You are on page 1of 7

Day 1 Immersion

The Deployment
This Day is the most exciting day that we have we are now deployed to the designated office
where we are assigned to have our Immerssion.

In this picture we introduce to


the head of the Library office in
West Visayas State University
Calinog Campus. We also do
orientation of the rules and the
responsibilities that we are
gonna do in the whole week.

In this picture this is the first thing I do in the office


I clean the book shelves in the library.
Day 1 Immersion

The Deployment

In this picture shows Im checking the books if the


book properly place in the right shelf accourding to
the kind of book.

In this picture it shows that I was assigned to


the log in area of the library

2
Day 2 Immersion

Work

I watered the plant inside the


In my day 2 I started my
library.
immersion by mapping the floor
of the library.

The last thing that I do is


cleaning the Comfort Room of
the library.

3
Day 3 Immersion

Cleaning the Library

This time in our third day this is the busy day that we had we clean the
outside window and the path way of the library

4
Day 4 Immersion

Arranging The Book into the Right Shelf

In the day four of my immersion


together with my co – immersionist
we areange properly the book in
their respictive shelf.

5
Day 5 Immersion
Day 6 Immersion

In our day 6 of our immersion in the library we are task by the head to
assemble and fixed the shelves of the book in the second floor. Together with
my co immersionist we assemble and fixed it properly

6
Day 7 Immersion

In our day 7 of immersion we are


given a task to post a policy guidline
inside the library.

You might also like