You are on page 1of 2

SHELADIA In ZARIMA-MAY TSEBRI -SHIRE ROAD ERA Own Force

association PROJECT Construction


with EIE &HITCON Contract no. 2 Division

SIEVE ANALYSIS AASHTO T-27


Date of Sampling Sample No
Date Of Testing Mat. type Natural Sub base mat.
Location NMC
Source Depth :

Specification
Test Sieve Size Weight Weight Percent limit
(mm) Retained Passing Passing Upper Lower
limit limit
63
50
37.5
20
5
1.18
0.3
0.075
Pan

Sieve analysis
12
10
8
% Pass

6
4
2
0
0 2 4 6 8 10 12
Sieve size in mm

Remark ______________________________________________________________

CONTRACTOR: CONSULTANT
TESTED BY CHAKED BY CHAKED BY APPROVED BY
DATE DATE DATE DATE
SIGN SIGN SIGN SIGN

You might also like