You are on page 1of 2

AUTHORIZED VEHICLE REQUEST

DOCUMENT: ASB1-CEEC-HSE-FO-020-00

AL-SHUAIBAH SOLAR PV IPP - KSA

PART I. COMPANY DATA


Name
Subcontractor Subcontractor Subcontractor
Contractor
1 Tier
st
2 Tier
nd
3st Tier
Person in Charge On Site
Name Contact no.
Description of Works

Date and Signature Comments

PART II. H&S CONTROL


Name:

Date and Signature Comments

PART III. CONTROL SECURITY


Trainer Name:
Date and Signature Comments

PART IV. INSTRUCTIONS


1.- This form must be delivered to the H&S department at the start of works by each company that requests authorisation to
have vehicles.
2.- The required documents for each vehicle must be attached to this form, including the corresponding use authorizations and
driving licences.
3.-Fields highlighted in pink must be filled in by the H&S Department after reviewing the documents corresponding to each
vehicle.
4.- It must be delivered together with the corresponding parking badges and authorisation stickers that allow them to drive
around the worksite.
5.- Access Control shall sign the original documents and keep a copy.
6.- If a company for which vehicles have already been authorised wishes to have more vehicles authorised, it must only fill in
and sign table V of this form.
7.- Once this form is duly filled in, it must be filed in the H&S archives.
Document: ASB1-CEEC-HSE-FO-020-00

Page 1 of 2
AUTHORIZED VEHICLE REGISTER
DOCUMENT: ASB-CEEC-HSE-FO-020-00

AL-SHUAIBAH SOLAR PV IPP - KSA

TABLE V - VEHICLE DATA


DRIVER DATA
Vehicle Access Badge Personal Access Badge
TYPE OF VEHICLE ID NO. SIGNATURE
Surnames and name IQAMA/Passport No. No.

GENERAL REMARKS:

Document: ASB-CEEC-HSE-FO-020-00

Page 2 of 2

You might also like