ENGINEER’s RESPONSE

Project Construction of Mumbai-Ahmedabad High Speed Rail (MAHSR) Package P1B


Ref. No. MGCPL/SITE/HSR-PKG1B/2022-23/1973 Revision R5
Received
Title Submission of Compliance Report of ITP of Liner Plate Assembly for Shinso Pile 24-02-2023
on
Reviewed
Review Code Notice of No Objection with Comments (NONOC) 01-03-2023
on
Other Ref. COR-000003933

S. Drawing / Document
Observations / Comments
No No.
Given parameters of acceptance criteria of Mechanical and metallurgical test for Bolt are not According to
1 MGCPL/SITE/HSR- the reference documents (IS 1367 P-3, Property class 10.9) as mentioned in ITP
PKG1B/2022-23/1973
Note: Notwithstanding Engineer’s comments, responsibility of ensuring conformity to contractual, technical and functional requirements lies with the
Contractor. Any non-compliances on the part of the Contractor in the preparation, submission or resubmission of Contractor’s Documents shall not constitute
a Variation.
Kalyanasundaram Esravel Click or tap here to enter text.

_______________________________ ____________________________________

[Reviewed by] [Endorsed by]