Name:- Dhiraj kumar, Reg no:- 12016586, Section:- C2001, Course code:-Civ473, CA:- 1

Task Duratio Star Finis Predecesso


Task Name Resource Names WBS
Mode n t h rs

Mo
Sat
Auto n
459 10-
Schedule CA 1 20- 0
days 08-
d 02-
24
23

Construction
Project
Managemen Mo
Sat
Auto t Of School n
459 10-
Schedule Civil 20- 1
days 08-
d Engineering( 02-
24
56 Block) In 23
Lovely
Professional
University

Mo
Mon
Auto n
LOI \ WO 20-
Schedule 1 day 20- 1.1
receipt date 02-
d 02-
23
23

Mo
Sat
Auto n
LPU 56 459 10-
Schedule 20- 1.2
Block days 08-
d 02-
24
23

Auto Level 1 213 We Tue 1.2.1


Schedule days d 31-
d 22- 10-
02- 23
23

We
Wed
Auto d
12-
Schedule Foundation 42 days 22- 1.2.1.1
04-
d Work 02-
23
23

We
Thu
Auto d
Site 23- Executive engineer[3],site 1.2.1.1.
Schedule 2 days 22- 2FS+1 day
Survey 02- engineer[2],surveyor[2] 1
d 02-
23
23

Fri Sat
Auto
Land 24- 25- junior engineer[5],labour[12],Project 1.2.1.1.
Schedule 2 days 6
Mark 02- 02- engineer[2] 2
d
23 23

Mo
Thu compactor[3],excavators,labour[20],sit
Auto n
16- e 1.2.1.1.
Schedule 7 days 27- 7
Excavation 03- engineer[3],surveyor[2],tractors[5],ba 3
d 02-
23 ckhoe loader,bull dozer
23

Tue Thu
Auto PCC
14- 16- 1.2.1.1.
Schedule for plinth 3 days 8FF
03- 03- 4
d beam
23 23

Thu Wed
Auto steel of dia 12[20 ton],junior
Rein. 16- 29- 1.2.1.1.
Schedule 6 days 9FS-1 day engineer[5],labour[18],site
Bar binding 03- 03- 5
d engineer[2]
23 23

Sat Tue
Auto
18- 04- 10SS+2 labour[5],wooden frame[100 no], 1.2.1.1.
Schedule Shuttering 3 days
03- 04- days plastic benches [1 no] 6
d work
23 23

coarse aggregate of M16[7 cum],fine


We
Wed aggregate of 4.75mm[5
Auto RCC d
12- cum],grader[2],labour[10],opc cement 1.2.1.1.
Schedule of 7 days 05- 11
04- 53 grade[20 bag],sand[10 7
d foundation 04-
23 cum],water[200 litre], opc cement 43
23
grade[1 bag]

Auto Plinth 42 days Thu Thu 1.2.1.2


Schedule beam 13- 01-
d 04- 06-
23 23

Thu Sat
Auto
Column upto 13- 29- 1.2.1.2.
Schedule 15 days 12
plinth beam 04- 04- 1
d
reinf binding 23 23

Fri Thu
Auto
14- 27- 1.2.1.2.
Schedule Column 12 days 14SS+1 day
04- 04- 2
d shuttering
23 23

Mo
Sat
Auto n
22- 15SS+2 1.2.1.2.
Schedule 6 days 17-
Column RCC 04- days 3
d 04-
23
23

Mo
Thu
Auto n
11- 1.2.1.2.
Schedule Backfilling 15 days 24- 16
05- 4
d works 04-
23
23

Fri Fri
Auto
Reinf. Steel 12- 26- 1.2.1.2.
Schedule 13 days 17
binding for 05- 05- 5
d
plinth beam 23 23

Thu Wed
Auto
Shuttering 11- 24- 1.2.1.2.
Schedule 12 days 18SS-1 day
for plinth 05- 05- 6
d
beam 23 23

Thu Thu
Auto RCC
25- 01- 1.2.1.2.
Schedule of plinth 7 days 19
05- 06- 7
d beam
23 23

Fri Fri
Auto
02- 14-
Schedule DPC 37 days 1.2.1.3
06- 07-
d
23 23

Fri Tue
Auto
Column upto 02- 13- 1.2.1.3.
Schedule 10 days 20
DPC reinf 06- 06- 1
d
binding 23 23

Auto 8 days Mo Tue 22SS+2 1.2.1.3.


Schedule Column n 13-
05-
06-
d shuttering 06- days 2
23
23

We
Wed
Auto d
21- 1.2.1.3.
Schedule 7 days 14- 23
Column RCC 06- 3
d 06-
23
23

Fri Sat opc cement 43 grade[16 bag],brick


Auto
Brick 16- 24- 24SS+2 masons[5],labour[6],sand[10 1.2.1.3.
Schedule 6 days
work 06- 06- days cum],water[150 litre], plastic benches 4
d
23 23 [1 no],brick

Mo
Fri
Auto n
30- 1.2.1.3.
Schedule Reinf. Steel 5 days 26- 25
06- 5
d for DPC 06-
23
23

Mo
Mon
Auto n
03- 1.2.1.3.
Schedule Shuttering 7 days 26- 26SS
07- 6
d for DPC 06-
23
23

Tue Fri
Auto
RCC 04- 14- 1.2.1.3.
Schedule 10 days 27
of DPC 07- 07- 7
d
23 23

Sat Wed
Auto
15- 13-
Schedule Slab 51 days 1.2.1.4
07- 09-
d
23 23

Sat Tue
Auto
Column upto 15- 01- 1.2.1.4.
Schedule 15 days 28
slab Reinf. 07- 08- 1
d
Binding 23 23

Tue Mon
Auto
18- 31- 30SS+2 1.2.1.4.
Schedule Column 12 days
07- 07- days 2
d shuttering
23 23

Auto 8 days Tue Wed 31 1.2.1.4.


Schedule Column RCC 01- 09- 3
d 08- 08-
23 23

Sat Wed
Auto
Brick 02- 13- 1.2.1.4.
Schedule 10 days 36
work 09- 09- 4
d
23 23

Thu Sat
Auto
Shuttering 10- 02- 1.2.1.4.
Schedule 20 days 32
for sab and 08- 09- 5
d
tie beam 23 23

Thu Mon
Auto Reinf. Steel
10- 28- 1.2.1.4.
Schedule binding for 15 days 34SS
08- 08- 6
d slab and tie
23 23
beam

Tue Fri
Auto RCC
29- 01- 1.2.1.4.
Schedule for slab and 4 days 35
08- 09- 7
d tie beam
23 23

Sat Fri
Auto
02- 08-
Schedule Stair 6 days 1.2.1.5
09- 09-
d
23 23

Sat Wed
Auto
Stair 02- 06- 1.2.1.5.
Schedule 4 days 36
formwork 09- 09- 1
d
23 23

Mo
Thu
Auto n
Reinf. 07- 1.2.1.5.
Schedule 4 days 04- 38SS+1 day
Binding of 09- 2
d 09-
stair 23
23

Fri Fri
Auto
RCC 08- 08- 1.2.1.5.
Schedule 1 day 39
of stair 09- 09- 3
d
23 23

Tue Wed
Auto
12- 04-
Schedule plastering 20 days 1.2.1.6
09- 10-
d and painting
23 23

Auto 12 days Tue Mon 45SS+1 day opc cement 43 grade[30 1.2.1.6.
Schedule 12- 25- bag],labour[12],plasterers,sand[10
09- 09- cum],water[500 litre],wooden
d plastering 1
23 23 frame[12 no], plastic benches [1 no]

Tue Wed
Auto
26- 04- labour[10],paints[20 kg],chemicals[6.5 1.2.1.6.
Schedule 8 days 42
painting 09- 10- kg] 2
d
23 23

Mo
Electrical, Tue
Auto n
Plumbing 31-
Schedule 44 days 11- 1.2.1.7
and 10-
d 09-
Carpentering 23
23
work

Mo electrician[10],fan[40
Tue
Auto n no],microphone[10 no],switch[250
03- 40SS+2 1.2.1.7.
Schedule Electrical 2 days 11- no],tube light[40 no],white board[10
10- days 1
d work 09- no],wiring pipe[200 no], opc cement
23
23 43 grade[1 bag]

Mo
Sat
Auto n glass panel(2'*2.5')[2
23- 1.2.1.7.
Schedule Plumbing 4 days 11- 45SS no],plumber[3],toilet seat[5 no],water
09- 2
d work 09- basin[3 no]
23
23

Mo door (4'*6.5')[10 no],door(3'*6.5')[4


Tue
Auto n no],glass panel(2'*2.5')[6 no],glass
03- 1.2.1.7.
Schedule Carpentering 20 days 11- 46SS panel(2'*6')[3 no],glass panels(4'*2')[4
10- 3
d work 09- no],white board[10
23
23 no],window(2'*10')[19 no]

We
Thu opc cement 43 grade[5
Auto Floor d
26- bag],labour[7],tiles(2'*2')[200 1.2.1.7.
Schedule finishing 20 days 04- 47
10- no],tiles(2.5'*2.5')[150 no], plastic 4
d work 10-
23 benches [1 no]
23

Fri Tue
Auto
27- 31- 1.2.1.7.
Schedule Menial work 4 days 48 labour[5],site engineer[2]
10- 10- 5
d for level 1
23 23

We
Mon
Auto d
25-
Schedule Level 2 89 days 13- 1.2.2
12-
d 09-
23
23
We
Tue
Auto d
14-
Schedule Slab 54 days 13- 1.2.2.1
11-
d 09-
23
23

We
Tue
Auto d
Column upto 14- 1.2.2.1.
Schedule 12 days 01- 49
slab Reinf. 11- 1
d 11-
Binding 23
23

We
Sat
Auto d
23- 1.2.2.1.
Schedule Column 10 days 13- 42SS+1 day
09- 2
d shuttering 09-
23
23

Mo
Tue
Auto n
03- 1.2.2.1.
Schedule 8 days 25- 53
Column RCC 10- 3
d 09-
23
23

Sat Thu
Auto
Brick 28- 02- 1.2.2.1.
Schedule 5 days 58
work 10- 11- 4
d
23 23

We
Tue
Auto d
Shuttering 17- 1.2.2.1.
Schedule 12 days 04- 54
for slab and 10- 5
d 10-
tie beam 23
23

Tue Wed
Auto Reinf. Steel
17- 25- 56SS+11 1.2.2.1.
Schedule binding for 8 days
10- 10- days 6
d slab and tie
23 23
beam

Thu Fri
Auto RCC
26- 27- 1.2.2.1.
Schedule for slab and 2 days 57
10- 10- 7
d tie beam
23 23

Auto Stair 4 days We Sat 1.2.2.2


Schedule d 07-
d 04- 10-
10- 23
23

We
Fri
Auto d
Stair 06- 1.2.2.2.
Schedule 3 days 04- 56SS
formwork 10- 1
d 10-
23
23

Thu Fri
Auto
Reinf. 05- 06- 1.2.2.2.
Schedule 2 days 60SS+1 day
Binding of 10- 10- 2
d
stair 23 23

Sat Sat
Auto
RCC 07- 07- 1.2.2.2.
Schedule 1 day 61
of stair 10- 10- 3
d
23 23

Mo
Wed
Auto n
01-
Schedule plastering 21 days 09- 1.2.2.3
11-
d and painting 10-
23
23

Mo
Mon
Auto n
23- 1.2.2.3.
Schedule 13 days 09- 62
plastering 10- 1
d 10-
23
23

Tue Wed
Auto
24- 01- 1.2.2.3.
Schedule 8 days 64
painting 10- 11- 2
d
23 23

Electrical, Fri Mon


Auto
Plumbing 03- 25-
Schedule 45 days 1.2.2.4
and 11- 12-
d
Carpentering 23 23
work

Fri Sat
Auto
03- 25- 1.2.2.4.
Schedule Electrical 20 days 55
11- 11- 1
d work
23 23

Auto 12 days Fri Thu 67SS 1.2.2.4.


Schedule Plumbing 03- 16- 2
d work 11- 11-
23 23

Fri Sat
Auto
03- 25- 1.2.2.4.
Schedule Carpentering 20 days 68SS
11- 11- 3
d work
23 23

Mo
Tue
Auto Floor n
19- 1.2.2.4.
Schedule finishing 20 days 27- 69
12- 4
d work 11-
23
23

We
Mon
Auto d
25- 1.2.2.4.
Schedule Menial work 5 days 20- 70
12- 5
d for level 2 12-
23
23

Sat Mon
Auto
28- 05-
Schedule Level 3 86 days 1.2.3
10- 02-
d
23 24

Sat Thu
Auto
28- 07-
Schedule Slab 35 days 1.2.3.1
10- 12-
d
23 23

Sat Fri
Auto
Column upto 28- 10- 1.2.3.1.
Schedule 12 days 58
slab Reinf. 10- 11- 1
d
Binding 23 23

Mo
Thu
Auto n
09- 1.2.3.1.
Schedule Column 10 days 30- 74SS+1 day
11- 2
d shuttering 10-
23
23

Fri Sat
Auto
10- 18- 1.2.3.1.
Schedule 8 days 75
Column RCC 11- 11- 3
d
23 23

Sat Thu
Auto
Brick 02- 07- 1.2.3.1.
Schedule 5 days 80
work 12- 12- 4
d
23 23
Mo
Sat
Auto n
Shuttering 02- 1.2.3.1.
Schedule 12 days 20- 76
for sab and 12- 5
d 11-
tie beam 23
23

Tue Wed
Auto Reinf. Steel
21- 29- 1.2.3.1.
Schedule binding for 8 days 78SS+1 day
11- 11- 6
d slab and tie
23 23
beam

Thu Fri
Auto RCC
30- 01- 1.2.3.1.
Schedule for slab and 2 days 79
11- 12- 7
d tie beam
23 23

Mo
Fri
Auto n
24-
Schedule Stair 5 days 20- 1.2.3.2
11-
d 11-
23
23

Mo
Wed
Auto n
Stair 22- 1.2.3.2.
Schedule 3 days 20- 78SS
formwork 11- 1
d 11-
23
23

We
Thu
Auto d
Reinf. 23- 82SS+2 1.2.3.2.
Schedule 2 days 22-
Binding of 11- days 2
d 11-
stair 23
23

Fri Fri
Auto
RCC 24- 24- 1.2.3.2.
Schedule 1 day 83
of stair 11- 11- 3
d
23 23

Mo
Tue
Auto n
26-
Schedule plastering 20 days 04- 1.2.3.3
12-
d and painting 12-
23
23

Auto 12 days Mo Sat 77SS+1 day 1.2.3.3.


Schedule plastering n 16- 1
d 04- 12-
12- 23
23

Mo
Tue
Auto n
26- 1.2.3.3.
Schedule 8 days 18- 86
painting 12- 2
d 12-
23
23

Mo
Electrical, Mon
Auto n
Plumbing 05-
Schedule 43 days 18- 1.2.3.4
and 02-
d 12-
Carpentering 24
23
work

Mo
Tue
Auto n
09- 1.2.3.4.
Schedule Electrical 20 days 18- 86
01- 1
d work 12-
24
23

Mo
Sat
Auto n
30- 1.2.3.4.
Schedule Plumbing 12 days 18- 89SS
12- 2
d work 12-
23
23

Mo
Tue
Auto n
09- 1.2.3.4.
Schedule Carpentering 20 days 18- 90SS
01- 3
d work 12-
24
23

We
Thu
Auto Floor d
01- 1.2.3.4.
Schedule finishing 20 days 10- 91
02- 4
d work 01-
24
24

Fri Mon
Auto
02- 05- 1.2.3.4.
Schedule Menial work 3 days 92
02- 02- 5
d for level 3
24 24

Mo
Mon
Auto n
328 11-
Schedule Level 4 20- 1.2.4
days 03-
d 02-
24
23
Sat Sat
Auto
02- 13-
Schedule Slab 37 days 1.2.4.1
12- 01-
d
23 24

Sat Fri
Auto
Column upto 02- 15- 1.2.4.1.
Schedule 12 days 80
slab Reinf. 12- 12- 1
d
Binding 23 23

Tue Fri
Auto
05- 15- 96SS+2 1.2.4.1.
Schedule Column 10 days
12- 12- days 2
d shuttering
23 23

Sat Mon
Auto
16- 25- 1.2.4.1.
Schedule 8 days 97
Column RCC 12- 12- 3
d
23 23

Tue Sat
Auto
Brick 09- 13- 1.2.4.1.
Schedule 5 days 102
work 01- 01- 4
d
24 24

Tue Mon
Auto
Shuttering 26- 08- 1.2.4.1.
Schedule 12 days 98
for sab and 12- 01- 5
d
tie beam 23 24

Thu Fri
Auto Reinf. Steel
28- 05- 100SS+2 1.2.4.1.
Schedule binding for 8 days
12- 01- days 6
d slab and tie
23 24
beam

Sat Mon
Auto RCC
06- 08- 1.2.4.1.
Schedule for slab and 2 days 101
01- 01- 7
d tie beam
24 24

Tue Fri
Auto
26- 29-
Schedule Stair 4 days 1.2.4.2
12- 12-
d
23 23

Tue Thu
Auto
Stair 26- 28- 1.2.4.2.
Schedule 3 days 100SS
formwork 12- 12- 1
d
23 23
We
Thu
Auto d
Reinf. 28- 104SS+1 1.2.4.2.
Schedule 2 days 27-
Binding of 12- day 2
d 12-
stair 23
23

Fri Fri
Auto
RCC 29- 29- 1.2.4.2.
Schedule 1 day 105
of stair 12- 12- 3
d
23 23

Thu Mon
Auto
11- 26-
Schedule plastering 40 days 1.2.4.3
01- 02-
d and painting
24 24

Thu Wed
Auto
11- 24- 99SS+2 1.2.4.3.
Schedule 12 days
plastering 01- 01- days 1
d
24 24

Sat Mon
Auto
17- 26- 1.2.4.3.
Schedule 8 days 111
painting 02- 02- 2
d
24 24

Mo
Electrical, Mon
Auto n
Plumbing 328 11-
Schedule 20- 1.2.4.4
and days 03-
d 02-
Carpentering 24
23
work

Thu Fri
Auto
25- 16- 1.2.4.4.
Schedule Electrical 20 days 108
01- 02- 1
d work
24 24

Sat Fri
Auto
17- 01- 1.2.4.4.
Schedule Plumbing 12 days 109SS
02- 03- 2
d work
24 24

Sat Mon
Auto
17- 11- 1.2.4.4.
Schedule Carpentering 20 days 112SS
02- 03- 3
d work
24 24

Auto Floor 20 days Mo Wed 1.2.4.4.


Schedule finishing n 15- 4
d work 20- 03-
02-
23
23

Mo
Wed
Auto n
22- 1.2.4.4.
Schedule Menial work 3 days 20-
02- 5
d for level 4 02-
23
23

Thu Tue
Auto
11- 30-
Schedule Level 5 95 days 1.2.5
01- 04-
d
24 24

Thu Tue
Auto
11- 20-
Schedule Slab 35 days 1.2.5.1
01- 02-
d
24 24

Thu Wed
Auto
Column upto 11- 24- 102FS+2 1.2.5.1.
Schedule 12 days
slab Reinf. 01- 01- days 1
d
Binding 24 24

Fri Tue
Auto
12- 23- 118SS+1 1.2.5.1.
Schedule Column 10 days
01- 01- day 2
d shuttering
24 24

We
Thu
Auto d
01- 1.2.5.1.
Schedule 8 days 24- 119
Column RCC 02- 3
d 01-
24
24

Thu Tue
Auto
Brick 15- 20- 1.2.5.1.
Schedule 5 days 124
work 02- 02- 4
d
24 24

Fri Thu
Auto
Shuttering 02- 15- 1.2.5.1.
Schedule 12 days 120
for sab and 02- 02- 5
d
tie beam 24 24

Sat Mon
Auto Reinf. Steel
03- 12- 122SS+1 1.2.5.1.
Schedule binding for 8 days
02- 02- day 6
d slab and tie
24 24
beam
Tue Wed
Auto RCC
13- 14- 1.2.5.1.
Schedule for slab and 2 days 123
02- 02- 7
d tie beam
24 24

Fri Tue
Auto
02- 06-
Schedule Stair 4 days 1.2.5.2
02- 02-
d
24 24

Fri Mon
Auto
Stair 02- 05- 1.2.5.2.
Schedule 3 days 122SS
formwork 02- 02- 1
d
24 24

Sat Mon
Auto
Reinf. 03- 05- 126SS+1 1.2.5.2.
Schedule 2 days
Binding of 02- 02- day 2
d
stair 24 24

Tue Tue
Auto
RCC 06- 06- 1.2.5.2.
Schedule 1 day 127
of stair 02- 02- 3
d
24 24

Sat Mon
Auto
17- 11-
Schedule plastering 20 days 1.2.5.3
02- 03-
d and painting
24 24

Sat Fri
Auto
17- 01- 121SS+2 1.2.5.3.
Schedule 12 days
plastering 02- 03- days 1
d
24 24

Sat Mon
Auto
02- 11- 1.2.5.3.
Schedule 8 days 130
painting 03- 03- 2
d
24 24

Electrical, Fri Tue


Auto
Plumbing 16- 30-
Schedule 64 days 1.2.5.4
and 02- 04-
d
Carpentering 24 24
work

Auto 20 days Fri Sat 130SS-1 1.2.5.4.


Schedule Electrical 16- 09- day 1
d work 02- 03-
24 24

Tue Mon
Auto
12- 25- 1.2.5.4.
Schedule Plumbing 12 days 131
03- 03- 2
d work
24 24

Tue Wed
Auto
12- 03- 1.2.5.4.
Schedule Carpentering 20 days 134SS
03- 04- 3
d work
24 24

Thu Fri
Auto Floor
04- 26- 1.2.5.4.
Schedule finishing 20 days 135
04- 04- 4
d work
24 24

Sat Tue
Auto
27- 30- 1.2.5.4.
Schedule Menial work 3 days 136
04- 04- 5
d for level 5
24 24

Fri Sat
Auto
16- 01-
Schedule Level 6 92 days 1.2.6
02- 06-
d
24 24

Fri Wed
Auto
16- 27-
Schedule Slab 35 days 1.2.6.1
02- 03-
d
24 24

Fri Thu
Auto
Column upto 16- 29- 124FS+1 1.2.6.1.
Schedule 12 days
slab Reinf. 02- 02- day 1
d
Binding 24 24

Sat Wed
Auto
17- 28- 140SS+1 1.2.6.1.
Schedule Column 10 days
02- 02- day 2
d shuttering
24 24

Thu Fri
Auto
29- 08- 1.2.6.1.
Schedule 8 days 141
Column RCC 02- 03- 3
d
24 24

Auto Brick 5 days Fri Wed 146 1.2.6.1.


Schedule work 22- 27- 4
d 03- 03-
24 24

Sat Fri
Auto
Shuttering 09- 22- 1.2.6.1.
Schedule 12 days 142
for sab and 03- 03- 5
d
tie beam 24 24

Mo
Tue
Auto Reinf. Steel n
19- 144SS+1 1.2.6.1.
Schedule binding for 8 days 11-
03- day 6
d slab and tie 03-
24
beam 24

We
Thu
Auto RCC d
21- 1.2.6.1.
Schedule for slab and 2 days 20- 145
03- 7
d tie beam 03-
24
24

Sat Wed
Auto
09- 13-
Schedule Stair 4 days 1.2.6.2
03- 03-
d
24 24

Sat Tue
Auto
Stair 09- 12- 1.2.6.2.
Schedule 3 days 144SS
formwork 03- 03- 1
d
24 24

Mo
Tue
Auto n
Reinf. 12- 148SS+1 1.2.6.2.
Schedule 2 days 11-
Binding of 03- day 2
d 03-
stair 24
24

We
Wed
Auto d
RCC 13- 1.2.6.2.
Schedule 1 day 13- 149
of stair 03- 3
d 03-
24
24

Sat Mon
Auto
30- 22-
Schedule plastering 20 days 1.2.6.3
03- 04-
d and painting
24 24

Sat Fri
Auto
30- 12- 155SS+2 1.2.6.3.
Schedule 12 days
plastering 03- 04- days 1
d
24 24
Sat Mon
Auto
13- 22- 1.2.6.3.
Schedule 8 days 152
painting 04- 04- 2
d
24 24

Electrical, Thu Sat


Auto
Plumbing 28- 01-
Schedule 57 days 1.2.6.4
and 03- 06-
d
Carpentering 24 24
work

Thu Fri
Auto
28- 19- 1.2.6.4.
Schedule Electrical 20 days 143
03- 04- 1
d work
24 24

Sat Fri
Auto
13- 26- 1.2.6.4.
Schedule Plumbing 12 days 153SS
04- 04- 2
d work
24 24

Sat Mon
Auto
13- 06- 1.2.6.4.
Schedule Carpentering 20 days 156SS
04- 05- 3
d work
24 24

Tue Wed
Auto Floor
07- 29- 1.2.6.4.
Schedule finishing 20 days 157
05- 05- 4
d work
24 24

Thu Sat
Auto
30- 01- 1.2.6.4.
Schedule Menial work 3 days 158
05- 06- 5
d for level 6
24 24

Fri Fri
Auto
22- 28-
Schedule Level 7 85 days 1.2.7
03- 06-
d
24 24

Fri Wed
Auto
22- 01-
Schedule Slab 35 days 1.2.7.1
03- 05-
d
24 24

Auto 12 days Fri Thu 146 1.2.7.1.


Schedule Column upto 22- 04- 1
d slab Reinf. 03- 04-
Binding 24 24

Sat Wed
Auto
23- 03- 162SS+1 1.2.7.1.
Schedule Column 10 days
03- 04- day 2
d shuttering
24 24

Thu Fri
Auto
04- 12- 1.2.7.1.
Schedule 8 days 163
Column RCC 04- 04- 3
d
24 24

Fri Wed
Auto
Brick 26- 01- 1.2.7.1.
Schedule 5 days 168
work 04- 05- 4
d
24 24

Sat Fri
Auto
Shuttering 13- 26- 1.2.7.1.
Schedule 12 days 164
for sab and 04- 04- 5
d
tie beam 24 24

Mo
Tue
Auto Reinf. Steel n
23- 166SS+1 1.2.7.1.
Schedule binding for 8 days 15-
04- day 6
d slab and tie 04-
24
beam 24

We
Thu
Auto RCC d
25- 1.2.7.1.
Schedule for slab and 2 days 24- 167
04- 7
d tie beam 04-
24
24

Sat Wed
Auto
13- 17-
Schedule Stair 4 days 1.2.7.2
04- 04-
d
24 24

Sat Tue
Auto
Stair 13- 16- 1.2.7.2.
Schedule 3 days 166SS
formwork 04- 04- 1
d
24 24

Mo
Tue
Auto n
Reinf. 16- 170SS+1 1.2.7.2.
Schedule 2 days 15-
Binding of 04- day 2
d 04-
stair 24
24
We
Wed
Auto d
RCC 17- 1.2.7.2.
Schedule 1 day 17- 171
of stair 04- 3
d 04-
24
24

Sat Mon
Auto
27- 20-
Schedule plastering 20 days 1.2.7.3
04- 05-
d and painting
24 24

Sat Fri
Auto
27- 10- 177SS-1 1.2.7.3.
Schedule 12 days
plastering 04- 05- day 1
d
24 24

Sat Mon
Auto
11- 20- 1.2.7.3.
Schedule 8 days 174
painting 05- 05- 2
d
24 24

Mo
Electrical, Fri
Auto n
Plumbing 28-
Schedule 53 days 29- 1.2.7.4
and 06-
d 04-
Carpentering 24
24
work

Mo
Tue
Auto n
21- 165SS+2 1.2.7.4.
Schedule Electrical 20 days 29-
05- days 1
d work 04-
24
24

Fri Thu
Auto
10- 23- 175SS-1 1.2.7.4.
Schedule Plumbing 12 days
05- 05- day 2
d work
24 24

Fri Sat
Auto
10- 01- 1.2.7.4.
Schedule Carpentering 20 days 178SS
05- 06- 3
d work
24 24

Mo
Tue
Auto Floor n
25- 1.2.7.4.
Schedule finishing 20 days 03- 179
06- 4
d work 06-
24
24
We
Fri
Auto d
28- 1.2.7.4.
Schedule Menial work 3 days 26- 180
06- 5
d for level 7 06-
24
24

Fri Sat
Auto
26- 10-
Schedule Level 8 92 days 1.2.8
04- 08-
d
24 24

Fri Thu
Auto
26- 06-
Schedule Slab 36 days 1.2.8.1
04- 06-
d
24 24

Fri Thu
Auto
Column upto 26- 09- 1.2.8.1.
Schedule 12 days 168
slab Reinf. 04- 05- 1
d
Binding 24 24

Mo
Thu
Auto n
09- 184SS+2 1.2.8.1.
Schedule Column 10 days 29-
05- days 2
d shuttering 04-
24
24

Fri Sat
Auto
10- 18- 1.2.8.1.
Schedule 8 days 185
Column RCC 05- 05- 3
d
24 24

Sat Thu
Auto
Brick 01- 06- 1.2.8.1.
Schedule 5 days 190
work 06- 06- 4
d
24 24

Mo
Sat
Auto n
Shuttering 01- 1.2.8.1.
Schedule 12 days 20- 186
for sab and 06- 5
d 05-
tie beam 24
24

Tue Wed
Auto Reinf. Steel
21- 29- 188SS+1 1.2.8.1.
Schedule binding for 8 days
05- 05- day 6
d slab and tie
24 24
beam

Auto RCC 2 days Thu Fri 189 1.2.8.1.


Schedule for slab and 30- 31-
05- 05-
d tie beam 7
24 24

Mo
Thu
Auto n
02-
Schedule Stair 4 days 29- 1.2.8.2
05-
d 04-
24
24

Mo
Wed
Auto n
Stair 01- 1.2.8.2.
Schedule 3 days 29- 185SS
formwork 05- 1
d 04-
24
24

Tue Wed
Auto
Reinf. 30- 01- 192SS+1 1.2.8.2.
Schedule 2 days
Binding of 04- 05- day 2
d
stair 24 24

Thu Thu
Auto
RCC 02- 02- 1.2.8.2.
Schedule 1 day 193
of stair 05- 05- 3
d
24 24

Sat Mon
Auto
08- 01-
Schedule plastering 20 days 1.2.8.3
06- 07-
d and painting
24 24

Sat Fri
Auto
08- 21- 199SS+1 1.2.8.3.
Schedule 12 days
plastering 06- 06- day 1
d
24 24

Sat Mon
Auto
22- 01- 1.2.8.3.
Schedule 8 days 196
painting 06- 07- 2
d
24 24

Electrical, Fri Sat


Auto
Plumbing 07- 10-
Schedule 56 days 1.2.8.4
and 06- 08-
d
Carpentering 24 24
work

Auto 20 days Fri Sat 187 1.2.8.4.


Schedule Electrical 07- 29- 1
d work 06- 06-
24 24

Sat Fri
Auto
22- 05- 1.2.8.4.
Schedule Plumbing 12 days 197SS
06- 07- 2
d work
24 24

Sat Mon
Auto
22- 15- 1.2.8.4.
Schedule Carpentering 20 days 200SS
06- 07- 3
d work
24 24

Tue Wed
Auto Floor
16- 07- 1.2.8.4.
Schedule finishing 20 days 201
07- 08- 4
d work
24 24

Thu Sat
Auto
08- 10- 1.2.8.4.
Schedule Menial work 3 days 202
08- 08- 5
d for level 8
24 24
Material Max.
Resource Name Type Initials Group Std. Rate Ovt. Rate Cost/Use Accrue At
Label Units

Executive engineer Work E 5 ₹ 200.00/hr ₹ 0.00 Prorated
0.00/hr

supervisor Work s 5 ₹ 150.00/hr ₹ 0.00 Prorated
0.00/hr

surveyor Work s 4 ₹ 350.00/hr ₹ 0.00 Prorated
0.00/hr

Project engineer Work P 4 ₹ 400.00/hr ₹ 0.00 Prorated
0.00/hr
Construction ₹
Work C 3 ₹ 250.00/hr ₹ 0.00 Prorated
estimator 0.00/hr
constructor ₹
Work c 2 ₹ 500.00/hr ₹ 0.00 Prorated
inspector 0.00/hr

Structural engineer Work S 2 ₹ 300.00/hr ₹ 0.00 Prorated
0.00/hr

junior engineer Work j 8 ₹ 200.00/hr ₹ 0.00 Prorated
0.00/hr
geotechnical ₹
Work g 3 ₹ 250.00/hr ₹ 0.00 Prorated
engineer 0.00/hr

site engineer Work s 5 ₹ 225.00/hr ₹ 0.00 Prorated
0.00/hr

labour Work l 300 ₹ 30.00/hr ₹ 0.00 Prorated
0.00/hr

brick masons Work b 200 ₹ 25.00/hr ₹ 0.00 Prorated
0.00/hr

waterman Work w 20 ₹ 25.00/hr ₹ 0.00 Prorated
0.00/hr

plasterers Work p 12 ₹ 40.00/hr ₹ 0.00 Prorated
0.00/hr

plumber Work p 10 ₹ 45.00/hr ₹ 0.00 Prorated
0.00/hr

carpenters Work c 15 ₹ 50.00/hr ₹ 0.00 Prorated
0.00/hr

electrician Work e 10 ₹ 100.00/hr ₹ 0.00 Prorated
0.00/hr
excavators Cost e Prorated
bull dozer Cost b Prorated
crane Cost c Prorated
backhoe loader Cost b Prorated
₹ ₹
grader Work g 4 ₹ 0.00 Prorated
1,000.00/hr 0.00/hr
₹ ₹
compactor Work c 3 ₹ 0.00 Prorated
1,500.00/hr 0.00/hr
roller Cost r Prorated
concrete mixer Cost c Prorated
dump truck Cost d Prorated

tractors Work t 12 ₹ 200.00/hr ₹ 0.00 Prorated
0.00/hr
₹ ₹
tractor scraper Work t 3 ₹ 0.00 Prorated
1,500.00/hr 0.00/hr
opc cement 43
Material bag ₹ 350.00 ₹ 0.00 Prorated
grade
opc cement 53
Material bag o ₹ 400.00 ₹ 0.00 Prorated
grade
ppc cement Material bag p ₹ 400.00 ₹ 0.00 Prorated
steel of dia 32 Material ton s ₹ 80,000.00 ₹ 0.00 Prorated
steel of dia 25 Material ton s ₹ 80,000.00 ₹ 0.00 Prorated
steel of dia 16 Material ton s ₹ 75,000.00 ₹ 0.00 Prorated
steel of dia 12 Material ton s ₹ 60,000.00 ₹ 0.00 Prorated
steel of dia 10 Material ton s ₹ 55,000.00 ₹ 0.00 Prorated
steel of dia 8 Material ton s ₹ 50,000.00 ₹ 0.00 Prorated
steel of dia 6 for
Material ton s ₹ 50,000.00 ₹ 0.00 Prorated
stirrups
sand Material cum s ₹ 500.00 ₹ 0.00 Prorated
coarse aggregate of
Material cum c ₹ 2,000.00 ₹ 0.00 Prorated
M20
coarse aggregate of
Material cum c ₹ 2,200.00 ₹ 0.00 Prorated
M16
coarse aggregate of
Material cum c ₹ 2,000.00 ₹ 0.00 Prorated
M10
fine aggregate of
Material cum f ₹ 1,800.00 ₹ 0.00 Prorated
4.75mm
fine aggregate of
Material cum f ₹ 1,500.00 ₹ 0.00 Prorated
2.36mm
water Material litre w ₹ 12.00 ₹ 0.00 Prorated
wooden
Material no w ₹ 200.00 ₹ 0.00 Prorated
frame(2.1m*1.2m)
wooden frame( Material no w ₹ 200.00 ₹ 0.00 Prorated
wooden frame Material no w ₹ 180.00 ₹ 0.00 Prorated
glass panels(4'*2') Material no g ₹ 300.00 ₹ 0.00 Prorated
glass panel(2'*6') Material no g ₹ 350.00 ₹ 0.00 Prorated
glass panel(2'*2.5') Material no g ₹ 325.00 ₹ 0.00 Prorated
glass panels(2'*4.5') Material no g ₹ 300.00 ₹ 0.00 Prorated
tiles(2'*2') Material no t ₹ 200.00 ₹ 0.00 Prorated
tiles(2.5'*2.5') Material no t ₹ 225.00 ₹ 0.00 Prorated
marbles(2'*10') Material no m ₹ 300.00 ₹ 0.00 Prorated
marbles(1.5'*4') Material no m ₹ 300.00 ₹ 0.00 Prorated
plastic benches Material no ₹ 200.00 ₹ 0.00 Prorated
wooden desks Material no w ₹ 300.00 ₹ 0.00 Prorated
white board Material no w ₹ 200.00 ₹ 0.00 Prorated
paints Material kg p ₹ 300.00 ₹ 0.00 Prorated
chemicals Material kg c ₹ 0.00 ₹ 0.00 Prorated
window(8'*6') Material no w ₹ 220.00 ₹ 0.00 Prorated
window(2'*10') Material no w ₹ 1,500.00 ₹ 0.00 Prorated
door (4'*6.5') Material no d ₹ 1,800.00 ₹ 0.00 Prorated
door(3'*6.5') Material no d ₹ 800.00 ₹ 0.00 Prorated
water
Material bag w ₹ 500.00 ₹ 0.00 Prorated
pipe(10'*0.33')
water basin Material no w ₹ 500.00 ₹ 0.00 Prorated
toilet seat Material no t ₹ 600.00 ₹ 0.00 Prorated
hand drier Material no h ₹ 600.00 ₹ 0.00 Prorated
water tap Material no w ₹ 400.00 ₹ 0.00 Prorated
fan Material no f ₹ 1,800.00 ₹ 0.00 Prorated
switch Material no s ₹ 30.00 ₹ 0.00 Prorated
electrical board Material no e ₹ 250.00 ₹ 0.00 Prorated
wiring pipe Material no w ₹ 500.00 ₹ 0.00 Prorated
tube light Material no t ₹ 500.00 ₹ 0.00 Prorated
cctv Material no c ₹ 2,500.00 ₹ 0.00 Prorated
microphone Material no m ₹ 2,000.00 ₹ 0.00 Prorated
AC Material no A ₹ 45,000.00 ₹ 0.00 Prorated
₹ ₹
Fire extinguisher Work F 4 ₹ 0.00 Prorated
2,000.00/hr 0.00/hr
brick Cost b Prorated