You are on page 1of 20

BoQ WI lines Rev.

0 4-Jul-2016 ROW (DD) Stinging (DD) welding (DD) Trenching Lowering backfilling Pre-comm Comm Flowline duration

Well Elev New flw Only Constr WELL


(msl) Comp.date Notes Crossing TB Crossing OC 30? 45? 60? 90? 45? for Goos Neck 2000 1000 300 200 1000 400 days days dd Hook-UP Tie-in Manifold
n well DGS mt List of wells (geomatic) 4th July 2016

Zb-099 and Zb-075 are connected together (WS+WI). Detach the line and
1 Zb-099 HM NCS 100 750846.913 3384441.591 2.067 m 12-Nov-16 tie-in Zb-099 and Zb-075 to NCS (in one common line). The "T" connection 0 0 0 0 0 2 2 Zb-099 1 1 1 1 1 1 3 3 14 1 1
would have valves for both direction: 099 and 075

2 Zb-075 HM NCS 0 747821.922 3384351.427 2.292 m existing In common (comingle) with above Zb-099 0 0 0 0 0 0 2 Zb-075 0 0 0 0 0 0 3 3 0 1 0
Oil Wells became W.I. (fed by Zb-247). The pipe route is the centerline of
3 Zb-094 (from Zb-247) HM NCS 2912 752012.161 3379264.730 2.5 m 12/17/2016 0 1 0 0 1 1 2 Zb-094 (fro 2 3 10 15 3 8 3 3 35 1 0.5
seismic NTS. There is a request to enlarg NTS
4 Zb-219 (WI-013) from Zb-278 HM UMCS 150 745540.018 3378601.437 1.992 m 12/17/2016 U/G Tee cold cut on Zb-278 JV flowline 0 0 0 0 0 1 2 Zb-219 (WI 1 1 1 1 1 1 3 3 14 1 0.5
Flowline built by JV - missing hook-ups (Well and UMCS). there is crossing
5 Zb-234 (WI-P15) from Zb-105 HM UMCS 3300 1/21/2017 of high-way (inside existing culvert) 1 4 0 0 0 4 2 Zb-234 (WI 2 4 11 17 4 9 3 3 38 1 0.5
754786.815 3376042.658 2.709 m
6 Zb-207 (WI-120S) ZM LMCS 0 755061.389 3369595.776 14.799 m existing Existing Flowlines, only hook-ups Well and LMCS 0 0 0 0 0 0 0 Zb-207 (WI 0 0 0 0 0 0 3 3 0 1 1
7 Zb-280 (WI-O23 Dir) from Zb-207 ZM LMCS 998 755902.928 3369581.663 12.511 m 2/25/2017 connection from Zb-207 0 0 0 0 0 3 2 Zb-280 (WI- 1 1 4 5 1 3 3 3 20 1 0.5
Existing line built by JV. Extension of line (Re-routing) and hook-ups(Well
8 Zb-272 (WI-AF15) HM NCS 132 743880.4549 3386199.5033 2.174 2/25/2017 and NCS) to be done 0 0 0 0 0 3 2 Zb-272 (WI- 1 1 1 1 1 1 3 3 14 1 1

It was N.U. Producer. To be surveyed to see dismantling of Hus and


9 Zb-082 HM SCS 170 753463.129 3363609.526 19.215 m 4/8/2017 Flowlines 0 0 0 0 0 0 2 Zb-082 1 1 1 1 1 1 3 3 14 1 1

10 Zb-297 (AL-35V) LMCS 4269 748999.288 3368209.050 4.597 m 2/28/2017 1 5 4 1 1 5 2 Zb-297 (AL- 3 5 15 22 5 11 3 3 45 1 1
11 AM-36_M LMCS 5319 749818.148 3367090.04 4/20/2017 1 6 2 1 2 7 2 AM-36_M 3 6 18 27 6 14 3 3 53 1 1
12 AH-21_3V NCS 7476 745592.000 3380276.000 5/28/2017 0 4 0 2 1 8 2 AH-21_3V 4 8 25 38 8 19 3 3 69 1 1
13 AH-19_3 NCS 4713 745805.845 3382198 5/31/2017 0 2 0 0 0 5 2 AH-19_3 3 5 16 24 5 12 3 3 48 1 1
14 AI-18_M NCS 3058 746621.845 3383570.46 5/31/2017 0 1 1 0 1 5 2 AI-18_M 2 4 11 16 4 8 3 3 36 1 1
15 AM-20_3 NCS 4045 749971.608 3381867.36 9/5/2017 0 1 0 0 1 5 2 AM-20_3 3 5 14 21 5 11 3 3 44 1 1
16 AQ-32_M LMCS 2769 753787.87 3370923.51 12/6/2017 0 2 1 0 2 2 2 AQ-32_M 2 3 10 14 3 7 3 3 33 1 1
17 AO-30_3 LMCS 2294 751979.447 3372443.61 12/12/2017 0 2 0 0 1 2 2 AO-30_3 2 3 8 12 3 6 3 3 30 1 1
18 AR-39_3 SCS 2545 754515.12 3365303.82 12/12/2017 0 7 4 3 2 0 2 AR-39_3 2 3 9 13 3 7 3 3 32 1 1
19 INJ-5_M (WI-AP24) UMCS 3291 751833.852 3378551.53 2/5/2018 1 1 1 2 1 1 2 INJ-5_M (W 2 4 11 17 4 9 3 3 38 1 1
20 INJ-7_M UMCS 5055 753036.67 3375740.81 2/21/2018 2 3 2 7 4 3 2 INJ-7_M 3 6 17 26 6 13 3 3 51 1 1
Corridor A 6 39 15 16 17 57 38 20 17
Corridor B

Well pad covered by NTS confirmed coordinates


Tot. New Flws #1500 10" (m) 52,596 tot. # new flowlines 18
Average 4,076 tot. # exist flowlines 2
Tot. New Flws #1500 10" (m) 2016 3,162
Tot. New Flws #1500 10" (m) 2017 41,088
Tot. New Flws #1500 10" (m) 2018 8,346

ROW (DD) Stinging (DD) welding (DD) Trenching Lowering backfilling Pre-comm Comm Flowline duration
Gas lines Only Constr launching and Tie-
Comp.date Notes Crossing TB Crossing OC 90? 60? 45? 30? 45? for Goos Neck 2000 1000 300 200 1000 400 days days dd in Receiving and Tie-in
n Pipeline DGS mt
12" Raw gas Pipeline from Hammar IPF to PPG - 1st IPF H
21 Line - Interconnecting pipelines PPG-IPF PPG 10,937 3 10 2 12" Raw gas 6 11 37 55 11 28 3 3 95 1 1

12" Raw gas Pipeline from Hammar IPF to PPG - 2nd IPF H
22 Line - Interconnecting pipelines PPG-IPF PPG 10,937 3 10 2 12" Raw gas 6 11 37 55 11 28 3 3 95 1 1

6 20
Tot. New Raw Gas Pipelines 12" (m) 21,874
BoQ Flowlines Rev.0 29-6-2016
DEV PO
DIRECT CHARGE
Description # Q.ty Spare Tot. MRF # 1 MRF # 2 MATERIAL STOCK FMED Balance (missing) Remarks
Up to Dec 2016 SITUATION PO
30-6-2016
10" Pipeline x 14.3mm L415Q Coated 3LPE mtr 52,596 5% 55,226 25,700 25705.76 (29520.04)
FOC (only length >1000m) mtr 52,596 5% 55,226 55,225.80 0 (55225.80) 9kms (FOC < 1km)
Splicing kit for FOC nr. 75 5% 79 79 cable 1x185 cable 3x185 349 270.00
11Kv Power cable (3 X) 1x185mm mtr 157,788 5% 165,677 165,677.40 55,225.80 0 (165677.40) HV cable 3x185 could be taken from SOC (ref.Aziz)
Splicing kit for 11Kv cable nr. 105 5% 111 supply by EPC 0 (111.00)
10" - 90◦ ELBOW 5D THK 15.9mm WPHY60 nr. 57 5% 60 2 2 (58.00)
10" - 60◦ ELBOW 5D THK 15.9mm WPHY60 nr. 17 5% 18 - (18.00)
10" - 45◦ ELBOW 5D THK 15.9mm WPHY60 nr. 16 5% 17 1 1 (16.00)
10" - 30◦ ELBOW 5D THK 15.9mm WPHY60 nr. 15 5% 16 16 16 0.00
10" - 45◦ ELB. 5D (bare, for "goosneck") nr. 38 5% 40 - (40.00)
10" WN Flange Thk.15.9mm #1500 RJ A694 F.60 (72E) nr. 40 5% 42 42 117 75.00 incl. Nos. 2 Flanges are under PO Sicim (Reconc.)
20 (14.00) With 20 IJ, will be completed a number of wells up to the WI wellheads AI-18
10" Insulating Joints nr. 32 5% 34 20 Only Insulating Joint 20.62mm (Flw completed date: 3 May 2017)

Extras (to be adapted to the Project)


MRF #1-2016 Sicim (Mat DEV)
MRF #2-2016 mat. From FMED that are arrived and under Inspection on 29/6/2016
Hold (to check with SoC - Aziz)
Zb-075 and Zb-099 (from NCS) - Conv from WSW to WI #1500
Scope of Work for the Connection of Zb-075 and Zb-099 to NCS (North Complex Satellite)
Vertex IGRS E IGRS N Elev. Total Length Remarks Heading Hot Bends The SoW include the following Activities:
1 748358.5 3384165 --- 1.3° -
2 748358.5 3384185 19.562 m 91.3° 90 1) Removal (by ZFOD) and replacement (by D&S) of the existing Wells Hook-up #900
materials with 1500# in order to connect the Well heads to the existing 6" flowline laid by
3 748379.6 3384185 40.661 m 1.3° 90 JV (replacement 6" flw from Zb-075 to Zb-099)
4 748379.6 3384244 99.302 m --- - Hot Bend Nos.
30° 2) Connect the existing 6" -1500# flowline to the North manifold with a new branchline
- 0 (100m). One spare connection at NCS should be available for manifold Tie-in
- 45° 0
- 60° 0 See Below Schema with D&S installation highlighted in red
- 90° 2
-
-
-
-
-
-
-
Zb-075 Hook- Zb-099 Hook-
Up #1500 Ex. 6" #1500 from Zb-075 to Zb-099 Up #1500

6"

8" =100m D&S SoW

Existing

IJ
NCS
Zb-094 (from Zb-247) - Conv from Oil to WI
Scope of Work for the Connection of well Zb-094 to well Zb-247
Vertex IGRS E IGRS N Elev. Total Length Remarks Heading Hot Bends
The SoW include the following Activities:
1 751005 3381699 --- Seismic NTS 245.6° -
2 750770 3381586 260.66 m Seismic NTS 155.6° 90 1) Dismantling existing Zb-094 (Oil well hook-up) by ZFOD Maint.
3 751098 3380906 1.015 km Seismic NTS 155.5° - 2) Installation of a New 10" Flow line #1500 (2,9 km) from Zb-247 to Zb-094
4 751894 3379258 2.845 km Seismic NTS 92.2° 60 Hot Bend Nos.
5 751961 3379257 2.912 km Seismic NTS --- - 30° 0 3) Provision of a 10" Tie-in point upstream of the water filter at Zb-247
- 45° 0 4) Install complete hook-up 10" #1500 WI at Zb-094
- 60° 1
- 90° 1 (HOLD) Tie-in at Zb-247 to be defined
-
-
-
-
-
-
-
Zb-219 (from Zb-278) - Conv from N.U. to WI
Scope of Work for the Connection of well Zb-219 to flow line Zb-278
Vertex IGRS E IGRS N Elev. Total Length Remarks Heading Hot Bends
The SoW include the following Activities:
1 745367.4 3378477 --- 56.4° -
2 745480.3 3378556 137.58 m 325.3° 90 1) Dismantling existing Zb-219 (NU) by ZFOD Maint.
3 745477.3 3378560 142.66 m 325.3° - 2) Installation of a New 10" line #1500 (150m) from U/G line Zb-278
4 745477.3 3378560 142.66 m --- - Hot Bend Nos.
- 30° 0 3) Install complete hook-up 10" #1500 WI at 219
- 45° 0 (HOLD) to verify the actual status of Zb-219 and the isolation from N.U. system
- 60° 0
- 90° 1
-
-
-
-
-
-
-
Zb-234 (from Zb-105) Conv from NU to WI
Vertex IGRS E Y Elevation Total Length Remarks Heading Hot Bends Scope of Work for the Connection of well Zb-234 to Zb-105
1 753030.6 3377613 --- 4.4° -
The SoW include the following Activities:
2 753031 3377619 6.741 m 89.5° 90
3 753993.1 3377650 969.02 m 181.9° 90 1) Dismantling existing Zb-234 (NU) by ZFOD Maint.
4 753991.5 3377502 1.117 km 92.4° 90 Hot Bend Nos.
2) Installation of a New 10" line #1500 (3.3km) between Zb-105 and Zb-234
5 754731.2 3377488 1.857 km 179.1° 90 30° 0
6 754737.3 3377333 2.012 km 179.2° - 45° 0 3) It has been found a concrete culvert crossing the high way. To verify the feasibility for
60° pipe's crossing inside the culvert instead of Thrust boring
7 754786.8 3376043 3.303 km --- - 0
- 90° 4 4) Install complete hook-up 10" #1500 WI at 234
-
(HOLD) to identify suitable tie-in point at Zb-105 (upstream of Well Hook-Up)
-
-
-
-
-
-
-
-
-
-
-
-
-
interconnecting line from Zb-207 to Zb-280
Vertex IGRS E Y Elevati Total Length Remarks Heading Hot Bends Scope of Work for the Connection of well Zb-207 and Zb-280
1 755140.2 3369608 --- 93.3° -
The SoW include the following Activities:
2 755813 3369585 672.92 m 1.4° 90
3 755813.1 3369666 753.41 m 91.5° 90 1) Hook-ups of both WI wells Zb-207 and Zb-280
4 755972.9 3369665 913.13 m 181.3° 90 Hot Bend Nos.
2) Installation of a 10" #1500 connection line (1 km) between the two wells hook-up s
5 755972.9 3369580 998.6 m --- - 30° 0
- 45° 0
60° (HOLD) Design of the off-take (tie-in point) at Zb-207 (upstream of WI filter )
- 0
- 90° 3
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Zb-272 (NCS)
Scope of Work for Zb-272
Vertex IGRS E IGRS N Elev. Total Length Remarks Heading Hot Bends
The SoW include the following Activities:
1 744014.1 3386162 --- 4.3° 90
2 744016.9 3386215 52.513 m 275.7° 90 1) Completion of the 120m of 10" existing line (built by JV).
3 743960.5 3386219 109.07 m 187.4° 90 2) Installation of 10" Hook-Up line #1500
4 743959 3386205 122.93 m 187.4° - Hot Bend Nos.
5 743959 3386205 122.93 m --- - 30° 0 3) Tie-in of existing 10" line at NCS
- 45° 0
- 60° 0
- 90° 3
-
-
-
-
-
-
-
Zb-082 (SCS) Conv from WSW
Scope of Work for Zb-272
Vertex IGRS E IGRS N Elev. Total Length Remarks Heading Hot Bends
The SoW include the following Activities:
1 753461.9 3363613 --- 346.9° -
2 753425.6 3363755 145.95 m 358.5° - 1) (hold) New Flowline from SCS to Zb-082 (170m)
3 753424.3 3363781 172.1 m --- - 2) New Well HU 10" #1500
- Hot Bend Nos.
- 30° 0 3) (hold) Tie-in to NCS
- 45° 0 HOLD - Site survey to check the status of existing U/G line (size?), Xmas Tree as well as Tie-in
- 60° 0 connection at SCS (existing connection as WSW)
- 90° 0
-
-
-
-
-
-
-
Zb-297 AL-35 (from LMCS)
Vertex IGRS E IGRS N Elev. Total Length Remarks Heading Hot Bends
1 751795.2 3370282 12.89 --- 2.0° -
2 751795.3 3370292 12.923 9.247 m 91.5° 90
3 751826.5 3370291 12.918 40.519 m 108.2° -
4 751872.6 3370278 12.903 88.579 m 184.1° 60 Hot Bend Nos.
5 751852.6 3369868 13.452 497.94 m 181.8° - 30° 4
6 751852 3369791 13.511 575.41 m 209.6° 30 45° 1
7 751491.4 3369120 13.117 1.337 km 295.2° 90 60° 1
8 751440.2 3369143 12.641 1.393 km 211.1° 90 90° 5
9 751335.6 3368960 11.219 1.603 km 250.2° 45
10 751246.2 3368925 10.437 1.699 km 283.3° 30
11 750957.3 3368986 9.238 1.994 km 269.5° -
12 750812.8 3368982 7.541 2.139 km 249.4° -
13 750529.3 3368868 6.325 2.444 km 254.2° -
14 749852.6 3368660 5.727 3.152 km 256.6° -
15 749705.1 3368621 4.809 3.305 km 240.7° -
16 749484.2 3368490 4.593 3.561 km 151.1° 90
17 749551.6 3368374 4.215 3.695 km 240.6° 90
18 749420 3368296 3.407 3.848 km 268.1° 30
19 749103 3368278 3.401 4.166 km 233.0° 30
20 749022 3368214 3.307 4.269 km --- -

xx
AM-36 (from LMCS)
Vertex IGRS E IGRS N Elev. Total Length Remarks Heading Hot Bends
1 751794 3370282 12.891 --- 2.2° -
2 751794 3370293 12.928 10.453 m 90.7° 90
3 751827 3370293 12.926 42.711 m 108.7° -
4 751874 3370278 12.909 91.964 m 183.7° 60 Hot Bend Nos.
5 751853 3369791 13.504 579.62 m 209.6° 30 30° 2
6 751490 3369115 13.051 1.346 km 295.2° 90 45° 1
7 751439 3369138 12.593 1.403 km 211.0° 90 60° 2
8 751337 3368959 11.225 1.609 km 250.5° 45 90° 7
9 751246 3368924 10.436 1.706 km 283.3° 30
10 750957 3368986 9.236 2.001 km 269.5° -
11 750812 3368981 7.532 2.146 km 249.3° -
12 750530 3368867 6.322 2.451 km 254.3° -
13 749846 3368657 5.727 3.166 km 256.7° -
14 749705 3368620 4.807 3.311 km 240.6° -
15 749486 3368490 4.625 3.566 km 151.2° 90
16 749562 3368358 4.216 3.719 km 240.2° 90
17 749411 3368266 3.221 3.896 km 151.1° 90
18 749793 3367611 5.84 4.654 km 143.1° -
19 749902 3367472 6.637 4.83 km 156.3° -
20 749983 3367300 6.04 5.021 km 237.6° 90
21 749818 3367190 5.583 5.219 km 181.0° 60
22 749818 3367090 6.196 5.319 km --- -
AQ-32 (from LMCS)
Vertex IGRS E Y Elevati Total Length Remarks Heading Hot Bends
1 751792.9 3370282 12.894 --- 2.2° -
2 751793 3370297 12.943 15.005 m 90.7° -
3 751798.9 3370316 13.002 34.159 m 108.7° -
4 751802.6 3370368 13.174 86.133 m 183.7° 90 Hot Bend Nos.
5 751762.2 3370374 13.073 127.02 m 209.6° 90 30° 1
6 751759.7 3370555 13.346 308.36 m 295.2° - 45° 0
7 751827 3370936 13.409 694.96 m 211.0° 30 60° 2
8 751874.1 3370999 13.215 773.41 m 250.5° 60 90° 2
9 753712.7 3370797 13.684 2.622 km TS Required 283.3° 60
10 753787.9 3370924 12.432 2.769 km TS Required 269.5° -
-
-
-
-
-
-
-
-
-
-
-
-
AO-30 (from LMCS)
Vertex IGRS E Y Elevati Total Length Remarks Heading Hot Bends
1 751791.9 3370282 12.888 --- 1.8° -
2 751792 3370297 12.944 15.089 m 19.5° -
3 751798 3370316 13.002 34.28 m 5.4° -
4 751801.6 3370367 13.168 85.538 m 280.3° 90 Hot Bend Nos.
5 751760.9 3370373 13.067 126.65 m 0.6° 90 30° 0
6 751758.6 3370556 13.341 309.12 m 5.5° - 45° 0
7 751766.1 3370658 13.088 412.03 m 9.3° - 60° 1
8 751850.3 3371261 13.001 1.02 km 19.8° - 90° 2
9 752144 3372138 11.069 1.944 km 325.9° 60
10 752048.6 3372272 11.43 2.109 km 339.4° -
11 751979.4 3372444 11.114 2.294 km --- -
-
-
-
-
-
-
-
-
-
-
-
AR-39 (from SCS)
Vertex IGRS E Y Elevation Total Length Remarks Heading Hot Bends
1 753433.2 3363780 18.444 --- 178.7° -
2 753434.1 3363761 18.623 19.066 m To Confirm LA 105.1° 60
3 753502 3363744 19.353 88.981 m To Confirm LA 77.2° 30
4 753690 3363792 19.449 282.77 m To Confirm LA 35.4° 45 Hot Bend Nos.
5 754056.7 3364333 20.891 936.74 m To Confirm LA 84.4° 45 30° 4
6 754567.1 3364396 22.629 1.451 km To Confirm LA 31.6° 45 45° 3
7 754807.8 3364809 23.357 1.928 km To Confirm LA 313.6° 60 60° 2
8 754691.7 3364914 23.409 2.085 km To Confirm LA 345.3° 30 90° 0
9 754652.9 3365049 22.743 2.226 km To Confirm LA 1.3° -
10 754652.7 3365174 22.381 2.35 km To Confirm LA 333.6° 30
11 754621.8 3365233 22.341 2.417 km To Confirm LA 305.0° 30
12 754515.1 3365304 22.196 2.545 km --- -
-
-
-
-
-
-
-
-
-
-
AH-19 (from NCS)

Vertex IGRS E IGRS N Elev. Total Length Remarks Heading Hot Bends
1 748356 3384165 1.202 --- 0.3° -
2 748356 3384188 1.2 23.234 m 271.4° 90
3 748290 3384189 1.177 89.383 m 0.8° 90
4 748289 3384218 1.198 119.09 m 271.6° 90 Hot Bend Nos.
5 747927 3384220 1.432 480.87 m 272.6° - 30° 0
6 747568 3384228 1.476 840.4 m 265.4° - 45° 0
7 747372 3384208 1.577 1.037 km 270.1° - 60° 0
8 747290 3384206 1.51 1.119 km 179.4° 90 90° 5
9 747291 3384189 1.52 1.136 km 168.6° -
10 747659 3382558 1.739 2.807 km 256.3° 90
11 747638 3382552 2.043 2.828 km 270.5° -
12 747051 3382544 2.053 3.415 km 255.7° -
13 746672 3382438 1.574 3.808 km 252.1° -
14 746047 3382220 1.591 4.47 km 266.0° -
15 745806 3382198 1.692 4.713 km --- -
AH-21 (from NCS)
Vertex IGRS E IGRS N Elev. Total Length Remarks Heading Hot Bends
1 748354 3384165 1.201 --- -
2 748353.9 3384187 1.2 22.255 m 271.4° 90
3 748288.6 3384188 1.176 87.521 m 0.5° 90
4 748288.2 3384217 1.193 117.2 m 271.6° 90 Hot Bend Nos.
5 747927.9 3384219 1.43 477.39 m 272.6° - 30° 0
6 747569 3384227 1.471 836.22 m 265.4° - 45° 2
7 747372.1 3384207 1.579 1.034 km 270.1° - 60° 1
8 747291.5 3384205 1.511 1.115 km 179.3° 90 90° 8
9 747292 3384189 1.521 1.131 km 168.6° -
10 747660.5 3382553 1.754 2.807 km 167.7° 90
11 747981.3 3381227 1.228 4.171 km 128.3° 45
12 748046.6 3381178 1.474 4.253 km 167.7° 45
13 748153.7 3380736 1.831 4.707 km 257.5° 90
14 748076.1 3380717 2.053 4.787 km 271.2° -
15 747730 3380716 2.469 5.133 km 184.3° 90
16 747728.7 3380690 2.876 5.159 km 274.6° 90
17 747098.1 3380727 1.577 5.79 km TS Required 262.6° -
18 745610 3380499 1.131 7.295 km TS Required 187.6° 60
19 745590 3380319 0.567 7.476 km TS Required -
AI-18 (from NCS)
Vertex IGRS E IGRS N Elev. Total Length Remarks Heading Hot Bends
1 748352 3384165 1.201 --- 1.2° -
2 748352 3384186 1.2 21.102 m 271.6° 90
3 748287 3384187 1.175 85.188 m 0.6° 90
4 748287 3384216 1.189 114.81 m 271.6° 90 Hot Bend Nos.
5 747928 3384218 1.429 474.13 m 272.6° - 30° 1
6 747568 3384226 1.478 833.85 m 265.4° - 45° 0
7 747371 3384206 1.58 1.032 km 270.1° - 60° 1
8 747293 3384204 1.511 1.11 km 179.2° 90 90° 5
9 747293 3384189 1.521 1.125 km 168.6° -
10 747497 3383286 1.638 2.051 km 257.7° 90
11 747465 3383278 1.614 2.084 km 282.6° 30
12 746633 3383445 1.32 2.932 km 356.3° 60
13 746622 3383570 1.229 3.058 km --- -

xx
AM-20 (from NCS)
Vertex IGRS E IGRS N Elev. Total Length Remarks Heading Hot Bends
1 749972.7 3381866 1.55 --- 271.3° -
2 749844.1 3381866 1.26 128.49 m TS required 1.1° 90
3 749840 3382774 1.167 1.035 km TS required 270.2° 90
4 748383.8 3382744 1.236 2.491 km 348.4° 90 Hot Bend Nos.
5 748289.5 3383153 1.28 2.912 km 351.8° - 30° 0
6 748233.3 3383488 1.447 3.251 km 10.9° - 45° 0
7 748339.6 3384114 1.204 3.885 km 87.6° 60 60° 1
8 748390.9 3384117 1.187 3.937 km 0.2° - 90° 5
9 748389.6 3384183 1.21 4.002 km 270.9° 90
10 748363.5 3384182 1.202 4.028 km 181.6° 90
11 748361.2 3384165 1.202 4.045 km --- -
-
-

xx
INJ-5 (from UMCS)
Vertex IGRS E Y Elevation Total Length Remarks Heading Hot Bends
1 749876.2 3377653 1.737 --- 181.0° -
2 749876.4 3377612 1.6 41.051 m 107.4° 60
3 749991.7 3377578 2.744 161.02 m 64.6° 45
4 750026.5 3377596 2.581 199.89 m 93.8° 30 Hot Bend Nos.
5 750420.1 3377579 1.888 593.73 m 89.9° - 30° 1
6 751772.5 3377614 2.015 1.946 km 41.0° 45 45° 2
7 752278.5 3378223 1.88 2.738 km TS Required 307.8° 90 60° 1
8 751833.9 3378552 1.878 3.291 km TS Required --- - 90° 1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
INJ-7 (from UMCS)
Vertex IGRS E Y Elevation Total Length Remarks Heading Hot Bends
1 749875.2 3377653 1.734 --- 181.2° -
2 749875.3 3377611 1.594 41.9 m 107.3° 60
3 750001.1 3377575 2.766 172.73 m 62.8° 45
4 750037.1 3377594 2.354 213.72 m 93.7° 30 Hot Bend Nos.
5 750229.1 3377586 1.968 405.81 m 145.6° 45 30° 2
6 750461.3 3377264 2.125 803.02 m 156.9° - 45° 7
7 750518 3377139 2.182 940.13 m 196.1° 45 60° 4
8 750492.6 3377043 2.29 1.039 km 154.0° 45 90° 3
9 750539.9 3376951 3.53 1.143 km 111.8° 45
10 750610.3 3376925 2.728 1.218 km 150.0° 30
11 750954.8 3376359 2.886 1.88 km 165.4° -
12 751031 3376092 3.048 2.157 km 87.4° 60
13 751112.4 3376098 2.653 2.239 km 152.0° 60
14 751279 3375802 2.503 2.578 km 153.3° -
15 751421.3 3375535 3.485 2.881 km 148.5° -
16 751661.8 3375162 5.487 3.324 km 58.4° 90
17 752263 3375552 3.278 4.04 km 1.6° 60
18 752263.5 3375666 2.699 4.154 km 84.8° 90
19 752755.9 3375722 2.683 4.65 km 134.6° 45
20 752838.6 3375645 2.506 4.763 km 92.3° 45
21 753030.9 3375641 2.435 4.955 km 4.6° 90
22 753036.7 3375741 2.395 5.055 km --- -