CONSTRUCTION OF MUMBAI-

AHMEDABAD HIGH SPEED RAIL


PACKAGE NO. MAHSR – C8

DESIGN CERTIFICATE
(Design developed from Standard Design)

This Design Certificate refers to Submission No. ABT/02-2022 which comprises:

Design Package No. 01B


Design Stage: ☐ Inception Report ☒ Technical Design
☐ Construction Design ☐ As-Built
Document in Respect of: Drawings for Abutment

The contents of this submission are listed in Section A below.


Documents for which a Notice of No Objection has previously been issued and which are of relevance to this
Submission are listed in Section B below.
Designer’s Statement:
We certify that the design detailing of the Works, as shown and described in the drawings and documents
listed in Section A below,
1. has been prepared/developed by us and complies with the Employer's Requirements and all other
requirements of the Contract;
2. has been confirmed as complete, adequate and valid through an in-house design and QA check
3. includes all necessary and required approvals (e.g., from Local Authorities or agencies, etc.) relating to
the design. Copies of such approvals are annexed in Section C below;
4. all effects of the design comprising the submission on, or from, the design of adjacent or other parts of the
Works and Interfacing Contracts have been fully taken into account;
5. the Employer’s Design (Standard Design) has not been altered, revised or modified beyond the extent
allowed or required by the Employer’s Requirements or the Engineer. On such basis, we are not liable for
the Employer’s Design.

Section A: - 1) Drawings for Abutment


Section B: -
Section C: - 1) No Approvals Needed.

Name: - Vishrut Gandhi (Project Manager - Design) Date: 23rd Sept 2022