Task 2
Manage project time
BSBPMG531
Student Declaration
To be filled out and submitted with assessment responses
◻ I declare that this task and any attached document related to the task is all my own work and I have not
cheated or plagiarised the work or colluded with any other student(s)
◻ I understand that if I am found to have plagiarised, cheated or colluded, action will be taken against me
according to the process explained to me
◻ I have correctly referenced all resources and reference texts throughout these assessment tasks.
◻ I have read and understood the assessment requirements for this unit
◻ I understand the rights to re-assessment
◻ I understand the right to appeal the decisions made in the assessment
Unit Title
Unit Code
Student name
Student ID
number
Student Date
signature
Task Number
Completed successfully
DNS
N
Y
Did the student satisfactorily:
The student has satisfactorily completed ☐ ☐ ☐
and submitted the following:
Completed successfully
DNS
N
Y
Did the student satisfactorily:
as summarizing, questioning,
paraphrasing and active listening
Answered questions from the
stakeholders
Reached an agreement regarding the
project schedule baseline and the
finalisation of the WBS, WBS dictionary
and the project schedule.
Feedback in Comments.
The student met with the project team to ☐ ☐ ☐
discuss the work performed to address the
Case Study and:
Feedback in Comments.
Demonstrated ability to: ☐ ☐ ☐
Develop work breakdown structure with
sufficient detail to enable effective
planning and control
Completed successfully
DNS
N
Y
Did the student satisfactorily:
Completed successfully
DNS
N
Y
Did the student satisfactorily:
Sheet)
Participation in meeting with the
project team -Case Study (Refer to
Marking Sheet)
When collaborating with the group, the ☐ ☐ ☐
student has actively participated in group
work with a substantial contribution that
can be assessed individually for all the
requirements of this task.
Student Name:
Assessor Name:
Assessor Signature:
Date:
Table of Content
Student Declaration................................................................................................................................................2
Task 2 – Determine project schedule.............................................................................................7
Task 2.1 Work Breakdown Structure..............................................................................................................11
Task 2.2 Project Schedule...................................................................................................................................13
Task 2.3 Agree on schedule baseline..............................................................................................................15
Task 2.4 Reflection................................................................................................................................................16
Task 2.5 Case Study..............................................................................................................................................16
References................................................................................................................................................................20
What is this Refer to and read the documents saved in a separate folder:
assessment task
about? MMI company profile and project task
You have been recently engaged by XYZ Pty Ltd trading as MMI as a
Project Manager (PM) to develop and implement a project to open
a new campus in Sydney (refer to MMI strategic objectives).
Scope
Time
Quality
Cost
Human Resources
Information system and communication
Risk
Project Integration
Communicate with influence
Facilitate continuous improvement in project work
Develop project workplace policy and procedures for sustainability
Lead and manage project team effectiveness
Having a clear vision of the project and its structure will help you plan
and implement it in simulated work conditions.
Your trainer and assessor will provide support and mentorship in the
role of Project Sponsor (PS).
You will work in a project team of max four students. You will both
lead the team and be a part of it to experience different project roles
in the simulated work environment, project manager being the main
one.
Take turns playing the role of PM when the task requires project team
collaboration. The trainer and assessor will observe project work and
provide feedback on the Marking Sheet.
Student Name
Student Name
Student Name
Student Name
Although you will lead and collaborate with the project team, your
assessment's work must be individual, and it will be marked as such.
o Product-based ☒
o Direct observation of Role-Play ☒
o Case Study ☒
o Other (specify) ☐
Develop:
Collaborate with the project team to gather inputs and feedback to inform the development of the
WBS and the WBS dictionary.
Consult with the project sponsor (played by the trainer and assessor in the simulated work
environment) as needed.
Template 1 -WBS
Develop a deliverable oriented WBS for three levels work package starting with the key deliverables
(3-5) and then adding work packages (2-3/deliverable) and sub-work packages (2-3/deliverable).
Alternatively, you could structure the WBS by project phases with work packages and sub-packages
associated with each phase (phase-oriented).
Please note that you can use the template below or produce a WBS by listing, for example:
Etc.
The WBS Dictionary is the formal project document that provides detailed descriptions of key
information for all Elements in the Work Breakdown Structure and must comply with the 100% Rule.
The 100% Rule requires that the WBS captures 100% of the project scope. However, since the titles
of the WBS elements are only one or two words, it is impossible to confirm by just using the WBS that
this rule has been met. The WBS Dictionary is the project document that describes the work in each
element such that the project team is able to plan and execute 100% of the scope. (Source:
https://www.workbreakdownstructure.com/wbs-dictionary ).
We have created a simple template for the WBS dictionary below, complete it for each deliverable
identified in the WBS.
Note: if you have chosen to develop the WBS by project phase, develop the WBS dictionary by
substituting the deliverable with the project phase and providing the necessary details to describe
what each phase will deliver.
1. Develop a project schedule in the form of a Gantt Chart for the project.
Deliverable milestones
It is recommended that you use excel or another suitable project scheduling tool (please consult with
the trainer and assessor).
The Gantt Chart will show estimated task duration and effort, sequence and dependencies of tasks to
achieve the project deliverables.
Submit the Gantt Chart in a separate file with your assessment. Call the file: Project Schedule.
Consult with the project sponsor (played by the trainer and assessor in the simulated work
environment) as needed.
(40-80 words)
Resource requirements
Schedule a time with the trainer and assessor in week 3 of class to present:
The WBS
The WBS dictionary
The project schedule
to a group of relevant stakeholders (members of the project team and the project steering committee
played by a group of classmates) in a simulated work environment.
Explain the project scheduling tools used when planning the project schedule
Show sequencing and dependencies of tasks
Seek an agreement on assigned responsibilities for project schedule management
Consider feedback and input from stakeholders and evaluate how to incorporate them into the
project schedule
Use communication techniques such as summarizing, questioning, paraphrasing and active
listening
Answer questions from the stakeholders
Reach an agreement regarding the project schedule baseline and the finalisation of the WBS, WBS
dictionary and project schedule.
The trainer and assessor will evaluate your performance during the presentation and provide feedback
on the marking sheet.
If you are absent from class, you are responsible for making alternative arrangements with the trainer
and assessor to present and discuss the WBS, the WBS dictionary, and the project schedule.
Finalise the WBS, the WBS dictionary and the project schedule by implementing the feedback
received by the stakeholders. Document the agreed changes in the table provided below:
Agreed changes
WBS
WBS Dictionary
Schedule
Please note that the trainer and assessor will check that the agreed changes have been applied to
WBS, the WBS dictionary and the project schedule submitted with your assessment.
Reflect on the work performed when planning for project time management.
What technique/s did you use when developing the WBS? Why?
What techniques/methods did you use when sequencing tasks?
How did you identify task dependencies?
(50-100 words)
The Project Sponsor asked you and your team to help with a project. The Marketing Team is
organising an event to present the new campus to education agents. The Project Sponsor would like
you to develop the time management plan for this project.
The plan will be used by the marketing team in charge of organising the event.
Please note the event will be planned and delivered by existing staff only: the marketing team, and
any other individual staff you believe should be included from the organisational chart.
Collaborate with the project team to gather inputs and feedback to inform the development of the
WBS.
Consult with the project sponsor (played by the trainer and assessor in the simulated work
environment) as needed.
Template 1 -WBS
Develop a deliverable oriented WBS for three levels work package starting with the key deliverables
(2-3) and then adding work packages (1-2/deliverable) and sub-work packages (1-2/deliverable).
Alternatively, you could structure the WBS by project phases with work packages and sub-packages
associated with each phase (phase-oriented).
Please note that you can use the template below or produce a WBS by listing, for example:
Etc.
Project
Deliverable milestones
It is recommended that you use excel or another suitable project scheduling tool (please consult with
the trainer and assessor).
The Gantt Chart will show estimated task duration and effort, sequence and dependencies of tasks to
achieve the project deliverables.
Submit the Gantt Chart in a separate file with your assessment. Call the file: Project Schedule-
Case Study.
Consult with the project sponsor (played by the trainer and assessor in the simulated work
environment) as needed.
3. Review the Gantt Chart and identify the impact of the schedule on project time management,
resource requirements, costs and risks.
(30-50 words)
Resource requirements
4. Schedule a time with the trainer and assessor in week 3 of class to meet with the team to discuss:
The WBS
The project schedule
Explain the project scheduling tools used when planning the project schedule
Show sequencing and dependencies of tasks
Seek an agreement on assigned responsibilities for project schedule management
Consider feedback and input from stakeholders and evaluate how to incorporate them into the
project schedule
Use communication techniques such as summarizing, questioning, paraphrasing and active
listening
Answer questions from the stakeholders
Reach an agreement regarding the project schedule baseline and the finalisation of the WBS and
project schedule.
The trainer and assessor will validate your active participation in the meeting and provide feedback on
the marking sheet.
If you are absent from class, you are responsible for making alternative arrangements with the trainer
and assessor to present and discuss the WBS, the WBS dictionary, and the project schedule.
Finalise the WBS, the project schedule by implementing the feedback received by the
stakeholders. Document the agreed changes in the table provided below:
Agreed changes
WBS
Schedule
(Please refer to this referencing guide if needed or speak to your trainer for any specific referencing
requirements for this assessment)