Kindly arrange to provide the following:
Nozzle G to be repaired or otherwise replaced.
Nozzle M shall be cut and replaced.
Based on data from actual visual and non destructive
examinations, we cannot confirm the integrity of the
existing fillet welded patch plates. Thus, we
recommend cutting the existing patches for further
inspection/investigation on the pressure boundaries
beneath it.
Nozzle O and Manway V shall be repaired.
Arrange to clean the vessel internally from dust.
Arrange to repair the foam breaker.
Arrange to repair the ladder inside the vessel.
The missing anchoring bolts shall be mounted. All anchor
Daily Recommendations bolts shall be tightened as required by the manufacturer
specifications.
Arrange to make the rest of face flanges accessible.
Some areas of the vessel still need cleaning from product
deposit.
Face flanges and internal surfaces of the nozzles still need
cleaning.
To erect scaffolding or any mean of access to the 3, 9 and
12 O’clock positions inside the vessel .
Arrange to provide sufficient lighting inside the vessel.
Arrange to measure the earthling resistance. Inspector
should witness the measurement.
Arrange to repair the defected concrete foundation.
Make all pressure boundaries accessible to the inspector
To perform the rest of the requirements as detailed in the
scope of work.
Page 2
Internal severe defects and Metal loss in nozzle G INternal localized metal loss in nozzle M
Close photo of the internal nozzle neck to flange Dye pen has been applied after surface preparation
weld – Nozzle V
View of the Dye Pen result on the internal weld of View of the Dye Pen result on the internal weld of
nozzle neck to flange – Nozzle V nozzle neck to flange – Nozzle V
Page 3
Nozzle O : Deep internal localized corrosion Non accessible indication at 12 Oclock inside
the vessel
Cracked weld and through hole between FW Existence of liquid beneath the patch plate
patches #11 and 12 #11 and 12 is confirmed
Through hole between FW patches number 5,6,7 and 8 . Existence of liquid beneath it is
confirmed
Page 4
Visual inspection is in progress Multiple pits were reported in the bottom of
the vessel
MT on weld joints
Page 5
Non accessible face flanges
Broken step (first step) in the upper ladder The upper ladder is broken from its bottom
end.
View of the internal surface of one nozzle , View of the deformed steam coil pipes
cleaning is still required
Prepared by
Amjed BENRHAIEM Hassan ALBAWANDI Ismael AL-ASWAD
TIC Libyan
(API 510 Authorized Inspector) (Plant Inspector) (Inspection Supervisor)
branch