You are on page 1of 2

QUIPPO OIL & GAS INFRASTRUCTURE LIMITED

DAILY CRITICAL SAFETY EQUIPMENT CHECKLIST


(TO BE CHECKED DAILY OR OTHERWISE MENTIONED IN THE BEGINNING OF THE WORKING DAY)

Rig ………………………………. Location…………………………. Date: ……………………

Equipment Performance Requirement Condition Remarks


Fall Responsible:
1. Availability Yes / NO
Prevention
2. Condition OK/ Not OK Driller in shift & Top man
Device
1. Seat Condition
OK/ Not OK
2. Hand Brake
OK/ Not OK
3. Condition of anchoring
Responsible:
rope OK/ Not OK
Top man’s
4. Condition of Guide Driller in shift & Top man.
Escape OK/ Not OK
Rope
devise OK/ Not OK To check the running condition by
5. Pulley Condition
OK/ Not OK Top man every day.
6. Condition of anchor
OK/ Not OK
7. Cushion
(Sand/Mechanical)
Responsible:
1. Functioning OK/ Not OK
Twin stop 2. Play of Cam OK/ Not OK Driller in shift
Device 3. Cover fitted Yes/No To check at the beginning of every
4. Chain slackness OK/ Not OK shift
Top man’s Responsible:
1. Availability Yes/No
Full Body
2. Condition OK/ Not OK Top man/HSE
Harness
1. Functioning OK/ Not OK Pump to start immediately and
2. Condition OK/ Not OK develop a pressure of 7Kg/cm2.
3. Battery OK/ Not OK Daily run for five minutes and 30
Fire Pump minutes twice a month an idle
condition.
Responsible: Chief Mechanic
Fire Water
1. Water Level OK/ Not OK
Tank Ring Responsible: Chief Mechanic
2. Charged Yes/No
line
Aviation
Functioning OK/ Not OK Responsible: Chief Electrician
Light
Function Test:
All maintenance and checks as per
BOP As per OISD & OMR OK/ Not OK OISD RP 174
guideline Responsible: Driller in shift
1. Required pressure is OK/ Not OK
BOP Control maintained.
2. Hyd. Fluid level OK/ Not OK Responsible: Driller in shift
Unit
3. Both electrical and OK/ Not OK
Mech. Means of power

QOGIL/HSE/FOR/04 Issue No.01 dt. 12.06.21 Rev. No. 0 dt. -


QUIPPO OIL & GAS INFRASTRUCTURE LIMITED

supply is available.
4. Functioning of
hydroelectric switch OK/ Not OK
(Auto cut-off)
1. Air supply (120 psi) OK/ Not OK
BOP Remote
2. Lamps OK/ Not OK Responsible: Driller in Shift
panel
3. Pressure Gauges OK/ Not OK
1. Rating OK/ Not OK
2. Choke valve- OK/ Not OK
Choke (remote/manual)-As
Responsible: Driller in shift / AD
Manifold OISD-RP 174
3. Connected with remote OK/ Not OK
choke panel
1. Available OK/ Not OK
FOSV Responsible: Driller in shift
2. Operating Condition OK/ Not OK

Parking 1. Available OK/ Not OK Responsible:


Brake 2. Operation condition OK/ Not OK
Driller in shift /Rig-bldg. crew

1. Available Yes/No
Working Responsible: Driller in shift / Rig-
2. Condition OK/ Not OK
Brake bldg. crew

Emergency 1. Available Yes/No Responsible: Driller in shift / Rig-


Brake 2. Condition OK/ Not OK bldg. crew

1. Available Yes/No Responsible: Driller in shift/ Chief


Fire Alarm 2. Condition OK/ Not OK Electrician

1. Available Yes/No Responsible: Driller in shift / Chief


H2S Alarm 2. Condition OK/ Not OK Electrician

1. Available Yes/No
2. Condition OK/ Not OK Responsible:
Ambulance
3. F/A box with medicine Yes/No Medic / HSE / Tool Pusher
4. Stretcher Yes/No

Eye Wash & Yes/No


1. Available
Emergency OK/ Not OK Responsible: Medic / HSE
2. Condition
Shower

Signature:

HSE MEDIC DRILLER

CHIEF MECHANIC CHIEF ELECTRICIAN TOOL PUSHER

QOGIL/HSE/FOR/04 Issue No.01 dt. 12.06.21 Rev. No. 0 dt. -

You might also like