GRAVITY THO

S No Project Drawing Title Status


1 EXCAVATION LAYOUT AND SECTION Issued
2 PRELIMINARY FRAMING Issued
3 REVISED FRAMING Issued
4 STP AND UG DETAILS Issued
5 COLUMN LAYOUT Issued
6 FOOTING LAYOUT Issued
7 EXCAVATION AND COLUMN SCHEDULE Issued
8 PLINTH BEAM LAYOUT Issued
9 DESIGN BRIEF REPORT Issued
10 STAIRCASE DETAILING Issued
11 FIRST FLOOR LAYOUT Issued
12 FIRST FLOOR BEAM SCHEDULE Issued
13 FIRST FLOOR SLAB REINF Issued
14 SECOND FLOOR LAYOUT Issued
15 SECOND FLOOR BEAM SCHEDULE Issued
16 SECOND FLOOR SLAB REINF Issued
17 THIRD FLOOR LAYOUT Issued

18 JHANVI NORESTATE THIRD FLOOR BEAM SCHEDULE Issued


19 THIRD FLOOR SLAB REINF Issued
20 FOURTH FLOOR LAYOUT Issued
FOURTH FLOOR BEAM SCHEDULE
21 Issued
FOURTH FLOOR SLAB REINF
22 Issued

TERRACE FLOOR LAYOUT


23 Issued

TERRACE FLOOR BEAM SCHEDULE


24 Issued

TERRACE FLOOR SLAB REINF


25 Issued

FOLATING COLUMN DETAILS


26 Issued

POOL FRAMIN LAYOUT


27 Issued

FILT
1 EXCAVATION LAYOUT AND SECTION
2 PRELIMINARY FRAMING Issued
3 FINAL FRAMING PLAN Issued
4 COLUMN LAYOUT Issued

FILTRATION UNIT
FILTRATION UNIT FOOTING & COLUMN/RCC WALL
5 REINFORCEMENT Issued
6 BASEMENT FLOOR PLAN Issued
7 STRUCTURAL PLAN Issued
8 ARCHITECTURAL PLAN Issued
9 STRUCTURAL PLAN Issued
10 STEEL STRUCTURAL PLAN Issued

1 CONCEPT PLAN Issued


GROUND & TYPICAL FLOOR PLAN
2 Issued
DRAFT FINAL PLAN
3 Issued

PRM FINAL PLAN R1


4 Issued
FINAL PLAN R2
5 Issued
FINAL PLAN DISCUSSED WITH AR.
6 SANTOSH (R3) Issued
7 COLUMN REVISION R4 Issued
8 COLUMN AND REINFORCEMENT PLAN Issued

SEN
1 CONCEPT PLAN Issued

2 GROUND FLOOR PLAN Issued


SENTHIL RESIDENCE
3 FIRST & TERRACE FLOOR PLAN Issued
4 OPTIONS Issued
4 OPTIONS Issued

1 CONCEPT PLAN Issued


CAFETERIA
2 DESIGN OPTIONS Issued

PLINTH DRAWING GROUND FLOOR (SLAB


1 PROJECTION) Issued
INFION
2 UPDATED FRAMING &STRUCTURAL DRAWING Issued

OF
1 CONCEPT PLAN Issued
OFFICE CONTAINER
CONCEPT MODELLING Issued

1 LAYOUT PLAN Issued


VOLVO OFFICE
CONCEPT LAYOUT PLAN Issued

1 SKF UG SUMP AS BUILT DRAWING


SKF UG SUMP STEEL
2 STRUCTURE AS BUILT DRAWING
SKF UG SUMP STEEL
3 STRUCTURE AS BUILT DRAWING

1 CONCEPT PLAN Issued


2 DESIGN PACKAGE Issued
AVS OFFICE
3 REVISION 1 Issued
BOQ Issued
GRAVITY THOUGHTSS DESIGN TRACKER
Submission
Discipline Drawing No Revision No Planned Dates
Dates
Structural 6-Nov-21
Structural 9-Nov-21
Structural 19-Nov-21
Structural 9-Nov-21
Structural 26-Nov-21
Structural 29-Nov-21
Structural 1-Dec-21
Structural 2-Dec-21
Structural 4-Dec-22
Structural 15-Feb-22
Structural 21-Feb-22
Structural 5-Mar-22
Structural 5-Mar-22
Structural 9-Mar-22
Structural 8-Sep-22
Structural 8-Sep-22
Structural 10-Oct-22
5-Dec-22
Structural
Structural 5-Dec-22
Structural 12-Dec-22
26-Dec-22
Structural
26-Dec-22
Structural

23-Feb-23
Structural S-TERF-01 RA2

23-Feb-23
Structural S-TERBD-01 R1

23-Feb-23
Structural S-TERF-01 R1

9-Mar-23
Structural S-TERF-01 R1

23-Mar-23
Structural S-TERF-01 R0

FILTRATION UNIT - SKF


Structural 17-Jan-23
Structural 17-Jan-23
Structural 1/24/2023
Structural 1/27/2023
Structural 1/27/2023
Structural 2/3/2023
Structural 2/11/2023
Architetural 3/24/2023
Structural 3/24/2023
Structural 4/5/2023

PRM
Architectural 11-Jan-23
REVISED 23-01-
Architectural 2023 20-Jan-23
REVISED 31-01-
Architectural 2023 31-Jan-23
REVISED 06-02-
2023 6-Feb-23
Architectural
REVISED 07-
02-23 7-Feb-23
Architectural
REVISED 27-
Architectural 02-23
Architectural 3/28/2023
Architectural 4/1/2023

SENTHIL RESIDENCE
Architectural 22-Nov-22
Architectural REVISED

Architectural
Architectural REVISED 28-Mar-23
Architectural REVISED 28-Mar-23

CAFETERIA
Architectural 2/2/2023
Architectural 2/4/2023

INFION
REVISED 16-12-
Architetural 2022 12/16/2022

Structural 12/19/2022

OFFICE CONTAINER
Architetural 2/18/2023

Architetural 2/20/2023

VOLVO OFFICE
Architetural 2/18/2023

Architetural 2/24/2023

SKF UG SUMP
Architetural 3/4/2023

Structural

Structural 3/4/2023

AVS OFFICE
Architectural 17-Feb-23
Architectural 7-Mar-23
Architectural REVISED 14-Mar-23
6-Apr-23
Site
Remarks Remark
Visit/Office

7/9/2022 Siva Shankar


7/13/2022 Shivakumar
7/29/2022 Siva Shankar
8/23/2022 Sivashankar
9/7/2022 Siva Shankar
9/14/2022 Siva Shankar
12/5/2022 Shivakumatr & Vikrant
Shiva, Vikrant & Vinith 4
12/9/2022 th floor 1st part
12/28/2022 Siva Shankar & Mani
1/7/2023 Siva Shankar
Vinith & Swathi 4th floor
1/24/2023 2nd part
Swathi & Aliyas 4th Floor
2/6/2023 3rd Part

Vinith & Swathi Terrace


3/2/2023 Floor

JH_SWIMMIG POOL SHUTTERING


LAYOUT_23.03.2023 - R0.dwg

Reviewed & Approved


Reviewed By Client, Comments.

Reviewed By Client, Comments to be


Updated & To be Send Today.

Reviewed By Client, Comments

Reviewed By Client, Comments.

Reviewed & Approved

Reviewed By Client, Comments

Approved
NOT Approved

APPROVED