1 DESIGN CRITERIA
2 GEOMETRY
3 ANALYSIS INPUT
4 ANALYSIS RESULT
5 SUMMARY
Content
Location : IMB_PAK AGUS
Site ID. :-
DESIGN CRITERIA
Site ID : -
Site Name : IMB_PAK AGUS
DESIGN CRITERIA
Concrete Structure
- American Standard ACI318-02
- Indonesian Standard SNI 03-2847-2002
- Peraturan Beton Indonesia (SKSNI Beton-1993)
Steel Structure
- American Standard ACI318-02
- Indonesian Standard SNI 03-1729-2002
- Peraturan Perencanaan Bangunan Baja Indonesia (PPBBI-1983)
2. Reinforcement steel
- Plain bars : U24 (fy = 240 Mpa, Ø < 10 mm)
- Deformed bard : U39 (fy = 3900 Mpa, Ø > 12 mm)
4. Welding
E70XX (tensile strength 70 ksi)
5. Anchor
ASTM A-36 / JIS3101
D. LOADING
The following definitions give the meaning of certain terms used in the structural analysis and design :
Concrete 24 kN/m3
Wall + Cladding 2.50 kN/m2
Loading on Floor Slab
Floortileper, have 1 cm 0.24 kN/m2
ME instalation 0.25 kN/m2
Eternite & roof equipments 0.20 kN/m2
Total Dead Loads floor slab 0.69 kN/m2
Loading on Rooftop
Rooftop 0.16 kN/m
Gording 0.04 kN/m
Bracing 0.02 kN/m
Total Dead Loads on rooftop 0.22 kN/m
Input ETABS 0.22 kN/m
3. Combination Load
a. 1.4 DL
b. 1.2 DL + 1.6 LL
Location : IMB_PAK AGUS
Site ID. :-
GEOMETRY
ETABS
Site ID. :-
ANALYSIS INPUT
Site : IMB_Pak Agus
ID : -
ANALYSIS INPUT
M A T E R I A L L I S T B Y E L E M E N T T Y P E
M A T E R I A L L I S T B Y S E C T I O N
M A T E R I A L L I S T B Y S T O R Y
M A T E R I A L P R O P E R T Y D A T A
M A T E R I A L P R O P E R T Y M A S S A N D W E I G H T
M A T E R I A L D E S I G N D A T A F O R S T E E L M A T E R I A L S
M A T E R I A L D E S I G N D A T A F O R C O N C R E T E M A T E R I A L S
F R A M E S E C T I O N P R O P E R T Y D A T A
F R A M E S E C T I O N P R O P E R T Y D A T A
F R A M E S E C T I O N P R O P E R T Y D A T A
F R A M E S E C T I O N P R O P E R T Y D A T A
F R A M E S E C T I O N W E I G H T S A N D M A S S E S
TOTAL TOTAL
FRAME SECTION NAME WEIGHT MASS
C O N C R E T E C O L U M N D A T A
C O N C R E T E B E A M D A T A
TOP BOT TOP LEFT TOP RIGHT BOT LEFT BOT RIGHT
FRAME SECTION NAME COVER COVER AREA AREA AREA AREA
S T A T I C L O A D C A S E S
L O A D I N G C O M B I N A T I O N S
F R A M E S E C T I O N A S S I G N M E N T S T O L I N E O B J E C T S
D I S T R I B U T E D L O A D A S S I G N M E N T S T O L I N E O B J E C T S
U N I F O R M L O A D A S S I G N M E N T S T O A R E A O B J E C T S
Site ID. :-
ANALYSIS RESULT
ETABS
Site ID. :-
BAHAN STRUKTUR
Kuat tekan beton, fc' = 14.53 MPa
Tegangan leleh baja (deform) untuk tulangan lentur, fy = 390 MPa
Tegangan leleh baja (polos) untuk tulangan geser, fy = 240 MPa
DIMENSI BALOK
Lebar balok b = 200 mm
Tinggi balok h = 500 mm
Diameter tulangan yang digunakan (assumsi), D = 13 mm
Diameter sengkang (polos) yang digunakan, P= 8 mm
Tebal bersih selimut beton, ts = 25 mm
MOMEN DAN GAYA GESER OUTPUT ETABS
+
Momen positif , Mu = 34.508 kNm
-
Momen negatif , Mu = 39.909 kNm
PERHITUNGAN TULANGAN
+
Momen positif nominal rencana, Mn = Mu / f = 43.135 kNm
Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 40 mm
Tinggi efektif balok, d = h - d' = 460.50 mm
6 2
Faktor tahanan momen, Rn = Mn * 10 / ( b * d ) = 1.0170
Rn < Rmax
Digunakan tulangan, 3 D 13
2 2
Luas tulangan terpakai, As = n * p / 4 * D = 398 mm
1 3 39.50 118.50
2 0 0.00 0.00
3 0 0.00 0.00
n= 3 S [ ni * yi ] = 118.5
Letak titik berat tulangan, d' = S [ ni * yi ] / n = 39.50 mm
39.50 < 40
Tinggi efektif balok, d = h - d' = 460.50 mm
a = As * fy / ( 0.85 * fc' * b ) = 62.871 mm
-6
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10 = 66.632 kNm
Tahanan momen balok, f * Mn = 53.306 kNm
+
Momen rencana positif setelah penambahan loading, Mu = 34.508 kNm
f * Mn > Mu
+
OK
2. MOMEN NEGATIF
-
Momen negatif nominal rencana, Mn = Mu / f = 49.886 kNm
Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 40 mm
Tinggi efektif balok, d = h - d' = 460.50 mm
6 2
Faktor tahanan momen, Rn = Mn * 10 / ( b * d ) = 1.1762
Rn < Rmax
Digunakan tulangan, 3 D 13
2 2
Luas tulangan terpakai, As = n * p / 4 * D = 398 mm
1 3 39.50 119
2 0 0.00 0.00
3 0 0.00 0.00
n= 3 S [ ni * yi ] = 119
Letak titik berat tulangan, d' = S [ ni * yi ] / n = 39.50 mm
39.50 < 40
Tinggi efektif balok, d = h - d' = 460.5 mm
a = As * fy / ( 0.85 * fc' * b ) = 62.871 mm
-6
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10 = 66.632 kNm
Tahanan momen balok, f * Mn = 53.306 kNm
-
Momen rencana negatif setelah penambahan loading, Mu = 39.909 kNm
f * Mn > Mu
+
OK
3. TULANGAN GESER
Site ID. :-
BAHAN STRUKTUR
Kuat tekan beton, fc' = 14.53 MPa
Tegangan leleh baja (deform) untuk tulangan lentur, fy = 390 MPa
Tegangan leleh baja (polos) untuk tulangan geser, fy = 240 MPa
DIMENSI BALOK
Lebar balok b = 200 mm
Tinggi balok h = 300 mm
Diameter tulangan yang digunakan (assumsi), D = 13 mm
Diameter sengkang (polos) yang digunakan, P= 8 mm
Tebal bersih selimut beton, ts = 25 mm
MOMEN DAN GAYA GESER OUTPUT ETABS
+
Momen positif , Mu = 8.558 kNm
-
Momen negatif , Mu = 13.013 kNm
PERHITUNGAN TULANGAN
+
Momen positif nominal rencana, Mn = Mu / f = 10.698 kNm
Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 40 mm
Tinggi efektif balok, d = h - d' = 260.50 mm
6 2
Faktor tahanan momen, Rn = Mn * 10 / ( b * d ) = 0.7882
Rn < Rmax
Digunakan tulangan, 2 D 13
2 2
Luas tulangan terpakai, As = n * p / 4 * D = 265 mm
1 2 39.50 79.00
2 0 0.00 0.00
3 0 0.00 0.00
n= 2 S [ ni * yi ] = 79
Letak titik berat tulangan, d' = S [ ni * yi ] / n = 39.50 mm
39.50 < 40
Tinggi efektif balok, d = h - d' = 260.50 mm
a = As * fy / ( 0.85 * fc' * b ) = 41.914 mm
-6
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10 = 24.800 kNm
Tahanan momen balok, f * Mn = 19.840 kNm
+
Momen rencana positif setelah penambahan loading, Mu = 8.558 kNm
f * Mn > Mu
+
OK
2. MOMEN NEGATIF
-
Momen negatif nominal rencana, Mn = Mu / f = 16.266 kNm
Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 40 mm
Tinggi efektif balok, d = h - d' = 260.50 mm
6 2
Faktor tahanan momen, Rn = Mn * 10 / ( b * d ) = 1.1985
Rn < Rmax
Digunakan tulangan, 2 D 13
2 2
Luas tulangan terpakai, As = n * p / 4 * D = 265 mm
1 2 39.50 79
2 0 0.00 0.00
3 0 0.00 0.00
n= 2 S [ ni * yi ] = 79
Letak titik berat tulangan, d' = S [ ni * yi ] / n = 39.50 mm
39.50 < 40
Tinggi efektif balok, d = h - d' = 260.5 mm
a = As * fy / ( 0.85 * fc' * b ) = 41.914 mm
-6
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10 = 24.800 kNm
Tahanan momen balok, f * Mn = 19.840 kNm
-
Momen rencana negatif setelah penambahan loading, Mu = 13.013 kNm
f * Mn > Mu
+
OK
3. TULANGAN GESER
Site ID. :-
BAHAN STRUKTUR
Kuat tekan beton, fc' = 14.53 MPa
Tegangan leleh baja (deform) untuk tulangan lentur, fy = 240 MPa
Tegangan leleh baja (polos) untuk tulangan geser, fy = 240 MPa
DIMENSI BALOK
Lebar balok b = 100 mm
Tinggi balok h = 150 mm
Diameter tulangan yang digunakan (assumsi), D = 12 mm
Diameter sengkang (polos) yang digunakan, P= 8 mm
Tebal bersih selimut beton, ts = 25 mm
MOMEN DAN GAYA GESER OUTPUT ETABS
+
Momen positif , Mu = 0.852 kNm
-
Momen negatif , Mu = 2.654 kNm
PERHITUNGAN TULANGAN
+
Momen positif nominal rencana, Mn = Mu / f = 1.065 kNm
Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 39 mm
Tinggi efektif balok, d = h - d' = 111.00 mm
6 2
Faktor tahanan momen, Rn = Mn * 10 / ( b * d ) = 0.8644
Rn < Rmax
Digunakan tulangan, 2 D 12
2 2
Luas tulangan terpakai, As = n * p / 4 * D = 226 mm
1 2 39.00 78.00
2 0 0.00 0.00
3 0 0.00 0.00
n= 2 S [ ni * yi ] = 78
Letak titik berat tulangan, d' = S [ ni * yi ] / n = 39.00 mm
39.00 < 39
Tinggi efektif balok, d = h - d' = 111.00 mm
a = As * fy / ( 0.85 * fc' * b ) = 43.955 mm
-6
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10 = 4.833 kNm
Tahanan momen balok, f * Mn = 3.866 kNm
+
Momen rencana positif setelah penambahan loading, Mu = 0.852 kNm
f * Mn > Mu
+
OK
2. MOMEN NEGATIF
-
Momen negatif nominal rencana, Mn = Mu / f = 3.318 kNm
Diperkirakan jarak pusat tulangan lentur ke sisi beton, d' = 39 mm
Tinggi efektif balok, d = h - d' = 111.00 mm
6 2
Faktor tahanan momen, Rn = Mn * 10 / ( b * d ) = 2.6926
Rn < Rmax
Digunakan tulangan, 2 D 12
2 2
Luas tulangan terpakai, As = n * p / 4 * D = 226 mm
1 2 39.00 78
2 0 0.00 0.00
3 0 0.00 0.00
n= 2 S [ ni * yi ] = 78
Letak titik berat tulangan, d' = S [ ni * yi ] / n = 39.00 mm
39.00 < 39
Tinggi efektif balok, d = h - d' = 111.0 mm
a = As * fy / ( 0.85 * fc' * b ) = 43.955 mm
-6
Momen nominal, Mn = As * fy * ( d - a / 2 ) * 10 = 4.833 kNm
Tahanan momen balok, f * Mn = 3.866 kNm
-
Momen rencana negatif setelah penambahan loading, Mu = 2.654 kNm
f * Mn > Mu
+
OK
3. TULANGAN GESER
Site ID. :-
LONGITUDINAL BAR(s)
Pu = 196.45 kN ( from ETABS analysis result )
= 1.965E+05 N
Mu = 15.187 kN-m ( from ETABS analysis result )
= 1.519E+07 N-mm
e = 77.3 mm
f'c = 18.675 Mpa (new design use K225)
fy = 390 Mpa
fys = 240 Mpa
b = 300 mm
h = 300 mm
c = 30 mm
d = h - c - Ø2 - (Ø1/2) mm
= 255.5 mm
d' = c + Ø2 + (Ø1/2) mm
= 44.5 mm
z = d - a/2 mm
D1 = 13 mm
Ø2 = 8 mm
= 0.85
ØPnb Pu Q R Pn ØPn
Remark
kN kN kN kN kN kN
407.42 196.45 723.69 748.39 1472.08 956.85 OK
Conclusion :
Use reinforcement 8 D13, are SAVE.
CROSS BAR(s)
Lo
h1 or h2 1/6Ln 18 in
300 491.6666667 457.2
Plastic end
Diameter S1 S2 S3
mm mm mm mm
8 75 104 117
S1 = 16*Ø1
S2 = 48*Ø2
S3 = smallest side of column
Diameter S1 S2 S3
mm mm mm mm
8 208 384 300
Conclusion : .
For middle span : Use crossbar Ø 8 -150, are SAVE.
For plastic end : Use crossbar Ø8 -150, are SAVE.
Location :
Site ID. :-
LONGITUDINAL BAR(s)
Pu = 10.1 kN ( from ETABS analysis result )
= 1.010E+04 N
Mu = 3.206 kN-m ( from ETABS analysis result )
= 3.206E+06 N-mm
e = 317.4 mm
f'c = 18.675 Mpa (new design use K225)
fy = 390 Mpa
fys = 240 Mpa
b = 200 mm
h = 200 mm
c = 25 mm
d = h - c - Ø2 - (Ø1/2) mm
= 160.5 mm
d' = c + Ø2 + (Ø1/2) mm
= 39.5 mm
z = d - a/2 mm
D1 = 13 mm
Ø2 = 8 mm
= 0.85
ØPnb Pu Q R Pn ØPn
Remark
kN kN kN kN kN kN
153.04 10.1 100.37 87.13 187.50 121.88 OK
Conclusion :
Use reinforcement 4 D13, are SAVE.
CROSS BAR(s)
Lo
h1 or h2 1/6Ln 18 in
200 491.6666667 457.2
Plastic end
Diameter S1 S2 S3
mm mm mm mm
8 50 104 150
S1 = 16*Ø1
S2 = 48*Ø2
S3 = smallest side of column
Diameter S1 S2 S3
mm mm mm mm
8 208 384 200
Conclusion : .
For middle span : Use crossbar Ø 8 -150, are SAVE.
For plastic end : Use crossbar Ø8 -150, are SAVE.
Location :
Tabel 1. Momen Pelat Pers
atau terjepit elastis
Site ID. :- Momen Pelat persegi akibat be
Nilai
Kondisi Pelat
A. DATA BAHAN STRUKTUR Momen Pe
Tumpuan x Ctx = 89
Mtx = - 0.001
Tumpuan y Cty = 74 Mlx = 0.001
Tabel 2 dengan 3 sisi terjepit Mly = 0.001
Mty = - 0.001
Mtx = - 0.001
Mlx = 0.001
Diameter tulangan yang digunakan, Æ= 10 mm Mly = 0.001
Tebal bersih selimut beton, ts = 15 mm Mty = - 0.001
D. PENULANGAN PLAT
Site ID. :-
SUMMARY
Site : IMB_Pak Agus
ID : -
SUMMARY ANALYSIS
Beam Design
Top Bottom Stirup
In Plastic In Middle
Story Section M act. (+) (kN-m) M act. (-) (kN-m) Rebar Rebar
Joint Rebar Span Rebar
Column Design
Max of As
D-Rebar As-Rebar n-Rebar Stirup
Slab Design
Middle span Middle span Plastic span Plastic span
Thick Floor
Mlx (kNm/m) Mly (kNm/m) Mtx (kNm/m) Mty (kNm/m) reinforcement reinforcement reinforcement reinforcement
(mm)
axis X axis Y axis X axis Y
Slab 120 mm 3.367 2.642 4.610 3.833 Ø10-200 mm Ø10-200 mm Ø10-200 mm Ø10-200 mm