HYDRAULIC CALCULATION REPORT

Name of work :-
CONDUCTING GEOTECHNICAL INVESTIGATION (INCLUDING STATION
BUILDINGS), PREPARATION OF ESP OF STATIONS, DETAILED
STRUCTURAL DRAWINGS FOR STATION BUILDINGS, QUARTERS, GAD &
DETAILED DESIGN DRAWINGS OF MAJOR BRIDGES, MINOR BRIDGES,
ROBS & RUBS INCLUDING ITS APPROACHES, ETC. INCLUDING MARKING
OF CENTRE LINE OF PROPOSED ALIGNMENT, FIXING OF BOUNDARY
STONES ON BOTH SIDES OF ALIGNMENT AND AT JUNCTIONS OF ROW,
COUNTING OF TREE AND GIRTH MEASUREMENT, ETC. FROM CHAINAGE
KM 157 (EXCLUDING DIGRAS STATION) TO KM. 285.5 (EXCLUDING
NANDED STATION) IN CONNECTION WITH YAVATMAL-NANDED NEW
B.G. LINE PROJECT IN STATE OF MAHARASHTRA, INDIA

Bridge No.- 928/2

Client :-

RAIL VIKAS NIGAM LIMITED


(A GOVERNMENT OF INDIA ENTERPRISE)

Prepared By:

C. E. Testing Company Pvt. Limited


An ISO 9001, 14001 & OHSAS 18001 Cerified Company
NABL Accredited Laboratory
124A, N.S.C. Bose Road: Kolkata - 700 092
Hydraulic Calculation
of
Bridge No. 928/2
Hydrological calculaton
Bridge details:
A) Bridge No.: = 928/2
B) Chainage: = 170.870 km
C) Lowest Bed Level: = 374.108 m (From survey)
D) Formation Level: = 375.360 m (From project sheet)
E) Coordinates: = 770955.164,2211922.026
F) Prposed Openings: = 3 m
G) Hydrometerological Subzones: = 3(f) Lower Godavari
Improved Rational Formula
(Flood estimation method as per RDSO Report No. RBF-16):
A) Area of Catchment (A): = 0.0948 sq. Km
B) Distance from the critical point to the Outlet (L): = 0.427 km
C) RL of Farthest Point: = 436 m
D) Fall in level from the farthest point to the Outlet (H): = 45.0 m
E) Slope of stream, S: = 0.10539
F) Nature of soil: = Medium to deep clayey, black cotton soils

Flood Estimation:
3
50 years design flood discharge (m /s) = Q50 = 0.278 C I A
Where,
C= Runoff coefficient
50 year rainfall intensity (mm/h) lasting for tc hour duration
I=
where tc is the time of concentration
2
A= Catchment area in Km

STEP-1:- Calculation of Runoff Coefficient (C) :

0.2
Now, C= X (R F)

Value of "X" depends upon the soil type and location as given in Chart No 1

Chart No 1
Sl. No. Description of catchment Value of X
1 Sandy Soil/sandy loam/arid areas 0.249
2 Alluvium / silty loam / coastal areas 0.332

Red Soil / clayey loam / grey or brown alluvium /


3 0.415
cultivated plains / tall crops /wooded areas

Black cotton/ clayey soil / lightly covered / lightly


4 0.456
wooded / plain and barren / submontane and plateau

5 Hilly soils / plateau and barren 0.498

STEP-2:- Calculation of time of concentration (tc) :

3 0.345
tc = [ L / H ]
= [ 0.427^3 / 45 ]^ 0.345
= 0.111 h
= 7 min
STEP-3:- Calculation of areal reduction factor depending upon catchment
area and duration of rainfall (F) :

Value of F is calculated from the table given in RDSO Report RBF 16

Value of F
Catchment area Duration of rainfall
2
km < 30 mins 30 to 60 mins 60 to 100 mins
A < 2.5 0.72 0.81 0.88
2.5≤A≤5 0.71 0.8 0.87
5<A≤13 0.7 0.79 0.86
13<A<25 0.68 0.78 0.85
Note: Rainfall duration shall be equal to the calculated t c for the catchment

F= 0.72

STEP-4:- Calculation of 50 year 24 hour point rainfall (R) :


R= 220x1.15 mm as read from3f (lower Godawari) subzone (fig-3.6)
253 mm

And, For Black cotton/ clayey soil / lightly covered / lightly wooded / plain and barren /
submontane and plateau
X = 0.456

Therefore, C C = 0.456 x (25.3 x 0.72)^ 0.2


= 0.815

STEP-5:- Calculation of I :

From Fig. 2
The location of this bridge lies in sub-zone 3f of Hydrometerological Subzones of India

From Fig. 4
Thus, for curve corresponding to Zone 3
And,
For T = tc hrs = 0.111 h,
Ratio of 50 yrs tc hrs rainfall / 50 yrs 24 hrs rainfall = 0.075

For T = 1 h,
Ratio of 50 yrs 1 hr rainfall / 50 yrs 24 hrs rainfall = 0.38

Therefore, Ratio of 50 yrs tc hrs rainfall / 50 yrs 1 hr rainfall (K)= [ 0.075/0.38 ] = 0.197

Now, R50 24 hour rainfall = 253 mm (as in step 4)

So, R50 1 hour rainfall = [ 253 x 0.38 ]


= 96.14 mm

Now, R50 tc hour rainfall= K x R50 1 hour rainfall


= 18.94 mm

So, I = R50 (tc) / tc


= 18.94 / 0.111
= 170.631 mm/h

Hence, total discharge = Q50 = 0.278 C I A


= 0.278 x 0.815 x 170.631 x 0.0948
= 4 cumecs
Fixing of Bridge Length:

1) From Modified Rational Method:


Discharge Calculated: = 4.00 m3/s

3
Calculation of Regime width for discharge of 4.00 m /s
Pw=1.811 X C X Q^1/2 (As per cl No. 4.5.3 of IRS Substructure foundation code.)

Where, P= Wetted perimeter in meters which can be taken as the effective width of waterway

Q= Design discharge in m3/s


C= A Coefficient normally equal to 2.67
= 1.811 X 2.67 X 4^0.5 9.671 m
2) Bank to bank distance:
Bank to bank distance: = 2.642 m

From the above data and also considering the suitable abutment location and site condition,the proposed
bridge has been fixed as the details given below:
No. of Span = =1
Span Arrangement =1x3x2M _RCC box
Total Bridge length (dirt wall inner to inner) = 3.700 m
Let,
Width of side wall = 0.350 m

Width of Clear waterway, B'= 3.700-(0.350x2) = 3m


Rugosity coefficient, n= = 0.05
Slope, S = 0.1053864
2/3 1/2
Q50=(B'xd)x(1/n)x((B'xd)/(B'+2d)) x (S) = 4.00 m3/s
Depth of flow,d = = 0.428 m
LBL = = 374.056 m
Hence, Calculated HFL = = 374.484 m
Survey HFL = = 376.815 m
Take Survey HFL

2/3 1/2
Velocity = (1/n)x((B'xd)/(B'+2d)) x (S) = 3.119 m/s
Afflux and Maximum scour level calculations
HFL = 376.815 m ( From survey data)
LBL = 374.108 m ( From survey data)
Width of side wall = 0.350 m

Providing m Dia Pile


Span Arrangement =1x3x2M _RCC box
Total bridge length (dirt wall inner to inner) = 3.700 m

Clear linear water way Provided = 3.700-(0.350x2) =3 m

( As per cl. No. 4.5.6 of IRS Substructure Foundation Code )


3
Design discharge = 4.000 m /s
Considering Velocity = 3.119 m/s
3
Design Discharge for foundation(Qf) = 4 x 1.33 = 5.320 m /s
Design per linear m = qf = 1.77 cumec/m
Average Ksf (from soil report) = 2.580

(For Wardha at hivra site of Godavari Basin, GOVERNMENT OF INDIA CENTRAL


WATER COMMISSION)
Here, Width of waterway provided = 3.700 m
Lacey's Regime Width = 9.671 m
Width of waterway provided < Lacey's Regime Width
So, (Ref. Cl: 4.6.4 of IRS Substructure Foundation Code )
Normal Scour depth from HFL = 1.338 x (qf^2 / Ksf)^0.33 0.602 m

Scour Level: 376.815-0.602 = 377.000 m


Hence this level is above LBL, So Scour will not occur.

Calculation of afflux:
Discharge = 4.0 cumec
Velocity (V) = 3.119 m/s
2
Area (A) = 1.28 m
Total Linear Waterway = 3.7 m
Average Depth = 1.28/3.7 = 0.35 m
Clear Linear Waterway due to obstruction= 3 m
2
Area(a) = 1.05 m

As per Cl. No. 4.7.1 of IRS Substructure & Foundation Code

= (0.54+ 0.01524) x[(1.49)-1] = 0.272 m


(Considering HFL is including Afflux)
So, Afflux= 0m
77°35'20"E 77°35'25"E 77°35'30"E 77°35'35"E 77°35'40"E

CATCHMENT AREA FOR BRIDGE NO. 928/2

·
CATCHMENT AREA= 94765 Sqm.

19°59'25"N
19°59'25"N

19°59'20"N
19°59'20"N

Origin

19°59'15"N
19°59'15"N

Centroid

19°59'10"N
.
19°59'10"N

m
7
42
=
ce
ant
is
D

LEGEND

19°59'5"N
19°59'5"N

Bridge Location
Bridge No.- 928/2
Centroid
Origin
Catchment
Longest Stream
River
Proposed Railway
19°59'0"N

Elevation in metre
19°59'0"N

376 - 379
379 - 385
385 - 388
388 - 396
Longest Stream Length- 427 m.
396 - 404
404 - 413
413 - 418
418 - 422
19°58'55"N

422 - 427
19°58'55"N

427 - 432

0 25 50 100 150 200


M

77°35'20"E 77°35'25"E 77°35'30"E 77°35'35"E 77°35'40"E