Professional Documents
Culture Documents
Task 4
Undertake project work
BSBPMG522
Unit Title
Unit Code
Student name
Student ID
number
Student Date
signature
Task Number
DNS
Did the student satisfactorily:
The following documents are satisfactorily ☐ ☐ ☐
completed:
DNS
Did the student satisfactorily:
project review meeting (see meeting minutes)
Documented lessons learned from the project ☐ ☐ ☐
and reported within the organisation.
Student Name:
Assessor Name:
Assessor Signature:
Date:
Student Declaration................................................................................................................................................2
Task 4 – Finalise and Review Project.............................................................................................6
Task 4.1 Finalise and review the project.........................................................................................................9
What is this This task builds on the work completed in Task 2 and 3.
assessment task
about? This task comprises of product-based methods of assessment in a
simulated work environment.
meeting with the team and reflect on how the project was
planned and delivered.
you have been dealt with unfairly or have other appropriate grounds
for an appeal. You are encouraged to consult with the assessor prior
to attempting this task if you do not understand any part of this task
or if you have any learning issues or needs that may hinder you when
attempting any part of the assessment.
Procedures
Using the workplace scenario information provided, you will work collaboratively with your project
team to finalise a project (initiated, planned and managed in Task 2 and 3).
1. Review the assessment scenario, the business documentation (including policies and
procedures), the work completed at project initiation, planning and execution phase and
the project planning templates provided:
2. Reflect on your work in this assessment when defining, planning and delivering the project.
3. In consultation with your project team, complete the financial record-keeping for the
project:
4. In consultation with your project team and management, assign project team members to
roles. Obtain agreement on new roles and responsibilities.
5. Produce a handover report for the Project Sponsor (the trainer and assessor) for sign-off.
c. review the project management tools used, evaluate their contribution to the project
BSBPMG522 Undertake project work V2 2020 Page 8
RTO Provider: 91153 - CRICOS Code: 02672K
greenwichcollege.edu.au
Procedures
7. Produce a post-project review report for all stakeholders, including the Board of Directors,
containing:
The project is now completed. Meet with the team and reflect on how the project was planned and
delivered and produce the following reports:
This report provides a record of the post-project review meeting with the project team, detailing items that were discussed when
reviewing the overall project. Use it to record the meeting with the project team. Customise the template and add additional rows as
needed.
Topic Speaker
project planning,
project management,
project scheduling and tracking,
project estimating,
communication (with team, other groups/stakeholders, sponsor),
risk management,
vendor management,
issues management,
stakeholder management,
resourcing,
users,
project development approach,
training, documentation,
technology,
overall approach to project (i.e. vendor package, staged implementation, etc.),
production and operation support.
Transition arrangements
Outline the transition arrangements for team members to transition them at the completion of the
project and determine any support required.
5 min.
Record
Complete the filing record below so that the project document can be saved in the project management record system
The project budget is a prediction of the costs associated with a particular project. These costs include labour, materials, and other
resources required to complete the project. At the end of the project review budget variations and how the project performed in relation
to budget. Customise the template and add additional rows as needed.
Subtotal
TOTAL
Record
Complete the filing record below so that the project document can be saved in the project
management record system
Handover report
Initial objectives
Total
Issues summary
Date Date
Item Strategy
logged resolved
Staff transition
Summarise staff transition arrangements to new roles or re-assigned to previous roles. (50-80 words)
Record
Complete the filing record below so that the project document can be saved in the project management record system
Name of project:
Overview
Brief summary of highlights and achievements, etc. (50-100 words)
Project objectives
Project Deliverables
Success criteria
Schedule
Budget
Record
BSBPMG522 Undertake project work V2 2020 Page 14
RTO Provider: 91153 - CRICOS Code: 02672K
greenwichcollege.edu.au
Post-Project Review Report
Complete the filing record below so that the project document can be saved in the project management record system.
Copy the table below in a separate document and obtain sign off from the project sponsor to finalise and conclude the project. Scan and
submit the approval table with your assessment. Alternatively, obtain a digital approval (example: email form the project sponsor/trainer
and assessor)
Approvals
Approvals: