Professional Documents
Culture Documents
Audit Title
Client / Site
Conducted on 02.03.2023
Location
Personnel
1/5
Powered by
1.Audit-76%
Audit 76%
1.1.siteinformation
site information
sqe
task activity
qe
date
Site number/Name
qe
name of contractor/Subcontractor
qe
1.2.checkapplicableanticipatedorpotentialhazards-66.67%
check applicable anticipated or potential 66.67%
hazards
Demolition Safe
2/5
Powered by
relevant to safety
List Yes
1.6.additionalPPE(minimumrequirement:safetyboots,hardhat,visi-vest,glasses,gloves)-100%
additional PPE ( minimum requirement:
safety boots, hard hat, visi-vest, glasses, 100%
gloves)
outside authorities
wf
02.03.2023 17:55 +03
1.8.disposalofdesignatedsubstances,surplus,orimpactedmaterials(disposaldetails,e.gwhen,where,how?)
disposal of designated substances, surplus,
or impacted materials (disposal details, e.g
4/5
Powered by
1.9.retailer/Salesassociate
retailer/Sales associate
prepared by
date
date
date
date
1.10.sitesupervisor
site supervisor
date
5/5