2/22/18 6 0% 4
Err:508 [Task] Fri 2/23/18 Sun 2/25/18 3 0% 1
Err:508 [Task Category] - -
Err:508 [Task] Mon 1/29/18 Mon 1/29/18 1 0% 1
Err:508 [Task] Tue 1/30/18 Tue 1/30/18 1 0% 1
Err:508 [Task] Wed 1/31/18 Wed 1/31/18 1 0% 1
Err:508 [Task] Thu 2/01/18 Thu 2/01/18 1 0% 1
Err:508 [Task] Fri 2/02/18 Fri 2/02/18 1 0% 1
Err:508 -
Err:508 -
Inserting
When New Tasks
inserting (Rows)
and deleting tasks, you need to insert and delete entire rows. Some
columns contain formulas (such as the End Date and the Work Days columns), so these
formulas need to copied to the newly inserted rows.
METHOD 1 (recommended)
• Insert a new
With the newblank
blankrow
rowby right-clicking
selected, press on the row
Ctrl+d number
to copy and selecting
the formulas Insert.
and formatting down
from the row above OR use the row drag handle to copy the formulas and formatting
down.
METHOD 2
• Copy a row from the set of template rows at the bottom of the worksheet.
• Right-click on the row where you want to insert the new task and select Insert Copied
Cells.
Method 2 will work, but Excel will split/fracture/duplicate conditional formatting rules rather
than merging the rules. This can cause inefficiencies in very large and heavily modified
files.
Help improve Excel by voting on a suggestion to fix this problem.
Q: How do I create a summary row that shows the MIN and MAX dates for all sub-tasks?
In the Start column, use the formula =MIN(range_of_start_dates)
In the End column, use the formula =MAX(range_of_end_dates)
In the Days column, use the formula =end_date-start_date+1
The %Complete for a group of tasks can be calculated from its sub tasks using the
Q: How do below,
formula
Example: I calculate
say the
Let's where %Complete
you"workdays" for
have 3 subistasks anthat
entire
a reference category
areto thedays,
10 of12tasks?
range ofdays,
workand
day14
values
daysand
long,
"complete" is Ifa the
respectively. reference to the is
first subtask %complete for each
50% complete and of
thethe subtasks.
others are 25% complete, you
=SUMPRODUCT(workdays,complete)/SUM(workdays)
could calculate the overall percent complete for the group as: =(10*50%+12*25%
+14*25%)/(10+12+14).
Q: Find
I've messed upworks,
a row that the chart
thenarea somehow.
copy the cells How do I fix
that make upit?the gantt chart area from that row
into the row that is messed up.
Input Cell