You are on page 1of 13

Non Detail Engineer Design x Approved

Sumur HCE-10A Ke Tie-In PAD 7 Approved With Note

Document No: DNG1-PM-000-PLN-ENG-50011 Not Approve


Rev. 0 Reviewed By Approved By

(Approval for Construction)

Name: Beny Haryanto Name: Bhaskara Name: M. Thasril


Date : 04 Oktober 2022 Date : 04-Okt-2022 Date : 04-Okt-2022
PT KWARSA HEXAGON PT. GEO DIPA ENERGI

INSPECTION AND TEST PLAN


ELECTRICAL WORK

Detail
INSPECTION AND TEST PLAN
ELECTRICAL WORK
Document No : DNG1-PM-000-PLN-ENG-50011
Rev. 0

REVISION SHEET
Revision
Page
A B C 0 1
1 X
2 X
3 X
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

Detail
INSPECTION AND TEST PLAN
ELECTRICAL WORK
Document No : DNG1-PM-000-PLN-ENG-50011
Rev. 0

COMMENT SHEET
No Page/Bab Revision Date PMC EPC
1 Page Rev A 01/09/2022 Dimanakah lampirannya ( Detail ITP Electrical Noted
( Detail ITP Electrical see attachment-1).
see attachment-1).
2 Page 6 Cables For Rev 0 03/10/2022 Tolong tambahkan pada termination item 4. Noted
Power, Sealer cable inlet
Instrumentation and Tolong tambahkan pada testing item 2.
Communic, Control Grouning testing

Page 6 Tolong tambahkan pada testing & SAT vendor Noted


transformer testing report
Transformer Tolong tambahkan pada testing & SAT vendor
transformer item 6. Oil level & temperature
alarm testing
Page 7 Tolong tambahkan pada termination item 4. Noted
Sealer cable inlet
MV Switchgear Tolong tambahkan pada 7. testing item 7. ACB
(circuit breaker) testing
Page 7 LV MCC Tolong tambahkan pada 5. termination item 4. Noted
Sealer cable inlet
Tolong tambahkan pada 6. testing item 4. ACB
(circuit breaker) & VSD testing
Tolong tambahkan pada 6. testing item 5.
busbar testing
Tolong tambahkan pada 6. testing item 6.
Grouning testing
Tolong tambahkan pada 6. testing item 7.
Local remote control testing

KSO Poeser -
COMPANY PT. Kwarsa Hexagon (PMC)
Maharani
BY Beny Haryanto Alifia Rahman
POSITION Electrical Engineer Electrical Engineer

Detail
INSPECTION AND TEST PLAN
ELECTRICAL WORK
Document No : DNG1-PM-000-PLN-ENG-50011
Rev. 0

TABLE OF CONTENTS
1. PURPOSE .................................................................................................................................... 4
2. SCOPE ......................................................................................................................................... 4
3. OBJECTIVE .................................................................................................................................. 4
4. ABBREVIATION AND DEFINITIONS ............................................................................................. 4
5. INSPECTION AND TEST PLAN FOR ELECTRICAL .......................................................................... 4

Detail
INSPECTION AND TEST PLAN
ELECTRICAL WORK
Document No : DNG1-PM-000-PLN-ENG-50011
Rev. 0

1. PURPOSE
The purpose of this procedure is to describing construction activities to be inspected or
tested as required by contract specifications in the sequential manner of construction
work.

2. SCOPE
The execution plan describes the planning for Contractor’s person in-charge/site
organization, time schedule, mobilization, HSSE, facilities of construction work for Tie-in
Sumur HCE-10A Dieng Unit-1 Project.

3. OBJECTIVE
This objective of this procedure is to maintain the uniformity and consistency of
Contractor’s Quality, schedule and safety activities by all parties and personnel involved in
Dieng project.
The objectives of execution plan are that :

 Only accepted facilities by contract documents will be delivered to Owner.


 No defects/troubles/non-conformities and pre-commissioning work will be achieved
within agreed schedule.

4. ABBREVIATION AND DEFINITIONS


Abbreviation Definition
Owner PT. Geodipa Energi
PMC Project Management Construction
Contractor KSO Poeser-Maharani
Subcontractor The person, firm or corporation to whom the Subcontract
is issued

5. INSPECTION AND TEST PLAN FOR ELECTRICAL


Inspections will be conducted by Contractor and witnessed by Owner’s inspector in
accordance with applicable ITP. Inspection record for the witness inspection is reviewed
and signed by the inspector soon after completion of the inspection.

( Detail ITP Electrical see attachment-1).


Detail
INSPECTION AND TEST PLAN
ELECTRICAL WORK
Document No : DNG1-PM-000-PLN-ENG-50011
Rev. 0

Attachment-1

Detail
INSPECTION AND TEST PLAN (ITP)

LEGEND :
A : KSO/ Contractor H : Hold
B : PMC W : Witness
Discipline : Electrical ERECTION OF ELECTRICAL SYSTEM C : Owner / GDE PW : Partial Witness
Title : ITP Electrical D : Other (Disnaker, etc) R : Review Document

FREQUENCY CONFIRMATION OF INSPECTION


APPLICABLE CODE INSPECTION
NO ITEM KKS NO. WORK STEP INSPECTION & TEST ITEM OF REMARKS
AND STANDARD RECORD
INSPECTION A B C D
Code & T
1 Cables For Power, as standard 1. Material check 1. Visual check 100% Shop Drawing Packing MRR W R W, R
Instrumentation and requirement 2. Quantity check 100% List MRR W R W, R
Communic, Control 2. Supporting for cable trays & 1. Position Check 100% Installation Record W R R
conduit 2. Elevation Check 100% Installation Record W R R
Installation Drawing
3. Leveling Check 100% Installation Record W R R
4. Bolting check 100% Inspection Report W R R
3. Pulling Cable 1. Visual Check 100% Inspection Report W R R
Technical Specification
2. Dimension Check 100% Installation Record W R R
4. Termination 1. Wiring Check 100% Drawing & Technical Installation Record W R R R
2. Connection Check 100% Spec. Installation Record W R R R
3. Continuity Check 100% Installation Record W R R R
5. Testing 1. Insulation Resistance Test 100% Drawing & Technical Spec.Inspection Report W W, R W, R W, R
2 Transformer as standard 1. Material Check 1. Visual Check 100% Shop Drawing Packing MRR W R W, R
requirement 2. Quality Check 100% List MRR W R W, R
2. Lifting & On base 1. Position Check 100% W R W, R
2. Level Check 100% Erection Drawing Installation Record W R W, R
3. Bolting 100% W R R
3. Assembly & Insulation 1. Position Check 100% W R R
Erection Drawing Installation Record
2. Level Check 100% W R R
4. Cabling 1. Visual Check 100% Installation Record W R R
Technical Specification
2. Dimension Check 100% Installation Record W R R
5. Termination 1. Wiring check 100% Inspection Report W R R R
Drawing & technical
2. High Potential test 100% Inspection Report W W, R W, R R
spec.
6. Testing 1. Phase sequence Check 100% Test Record W W, R W, R W, R
2. Tap setting Check 100% Test Record W W, R W, R W, R
Detail
3. Insulation Resistance Check 100% Test Specification Test Record W W, R W, R W, R
4. Earth resistance Check 100% Test Record W W, R W, R W, R

1 of 7
INSPECTION AND TEST PLAN (ITP)

LEGEND :
A : KSO/ Contractor H : Hold
B : PMC W : Witness
Discipline : Electrical ERECTION OF ELECTRICAL SYSTEM C : Owner / GDE PW : Partial Witness
Title : ITP Electrical D : Other (Disnaker, etc) R : Review Document

FREQUENCY CONFIRMATION OF INSPECTION


APPLICABLE CODE INSPECTION
NO ITEM KKS NO. WORK STEP INSPECTION & TEST ITEM OF REMARKS
AND STANDARD RECORD
INSPECTION A B C D
Code & T
5. High Potential Test 100% Shop Drawing Packing Test Record W W, R W, R W, R
List Code & T
3 MV Switchgear as standard 1. Material Check 1. Visual Check 100% Shop Drawing Packing MRR W R W, R
requirement 2. Quality Check 100% List MRR W R W, R
2. Foundation 1. Center Line Check 100% Foundation W R W, R
Civil Drawing
2. Elevation Check 100% Inspection Report W R W, R
3. Lifting & On Base 1. Position Check 100% Installation Record W R R
Erection Drawing
2. Level Check 100% Installation Record W R R
4. Assembly & Installation 1. Alignment Check 100% Installation Record W R R
2. Center Line check 100% Installation Drawing Installation Record W R R
3. Bolting Check Tightening Record W R R
5. Cabling 1. Visual check 100% Technical Specification Inspection Report W R R
2. Dimension Check 100% Inspection Report W R R
6. Termination 1. Wiring Check 100% Inspection Report W R R
2. Bus Bar Connection Check 100% Drawing & Technical Inspection Report W R W, R
3. Continuity Check 100% Spec. Inspection Report W R W, R
4. Sealer at cable inlet 100% Inspection Report W R W, R
7. Testing 1. Calibration Check 100% Test Record W, R W, R W, R W, R
2. Insulation Resistance Test 100% Test Record W, R W, R W, R W, R
3. Safety Features Check 100% Test Record W, R W, R W, R W, R
4. Space Heater Check 100% Test Specification Test Record W, R W, R W, R W, R
5. Earthing Resistance Test 100% Test Record W, R W, R W, R W, R
6. High Potential Test 100% Test Record W, R W, R W, R W, R
7. ACB Test 100% Test Record W, R W, R W, R W, R
4 LV MCC as standard 1. Material Check 1. Visual Check 100% Shop Drawing Packing MRR W R W, R
Distribution Board Lighting requirement 2. Quality Check 100% List MRR W R W, R
Detail
Distribution UPS 2. Lifting & on base 1. Position Check 100% Installation Record W R R
Erection Drawing
2. Level Check 100% Installation Record W R R

2 of 7
INSPECTION AND TEST PLAN (ITP)

LEGEND :
A : KSO/ Contractor H : Hold
B : PMC W : Witness
Discipline : Electrical ERECTION OF ELECTRICAL SYSTEM C : Owner / GDE PW : Partial Witness
Title : ITP Electrical D : Other (Disnaker, etc) R : Review Document

FREQUENCY CONFIRMATION OF INSPECTION


APPLICABLE CODE INSPECTION
NO ITEM KKS NO. WORK STEP INSPECTION & TEST ITEM OF REMARKS
AND STANDARD RECORD
INSPECTION A B C D
Code & T
3. Assembly & Installation 1. Alignment Check 100% Shop Drawing Packing Alignment Record W R R
List
2. Center Line Check 100% Installation Drawing Installation Record W R R
3. Bolting Check 100% Tightening Record W R R
4. Cabling 1. Visual Check 100% Inspection Report W R R
Technical Specification
2. Dimension Check 100% Inspection Report W R R
5. Termination 1. Wiring Check 100% Inspection Report W R R R
2. Connection Check 100% Drawing & Technical Inspection Report W R R R
3. Continuity Check 100% Spec. Inspection Report W R R R
4. Sealer at cable inlet 100% Inspection Report W R R R
6. Testing 1. Operability Check 100% Test Record W W, R W, R W, R
2. Insulation Resistance Test 100% Test Record W W, R W, R W, R
3. Calibration Check 100% Test Record W W, R W, R W, R
4. ACB & VSD Testing 100% Test Specification Test Record W W, R W, R W, R
5. Busbar Testing 100% Test Record W W, R W, R W, R
6. Local-Remote Control Testing 100% Test Record W W, R W, R W, R
7. Grounding resistance test 100% Test Record W W, R W, R W, R
Code & T
5 DCS Panel as standard 1. Material Check 1. Visual Check 100% Shop Drawing Packing MRR W R W, R
Instrument Panel requirement 2. Quality Check 100% List MRR W R W, R
2. Insulation (Battery Charger) 1. Alignment Check 100% Alignment Record W R R
2. Center Line Check 100% Installation Drawing Installation Record W R R
3. Continuity Check 100% Tightening Report W R R
3. Cabling 1. Visual Check 100% Inspection Report W R R
Technical Specification
2. Dimension Check 100% Inspection Report W R R
4. Termination 1. Wiring Check 100% Inspection Report W R R R
Drawing & Technical
2. Connection Check 100% Inspection Report W R R R
Detail Spec.
3. Continuity Check 100% Inspection Report W R R R
5. Testing 1. Operability Check 100% Test Record W W, R W, R W, R
Test Specification

3 of 7
INSPECTION AND TEST PLAN (ITP)

LEGEND :
A : KSO/ Contractor H : Hold
B : PMC W : Witness
Discipline : Electrical ERECTION OF ELECTRICAL SYSTEM C : Owner / GDE PW : Partial Witness
Title : ITP Electrical D : Other (Disnaker, etc) R : Review Document

FREQUENCY CONFIRMATION OF INSPECTION


APPLICABLE CODE INSPECTION
NO ITEM KKS NO. WORK STEP INSPECTION & TEST ITEM OF REMARKS
AND STANDARD RECORD
INSPECTION A B C D
TestCode &
Specification T
2. Insulation Resistance Test 100% Shop Drawing Packing Test Record W W, R W, R W, R
List
6 Cable Tray System 1. Material Check 1. Visual Check 100% Shop Drawing Packing MRR W R W, R
2. Quantity Check 100% List MRR W R W, R
2. Supporting 1. Visual Check 100% Installation Drawing Inspection Report W R R
3. Assembly & Installation 1. Alignment Check 100% Alignment Record W R R
2. Center Line Check 100% Installation Drawing Installation Record W R R
3. Bolting Check 100% Tightening Record W R W, R
Code & T
7 Cable and Wires as standard 1. Material Check 1. Visual Check 100% Shop Drawing Packing MRR W R W, R
requirement 2. Quality Check 100% List MRR W R W, R
2. Supporting 1. Visual Check 100% Installation Record W R R
3. Pulling Cable 1. Visual Check 100% Inspection Report W R R
Technical Specification
2. Dimension Check 100% Inspection Report W R R
4. Termination 1. Wiring Check 100% Drawing & Technical Inspection Report W R R R
2. Connection Check 100% Spec. Inspection Report W R R R
Drawing & Technical
3. Continuity Check 100% Inspection Report W R R R
Spec.
5. Testing 1. Insulation Resistance Test 100% Test Record W W, R W, R W, R
Test Specification
2. High potential test for MV & 100% Test Record W W, R W, R W, R
HV Cables
8 Conduit and Embedded 1. Material Check 1. Visual Check 100% Installation Drawing Installation Record W R R
2. Quality Check 100% Installation Drawing Installation Record W R R
2. Elevation Check 1. Visual Check 100% Installation Drawing Installation Record W R R
3. Installation 1. Visual Check 100% Installation Drawing Installation Record W R R
2 Leveling Check 100% Installation Drawing Installation Record W R R
9 Conduit and Fitting as standard 1 Material Check 1. Visual Check 100% Shop Drawing Packing MRR W R W, R
requirement 2. Quality Check 100% List MRR W R W, R
Detail
2 Supporting 1. Visual Check 100% Installation Drawing Installation Record W R R
3 Insulation 1. Leveling Check 100% Installation Record W R R
Installation Drawing

4 of 7
INSPECTION AND TEST PLAN (ITP)

LEGEND :
A : KSO/ Contractor H : Hold
B : PMC W : Witness
Discipline : Electrical ERECTION OF ELECTRICAL SYSTEM C : Owner / GDE PW : Partial Witness
Title : ITP Electrical D : Other (Disnaker, etc) R : Review Document

FREQUENCY CONFIRMATION OF INSPECTION


APPLICABLE CODE INSPECTION
NO ITEM KKS NO. WORK STEP INSPECTION & TEST ITEM OF REMARKS
AND STANDARD RECORD
INSPECTION A B C D
Code &Drawing
Installation T
2. Tightness Check 100% Shop Drawing Packing Tightening Record W R R
List Code & T
10 Underground Grounding as standard 1. Material Check 1. Visual Check 100% Shop Drawing Packing MRR W R W, R
Mesh and Risers requirement 2. Quality Check 100% List MRR W R W, R
2. Elevation and poin check 1. Visual Check 100% Installation Drawing Installation Record W R R
3. Cable Laying 1. Visual Check 100% Installation Drawing Installation Record W R R
4. Termination 1. Wiring Check 100% Inspection Report W R W, R
Drawing & Technical
2. Connection Check 100% Inspection Report W R W, R
Spec.
3. Continuity Check Inspection Report W R W, R
5. Testing 1. Grounding resistance test 100% Test Specification Inspection Report W W, R W, R
11 Above ground Grounding foras standard 1. Material Check 1. Visual Check 100% Shop Drawing Packing MRR W R W, R
Equip. and Structures requirement 2. Quality Check 100% List MRR W R W, R
2. Cable Laying 1. Visual Check 100% Installation Drawing Inspection Record W R R
3. Termination 1. Wiring Check 100% Inspection Record W R R
Drawing & Technical
2. Connection Check 100% Inspection Record W R R
Spec.
3. Continuity Check 100% Inspection Record W R R
4. Testing 1. Grounding Resistance Test 100% Test Specification Test Record W W, R W, R
Code & T
12 Lighting System as standard 1. Material Check 1. Visual Check 100% Shop Drawing Packing MRR W R W, R
( Equipment ) requirement 2. Quality Check 100% List MRR W R W, R
2. Supporting 1. Visual Check 100% Installation Drawing Installation Record W R R
3. Installation 1. Alignment Check 100% Alignment Record W R R
2. Center Line Check 100% Installation Drawing Installation Record W R R
3. Bolting Check 100% Tightening Record W R R
4. Cabling 1. Visual Check 100% Inspection Report W R R
Technical Specification
2. Dimension Check 100% Inspection Report W R R
5. Termination 1. Wiring Check 100% Inspection Report W R R
Detail Drawing & Technical
2. Connection Check 100% Inspection Report W R R
Spec.
3. Continuity Check 100% Inspection Report W R R
Code &

5 of 7
INSPECTION AND TEST PLAN (ITP)

LEGEND :
A : KSO/ Contractor H : Hold
B : PMC W : Witness
Discipline : Electrical ERECTION OF ELECTRICAL SYSTEM C : Owner / GDE PW : Partial Witness
Title : ITP Electrical D : Other (Disnaker, etc) R : Review Document

FREQUENCY CONFIRMATION OF INSPECTION


APPLICABLE CODE INSPECTION
NO ITEM KKS NO. WORK STEP INSPECTION & TEST ITEM OF REMARKS
AND STANDARD RECORD
INSPECTION A B C D
Code & T
6. Testing 1. Operability Check 100% Test
ShopSpecification
Drawing Packing Test Record W W, R W, R
List
13 Lighting System as standard 1. Material Check 1. Visual Check 100% Shop Drawing Packing MRR W R W, R
( Indoor & Outdoor ) requirement 2. Quality Check 100% List MRR W R W, R
2. Supporting 1. Visual Check 100% Installation Drawing Installation Record W R R
3. Installation 1. Alignment Check 100% Alignment Record W R R
2. Center Line Check 100% Installation Drawing Installation Record W R R
3. Bolting Check 100% Tightening Record W R R
4. Cabling 1. Visual Check 100% Inspection Report W R R
Technical Specification
2. Dimension Check 100% Inspection Report W R R
5. Termination 1. Wiring Check 100% Inspection Report W R R
Drawing & Technical
2. Connection Check 100% Inspection Report W R R
Spec.
3. Continuity Check 100% Inspection Report W R R
6. Testing 1. Operability Check 100% Test Specification Test Record W W, R W, R
14 Underground Electrical as standard 1. Material Check 1. Visual Check 100% Shop Drawing Packing MRR W R W, R
Cable Tunnel & Trench requirement 2. Quality Check 100% List MRR W R W, R
2. Supporting 1. Visual Check 100% Installation Record W R R
Installation Drawing
2. Leveling Check 100% Alignment Record W R R
3. Pulling Cable 1. Visual Check 100% Installation Record W R R
Technical Specification
2. Dimension Check 100% Inspection Record W R R
4. Termination 1. Wiring Check 100% Inspection Report W R R R
Drawing & Technical
2. Connection Check 100% Inspection Report W R R R
Spec.
3. Continuity Check 100% Inspection Report W R R R
Code &
5. Testing 1. Insulation Resistance Test 100% Test Record W W, R W, R W, R
Test Specification
2. High Potential test for MV & 100% Test Record W W, R W, R W, R
HV Cables W W, R W, R W, R
Detail
15 Transformer as standard 1. Material Check 1. Visual Check 100% Shop Drawing Packing MRR W R W, R
requirement 2. Quality Check 100% List MRR W R W, R

6 of 7
INSPECTION AND TEST PLAN (ITP)

LEGEND :
A : KSO/ Contractor H : Hold
B : PMC W : Witness
Discipline : Electrical ERECTION OF ELECTRICAL SYSTEM C : Owner / GDE PW : Partial Witness
Title : ITP Electrical D : Other (Disnaker, etc) R : Review Document

FREQUENCY CONFIRMATION OF INSPECTION


APPLICABLE CODE INSPECTION
NO ITEM KKS NO. WORK STEP INSPECTION & TEST ITEM OF REMARKS
AND STANDARD RECORD
INSPECTION A B C D
Code & T
2. Lifting & on base 1. Position Check 100% Shop Drawing Packing Installation Record W R R
Erection
List Drawing
2. Level Check 100% Installation Record W R R
3. Assembly & Installation 1. Alignment Check 100% Alignment Record W R R
2. Center Line Check 100% Installation Drawing Installation Record W R R
3. Bolting Check 100% Tightening Record W R R
4. Cabling 1. Visual Check 100% Inspection Report W R R
Technical Specification
2. Dimension Check 100% Inspection Report W R R
5. Termination 1. Wiring Check 100% Inspection Report W R R R
Drawing & Technical
2. Connection Check 100% Inspection Report W R R R
Spec.
3. Continuity Check 100% Inspection Report W R R R
6. Testing 1. Insulation Resistance Test 100% Test Record W W, R W, R W, R
(FAT/SAT) 2. High Potential Test 100% Test Record W W, R W, R W, R
2. Operability Check 100% Test Specification Test Record W W, R W, R W, R
2. Oil level Test 100% Test Record W W, R W, R W, R
3. Temperature Alarm Test 100% Test Record W W, R W, R W, R

Detail

7 of 7