PT. LANCANG
KUNING SUKSES Statement
(System to Work Safely)
Company/Department : PT. Lancang Kuning Sukses WMS No:
Address : 2020-F-LKS-HSE-NO.18
Work Location / Area : PT CATERPILLAR _Body Building Bay 1 - Expansion
NAMA PENGAWAS, ENGINEER & HSE KONTRAKTOR PELAKSANA DAN APA SAJA TUGAS TUGASNYA
1. Diaz P and Agus Supriyono as Site Supervisor
2. Mahesa and Angga as Engineer
3. Wigik, Fidiyansah, Norman and Amril Al Riza as HSE officer
Job Description
1. Site Supervisor
a. Inspecting construction sites regularly to identify and eliminate potential safety hazards.
b. Supervising and instructing the construction team as well as subcontractors.
c. Educating site workers on construction safety regulations and accident protocol.
d. Enforcing site safety rules to minimize work-related accidents and injuries.
e. Handling site accidents in accordance with established accident protocol.
f. Maintaining an accurate record of construction employee attendance.
g. Evaluating the performance of construction employees and instituting disciplinary measures as needed.
h. Analyzing blueprints to ensure that construction projects meet design, safety, and budget specifications.
i. Recommending changes to construction operations or procedures to increase efficiency.
2. Engineering
a. Managing parts of construction projects
b. Overseeing erection work
c. Undertaking surveys
d. Setting out sites
e. Checking technical designs and drawings to ensure that they are followed correctly
f. Supervising contracted staff
g. Ensuring project packages meet agreed specifications, budgets and/or timescales
h. Liaising with clients, subcontractors and other professional staff, especially quantity surveyors and the overall project manager
i. Providing technical advice and solving problems on site
j. Preparing site reports and filling in other paperwork
k. Ensuring that health and safety and sustainability policies and legislation are adhered to.
3. HSE Officer
a. Advise and instruct on various safety-related topics (noise levels, use of machinery etc.)
b. Conduct risk assessment and enforce preventative measures
c. Review existing policies and measures and update according to legislation
d. Initiate and organize Safety Briefing of worker
e. Inspect premises and the work of personnel to identify issues or non-conformity (e.g., not using protective equipment)
f. Oversee installations, disposal of substances etc.
g. Stop any unsafe acts or processes that seem dangerous or unhealthy
h. Record and investigate incidents to determine causes.
IMPLEMENTATION PLAN (Start Date and End) And the Hour Start and Finish Every Day
RENCANA WAKTU PELAKSANAAN (Tanggal Mulai dan Selesai) Dan Jam Mulai dan Selesai Setiap Hari
SEQUENCE OF WORK
1. Preparation
1.1. Document preparation for work purpose (RA & PTW)
1.2. Safety briefing and TBM before proceed work activity
1.3. The Project In-charge will confirm area and method are ready to execute
1.4. Identify special safety equipment to be used
1.5. Coordinate with client to ensure suitable access will be available at all times.
1.6. Organize work group to perform the works. If necessary, organize with client suitable laydown
area close to work place.
1.7. Ensure all Access area are not difficult, dangerous and safe
1.8. Ensure All Supporting Document and Procedure and Permit in placed and has been read
1.9. All tools, equipment and worker has been prepared
1.10. All Suporting Document and Tooling has been prepared and ready
1.11. Barricade tape,protection has been prepared and install
3. Finishing
3.1. Cleaning the panels after installation. It is the standard operating procedure of cleaning
the roof panel every end of the day and after finishing the roof installation.
3.2. Finished roof panel installation
Risk assessment
Mitigation Plan W.A.H
Drawing engineering Lifeline
Pre-checklist W.A.H
Inspection checklist.
Employee/Worker List
(list all employees/workers involved in work process)
No Name Position Department Competence/License/Certificate Remarks
(List all)
Mandatory:
Additional: