Professional Documents
Culture Documents
SERVICE WATER SYSTEM DESCRIPTION 服务水
SERVICE WATER SYSTEM DESCRIPTION 服务水
OWNER’S ENGINEER
EPC CONTRACTOR
DESIGNER
PROJECT
AL DUR II IWPP
FOR APPROVAL
VALID FOR PURCHASE
FOR CONSTRUCTION
AS BUILT
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
2 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
CONTENTS:
1. AIM ............................................................................................................................... 3
2. GENERAL DESCRIPTION ........................................................................................... 4
2.1. MAIN FUNCTIONS ........................................................................................... 4
2.2. DESCRIPTION.................................................................................................. 7
2.3. MAIN EQUIPMENT ........................................................................................... 8
3. INTERFACES............................................................................................................... 9
3.1. GENERAL ......................................................................................................... 9
3.2. SUPPORT SYSTEMS ....................................................................................... 9
3.3. DEPENDENT SYSTEMS .................................................................................. 9
4. OPERATION CONCEPT .............................................................................................10
4.1. NORMAL OPERATION ....................................................................................10
4.2. START-UP .......................................................................................................10
4.3. SHUTDOWN ....................................................................................................11
5. INSTRUMENTATION AND CONTROL .......................................................................12
5.1. INSTRUMENTATION .......................................................................................12
5.2. Control .............................................................................................................12
6. REFERENCE DOCUMENTS .......................................................................................21
7. ANNEXES ...................................................................................................................22
PROJECT DOCUMENT OWNER
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
3 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
1. AIM
The aim of this document is to provide a description of the Service Water System for Al Dur
II Project, to be erected by SEPCOIII in Bahrain.
This document defines purpose, characteristic, control and protection philosophy for the
above-mentioned system.
In addition to the service water system, this document also covers the filling system of the
firefighting water tanks as this uses the same water quality from the desalination plant.
PROJECT DOCUMENT OWNER
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
4 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
2. GENERAL DESCRIPTION
The main function of service water system is to store and supply service water to the
following consumers:
The service water system covers demand for potable water and industrial service water for
the power plant.
Service water is received from the desalination plant (through the terminal point). From
terminal point, filling line is routed to potable/service water tanks. Then it will be distributed
by service water distribution pumps to the following customers:
o Gatehouse Building
o Administration Building.
o Social Building
o GIS facilities
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
5 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
o MV electrical building
o Gatehouse Building
o Administration Building.
o Social Building
o Electrochlorination building
o Neutralization plant
o Laboratory
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
6 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
o Electrochlorination building
o GT 11/12/21/22 area
o ST 10/20 area
o GRMS area
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
7 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
Other uses:
2.2. DESCRIPTION
The service water system includes the following equipment to store and supply service
water to the consumers mentioned in previous section:
Hydropneumatic tank
Distribution system
Water is received in the tanks from desalination plant (potable water quality) by an
automatic filling system based on level in the tank.
From the tank, water is distributed by the service water distribution pumps to all the
consumers. Pumps are protected by dedicated strainer provided with differential pressure
transmitters for monitoring.
In the discharge header, an hydropneumatic tank is provided to reduce the start-stop cycles
of the pumps and to avoid the need to have the pumps running continuously.
PROJECT DOCUMENT OWNER
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
8 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
In this section most relevant equipment and components of the system are highlighted.
Reference drawings:
Control function: yes, pump start-stop to maintain pressure in the distribution header. Tank
maintains the pressure when pumps are stopped to provide water for small demands.
Reference drawings:
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
9 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
3. INTERFACES
3.1. GENERAL
The interfaces of the service water system with other systems or related equipment are
described below. The interfaces are classified according to those that are necessary for the
operation of the system (support systems) or according to those that are provided by the
system and are necessary in order to allow other systems to carry out their functions
(dependent systems).
Mechanical systems:
Plant drain system, for drain collection of the service water system
Electrical Systems:
Low voltage system, for operation of service water distribution pumps & motorized
valves.
Control Systems:
Mechanical systems:
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
10 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
4. OPERATION CONCEPT
Service/potable water is a basic service required in several areas of the plant for domestic
use, emergency showers, maintenance, HVAC and other uses. Therefore this system must
be continuously operating.
In normal operation the status of the main equipment and components will be as follows:
Both service/water tanks will be operating, maintaining the stock of water in the tanks
through the automatic filling system (water provided from desalination plant)
One pump will be starting and stopping depending on the pressure of the distribution
header.
Hydropneumatic tank will maintain the pressure in the system when the pump stops,
and will provide some water for small demands until the pressure reduces and the
pumps starts again.
4.2. START-UP
For the start up of this system, the following conditions are required:
Piping distribution system is full of water and air is properly vented from all high
points.
Startup of this system is done automatically and is summarized in the following events:
Tank filling valves are put in auto to maintain the tanks full (this requires the
desalination plant to be in operation).
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
11 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
4.3. SHUTDOWN
The shutdown of this system should be done only after all systems are shutdown as this
system provides service/potable water through all the plant.
The shutdown of the system is done automatically and is summarized in the following
events:
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
12 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
In this section of the document, in addition to the service water system, it is covered the
filling system of the firefighting water tanks as this uses the same water quality from the
desalination plant and it is not covered in the firefighting system documentation.
5.1. INSTRUMENTATION
5.2. Control
In this section, descriptive narrative is provided for the control and protection of the system.
For details on the logics of this system, please refer to the following document:
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
13 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
The actuators / drives included in this functional group are shown in the table of paragraph
5.2
Service Water Functional Group receives the AUTO order from the Automatic Plant
Sequencer.
The below table summarizes the logic for the Service Water Functional Group:
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
14 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
Service Water Pumps manager’s function is to manage the automatic change over (ACO)
between the Service Water Pumps, to select the lead / lag pump motor and define the
number of required pump motors to be in service following the requirements of the system.
The below table summarizes the logic for the Service Water Pumps Manager (2ACT):
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
15 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
There are 2 x 100% service water distribution pumps. Normally, one pump is starts and
stops based on the pressure in the distribution header and the other pump is in standby (for
automatic start in case the lead pump fails).
In case of very high pressure or very low pressure in the distribution header, the pump is
tripped as this may be indicative of some problems with the running pump.
00GHE21AP001
Potable Service Water Pumps (2x100%)
00GHE22AP001
Manual reject N/A
Auto permitted Always Permitted
Auto selection Auto Sel. Order from Potable Service Water functional group
(00GHE20EE100:XA93)
PROJECT DOCUMENT OWNER
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
16 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
00GHE21AP001
Potable Service Water Pumps (2x100%)
00GHE22AP001
On permitted [Potable Service Water Tank 1 Outlet Manual Valve Open
(00GHE14CL901:XL01)
AND
Potable Service Water Tank 1 level NOT Low Low
(00GHE14CL901:XH54)
AND
Potable Service Water Tank 1 level NOT Bad Quality
(00GHE14CL901:XM26)]
OR
[Potable Service Water Tank 2 Outlet Manual Valve Open
(00GHE15CL901:XL01)
AND
Potable Service Water Tank 2 level NOT Low Low
(00GHE15CL901:XH54)
AND
Potable Service Water Tank 2 level NOT Bad Quality
(00GHE15CL901:XM26)]
Off permitted Always Permitted
Force On N/A
Force Off [Potable Service Water Tank 1 Outlet Manual Valve NOT
Open (00GHE14CL901:XL01)
OR
Potable Service Water Tank 1 level Low Low
(00GHE14CL901:XH54)
OR
Potable Service Water Tank 1 level Bad Quality
(00GHE14CL901:XM26)]
AND
[Potable Service Water Tank 2 Outlet Manual Valve NOT
Open (00GHE15CL901:XL01)
OR
Potable Service Water Tank 2 level Low Low
(00GHE15CL901:XH54)
OR
Potable Service Water Tank 2 level Bad Quality
(00GHE15CL901:XM26)]
Trip [Service Water pump Discharge pressure High High High
(00GHE30CP901:XH05)
OR
Service Water pump Discharge pressure Low Low Low
(00GHE30CP901:XH26)
OR
Service Water pump Discharge pressure Bad quality
(00GHE30CP901:XM26)]
AND
Service Water Pump is started (For a certain time delay)
(00GHE21/22AP001)
PROJECT DOCUMENT OWNER
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
17 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
00GHE21AP001
Potable Service Water Pumps (2x100%)
00GHE22AP001
Auto-ON ON Command from the Service Water pumps manager
(00GHE20EE200)
Auto-OFF OFF Command from the Service Water pumps manager
(00GHE20EE200)
These valves open and close based on the level of the corresponding service water tank.
When the level is below low level, they open to allow the service water filling the tank. Once
the level reaches the high setting, the valves automatically close, to avoid overfilling.
In case of very high level in the tank the valves are forced closed and in case of very low
level they are forced open.
The below table summarizes the logic for the Potable Service Water Tank 1/2 Makeup
MOVs:
00GHE12AA101
Potable Service Water Tank 1/2 Makeup MOVs
00GHE13AA101
Manual reject N/A
Auto permitted Always permitted
Auto selection Auto Sel. Order from Potable Service Water functional group
(00GHE20EE100:XA93)
Open permissive Always permitted
Auto open Group ON Command from Potable Service Water functional
group (00GHE20EE100:XA91)
AND
Potable Service Water Tank 1/2 Level Low
(00GHE14/15CL901:XH52)
Close permissive Always permitted
Auto Close Group OFF Command from Potable Service Water functional
group (00GHE20EE100:XA92)
OR
Potable Service Water Tank 1/2 Level High
(00GHE14/15CL901:XH01)
PROJECT DOCUMENT OWNER
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
18 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
00GHE12AA101
Potable Service Water Tank 1/2 Makeup MOVs
00GHE13AA101
Force open Potable Service Water tank /2 level low low
(00GHE14/15CL901:XH54)
Force close Potable Service Water tank 1/2 level high high high
(00GHE14/15CL901:XH05)
Fire fighting functional group is in charge of managing the start/stop or open/close of each
individual device to respond to the measured parameters of the Fire fighting water system.
The actuators / drives included in this functional group are shown in the table of paragraph
5.2
Fire fighting Functional Group receives the AUTO order from the Automatic Plant
Sequencer.
The below table summarizes the logic for the Service Water Functional Group:
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
19 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
AND
Fire & Detection Alarm System NOT General Fault
(00SGY10GH001:XM49)
AND
Fire & Detection Alarm System NOT General Alarm
(00SGY10GH001:XM48)
AND
Fire & Detection Alarm System NOT Protection
Active
(00SGY10GH001:XM32)
These valves open and close based on the level of the corresponding fire fighting water
tank. When the level is below low level, they open to allow the service water filling the tank.
Once the level reaches the high setting, the valves automatically close, to avoid overfilling.
In case of very high level in the tank the valves are forced closed and in case of very low
level they are forced open.
00SGA01AA101
Fire Fighting Tank 1/2 Makeup MOVs
00SGA01AA102
Manual reject N/A
Auto permitted Always permitted
Auto selection Fire Fighting Group ON Command from Automatic Plant
Sequencer (00SGA01EE100: XA61)
Open permissive Always permitted
Auto open Group ON Command from Fire Fighting functional group
(00SGA01EE100:XA91)
AND
Fire Fighting Tank 1& 2 Level Low
(00SGA03/04CL901:XH52)
Close permissive Always permitted
PROJECT DOCUMENT OWNER
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
20 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
00SGA01AA101
Fire Fighting Tank 1/2 Makeup MOVs
00SGA01AA102
Auto Close Group OFF Command from Fire Fighting functional group
(00SGA01EE100:XA92)
OR
Fire Fighting Tank 1& 2 Level High
(00SGA03/04CL901:XH01)
Force open Fire Fighting Tank 1& 2 level low low low
(00SGA03/04CL901:XH56)
Force close Fire Fighting Tank 1& 2 level high high high
(00SGA03/04CL901:XH05)
PROJECT DOCUMENT OWNER
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
21 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
6. REFERENCE DOCUMENTS
AL DUR II IWPP
OWNER EPC CONTRACTOR DOCUMENT NUMBER DATE
AD2-C1-00-GHU-PSD-IDM-00683 11/02/2020
DOCUMENT NAME PAGE
22 / 22
SERVICE WATER SYSTEM
DESCRIPTION Rev.: 2
7. ANNEXES