A - PROCEED / ACCEPTED

B - PROCEED AS NOTED, CHANGE AS


NOTED AND RESUBMIT
NOTES TO CONTRACTOR:
(1) Notification to proceed or receipt of information does C - DO NOT PROCEED, CHANGE AS
not constitute acceptance nor relieve Contractor of any NOTED AND RESUBMIT
liability. Acceptance is accomplished under the terms of
the Contract/Purchase Order.
(2) Changes or additions to any document must be D - INFORMATION ONLY, RECEIPT
reflected in its revision block by an appropriated revision ACKNOWLEDGED
indication.
(3) If the data being resubmitted by the Employer’s
Representative supersedes previously submitted data, Q – QUALITY IS BELOW STANDARDS,
indication of the replaced document number must CORRECT AND RESUBMIT
appear in or near the revision block or on the
Transmittal.
Contractor Ref: NSH-MAADEN-WPF-WPS-18-P3 Rev: Date Received:
Doc Title: WELDING PROCEDURE SPECIFICATION - NSH-MAADEN-WPF-WPS-18-P3 00 14-Sep-2013
Reviewed by: B – PROCEED, CHANGE AS NOTED ® Employer Document No:
AND RESUBMIT
Authorization to proceed does not relieve Contractor/Supplier of its MD-402-K023-IK-Q10-00022
responsibility or liability under the Contract and or Purchase Order.
By Matthew Cox (Matthew.cox@fluor.com) on Sep 23, 2013
Date: Revision 01
CWP:
9mm max. See 25.94mm See
QW- 404.30 QW-404.30
(4.5mm deposit on (12.97mm x 2t)
PQR)