SITE 1 + SITE 2

GVB BUILDERS
STATION TO STATION REMARKS SIDE
START: STA. 347+420
1100.4 - 1114 MAJOR SCALING RNR 3 SPAN LEFT
1292.3 - 1303 MINOR SCALING LEFT
1307.8 POCK MARKS RIGHT
1366.5 RNR BOTH
1379.2 SEALANT WEAKENING POINT LEFT
1454.6 RNR LEFT
1485.7 2/3 LEFT
1493.2 RNR LEFT
1504.3 RNR LEFT
1510.5 RNR LEFT
1519.4 RNR LEFT
1649.1 RNR LEFT
1780.2 RNR LEFT
1795.3 RNR EDGE CRACK 1 SPAN RIGHT

END OF MEASUREMENT (WHEEL METER) RECORDED:1797.2meters


START: STA. 349+340
61 RNR RIGHT
84.9 2/3 RIGHT
105.1 RNR LEFT
106.7 2/3 RIGHT
109.4 - 118.4 RNR 2 SPAN RIGHT
120.6 2/3 RIGHT
125.7 2/3 RIGHT
129.1 SPIDER CRACK - RNR RIGHT
145.7 RNR LEFT
236 RNR LEFT
259.7 - 263.8 POCK MARKS RIGHT
352.4 RNR LEFT
376.5 - 388.7 MINOR SCALING RIGHT

Note: actual measurement recorded were measured by a wheel meter.


Note: To determine/locate actual site station (ie. Sta. 347+420 +112.8 = Sta. 347+532.8)