You are on page 1of 4

2*65 MW CPP UNIT

Document Ref No. Services - GNAL Date of Issue:


INS/FY-22-23/041022 04.10.2022
Boiler Steam Drum Inspection Report

Inspection : Boiler steam drum


Date of Inspection : 04.10.2022
Reported by : Om Prakash Meena

Inspection & Observation: During the boiler steam drum inspection,

 I found corrosion material rust precipitation inside the boiler drum.


 I observed that magnetite (Fe3O4) thin layer had internal drum surface.
 I found HP dosing pipe corroded.
 I observed steam separator fills erode.
2*65 MW CPP UNIT

Document Ref No. Services - GNAL Date of Issue:


INS/FY-22-23/041022 04.10.2022
Boiler Steam Drum Inspection Report

Action Taken by Operation: Sludge & metal particles removed by manual.


2*65 MW CPP UNIT

Document Ref No. Services - GNAL Date of Issue:


INS/FY-22-23/041022 04.10.2022
Boiler Steam Drum Inspection Report

Sampling: sludge & metal rust sample collected from boiler steam drum inside.
2*65 MW CPP UNIT

Document Ref No. Services - GNAL Date of Issue:


INS/FY-22-23/041022 04.10.2022
Boiler Steam Drum Inspection Report

Prepared By Checked By

WTP In-charge Operation Manager

Om Prakash Meena

You might also like