SCHOOL OF ENGINEERING
CONTINUOUS ASSESSMENT
Assessment 5
(Minor Test 3)
Semester
Course
ENM2601
ENGINEERING MANAGEMENT I
1.2 Identify the situations in which a Project Breakdown Structure (PBS) is used. (6)
[20]
Question 2
2.1 Differentiate between Constant returns to scale, decrease returns to scale and increase returns
to scale. (6)
2.2 Do a comparison, presented in a tabular form, between management accounting and financial
accounting in terms of the following: (20)
• Regulations
• Range and detail of information
• Reporting intervals
• Time period
• Nature of reports
2.3 Sketch the supply-demand curve of a product X, showing the price of the product vs its quantity.
(4)
[30]