Professional Documents
Culture Documents
5-
PROCEDURE FOR 8900-2007-F1
TRANSFER AND POSTINGS Rev. No. 0
Page 1 of 2
CLEARANCE CERTIFICATE
NAME : SUSIL KU. NAYAK
EMP NO. : 43BA
DESIGNATION : OFFICER GR.V (SAFETY)
DEPARTMENT : CONTRUCTION
DATE OF TRANSFER/ RESIGNATION/ RETIREMENT/ VRS : 25-01-2023
PART –I
On being released on transfer/ resignation/ retirement/ VRS via E-mail dated 17-JAN-2023, I, hereby hand over the
charge pertaining to my work at DHPL- BALASORE GAIL CAMP Office to Shri. KHURSHID ANWAR E. No.
Designation OFFICER GR.IV (SAFETY) and hereby hand over all the documents, files, records etc. to him. (List attached,
Annexure-1).
PART – II
Status of metal stamp issued to the employees to be checked from List of Welding/NDT Engineer and List of personnel other
than Welding/NDT with metal stamp available online on construction portal as per Doc no: LL-1943-0004 & LL-1943-0005.
If yes, copy of clearance certificate along with metal stamp to be sent to Divisional QA Manager for updating of records at HO.
(DEPARTMENTAL HEAD)
PART - III
(DEPARTMENTAL HEAD
PART – IV
(Clearance from other departments)
I. Technical Library
All non-consumable items issued to the employee have been returned, excepting the following items, if any.
IV. HR Department
He/ She has submitted Leave application and filled Time sheets upto the date of his/ her release. Identify card
has/ has not been surrendered.
V. F&A Department
Certified that nothing is due from the employee – discrepancy, if any to be mentioned.
Forwarded for making final payment after adjusting dues, if any; according to the records and in line with the details
mentioned in this Clearance Certificate.
(DEPARTMENTAL HEAD)
DISTRIBUTION