You are on page 1of 1

Safety Incident Report

Fauji Fresh n Freeze Limited

Doc # QR/HSE/005 Revision # 00


Spark observed in pea podder emergency switch cable
Date: 11/2/2021 Time: 1750 hrs.
Area: Pea podder
Potential: Fire
Incident reported Timely
Investigation team: Raza Waseem, Muhammad Amin
Akhtar Javed
Responsibility: Production/E&I
Narrative/ Description:
On above date & time, washing labor person(Usman) observed sparking at pea-podder emergency
switch cable during washing activities at area, so he informed process operator and after check burnt
cable was observed.
Immediately after incident reporting main breaker was turned off and E&I technician was informed
and he disconnected terminals. Later on cable was replaced

Findings:
1) Sharp edge/ corner of cable tray damaged insulation of cable

Basic Cause:
1) Sharp edge

Recommendations: Responsibility Target date

1) Visual inspection of all cables in pea podder area


should be carried out M. Tariq Immediate

2) Sharp edges on cables trays should be removed after


Tanveer Ahmad 25-Feb-21
identification form area owner and E&I

3) This incident should be discussed with all All Area owners 10-Mar-21

HSE Section - FFFL