You are on page 1of 2

RMIT University @ 2015 School of Electrical and Computer Engineering

Protection nqineerinq
Tutorial 3 Solutions
Problem 1
l.
The B12 relay settings are selected accordir,g to the follou,ing practical guidelines.
Zone I reach: 80% of line l-2 distance: instantaneous operation (minimum delay).
Zone 2 reach: 120% of line 1-2 distance; delay 1 (typical): 0.3 s.
Zone 3 r'each: 100% of line 1-2 plLrs 120% of line 2-3; delay 2 (typical): 1 s

The positive seqllence impedances for the lines are (


Line 1 -2 Z't: 70 (0.06 + j0.6) - 4.2 + j42 O Z 'g
r
l.ine 2-3 Z'2 4.8 +.i48 fl /
Line 3-4 Z'3= 5.4 + j54 Q :..'; ' /
The primary Iine impedance is Z' : V'1s/I'y
The impedance seen by relal,s through CT-s and VT-s is
Z: (V'1,N/5000)/(I'r. x 5/1500) :0.06 Z'
The relay reach settings are:
Z,o,,et: 0.8 x 0.06 x (4.2 + j42):0.2 + j2 A
Z,o,rez: 1.2 x 0.06 x (4.2 + j42) :0.3 + j3 f)
Zron"\ x (4.2 + j42 + l.2x 0.06x(4.8+j48) :0 6+j6f)

The settings for B23 are calculated the same way as above.

Line impedance
ImZ r -- locus
(12)

(!wP
S/.* k

TRIP after
Instantaneous delay 1
TRIP

0 0. ReZ
(o)
Fig. I Trip (polar) characteristics of relay B12

Dr P. Graszkiewicz Page'. l/2


RMIT University @ 2015 School of Electrical and Computer Engineering

)
During emergency loading

v'r-N : (500 x 103 / {r) Zo|:zss.l x to3 Zo|v "*)'J#


I'r-: 1400 1-cos-l61.91 A \,
Z'txt- V'rx/ I't,:206 Ao;|10.01
Z- T, 125, E+

Zr:rt:0.06 x Z1ruL :12.4 225.8" o" * 'a{


r'' .
Z,nnc a:!(0.6' +6') : 6.03 O < Zrx,t: 12.4 O.

On the lies outside the tri for Zone 3 (see the figure above). The

Problem 2

5x1
Ii = :151.9 A
20x103 x".6 x 0.95

Select a CT ratio of 200 :5

Ir+ 1,,:151.9r+=3.8A, :,
200
I xl)}o/o<7yo
: -!L 1,,, <3.8x0.07 =0.266A
r, .v. I.-r I:ilt
=
Frorn Fig.3 1 Vu, < 20 V
-7 t -7 V,,, 20 .
" l. 3.8-0.266
2b,u.,,t",:5.66 _ O.rrt = 5.54

Maxirnurn nurnber of relays ,: : r,


l#l

Dr P. Graszkiewicz Page:2/2