EPSB WEEKLY LIST OF ACTIVITY (15/04/2023-21/04/2023)

WORK PERMIT ISSUE DATE TASK DESCRIPTION LOCATION DURATION REMARKS


WP-23-0445 PREVENTIVE MAINTENANCE SURS NB 1900hrs-0000hrs - No impact to operation
WP-23-0445 PREVENTIVE MAINTENANCE ESC03 SB 1900hrs-0000hrs - No impact to operation
WP-23-0445 PREVENTIVE MAINTENANCE BSCS NB 0700hrs-1300hrs - No impact to operation

- De-Energize MSB A (SB) to


conduct contactor step 8
replacement.
- Normalize back MSB A after
complete.
- De-Energize MSB B (NB) to
EP-23-1272-1 15/04/2023 MCCB AND CONTACTOR STEP 8 REPLACEMENT BAUS 0000Hrs-0400Hrs
conduct MCCB replacement.
- Normalize back MSB B after
complete.
- ATS will change over to
another source during this
work
- Required to De-energize
EP-23-1271-1 EARTHING VIADUCT INSPECTION MALS - MALP 0000Hrs-0400Hrs
track supply.
WP-23-0524 ONLINE PD MAPPING MALS 0000Hrs-2359Hrs - No impact to operation
WP-23-0445 PREVENTIVE MAINTENANCE SURS SB 1900hrs-0000hrs - No impact to operation
WP-23-0445 PREVENTIVE MAINTENANCE MALP NB 1900hrs-0000hrs - No impact to operation
WP-23-0445 PREVENTIVE MAINTENANCE BSCS SB 0700hrs-1300hrs - No impact to operation

- De-Energize MSB to conduct


preventive maintenance for
busduct and MSB.
- Normalize back MSB after
EP-23-1270-1 16/04/2023 PM MSB & BUSDUCT PASS SB 0000Hrs-0400Hrs
complete.
- ATS will change over to
another source during this
work.

- Required to De-energize
EP-23-1269-1 EARTHING VIADUCT INSPECTION TAPS - TMIS 0000Hrs-0400Hrs
track supply.
WP-23-0525 ONLINE PD MAPPING TAPS 0000Hrs-2359Hrs - No impact to operation
WP-23-0445 PREVENTIVE MAINTENANCE MUDS NB 1900hrs-0000hrs - No impact to operation
WP-23-0445 17/04/2023 PREVENTIVE MAINTENANCE MALP SB 1900hrs-0000hrs - No impact to operation
WP-23-0445 PREVENTIVE MAINTENANCE BDUS NB 0700hrs-1300hrs - No impact to operation
WP-23-0445 PREVENTIVE MAINTENANCE MUDS SB 1900hrs-0000hrs - No impact to operation
WP-23-0445 PREVENTIVE MAINTENANCE BDUS SB 0700hrs-1300hrs - No impact to operation
WP-23-0444 COMPETENT ENGINEER INSPECTION (INCLUDING
SUBS - SEMS 0700hrs-1900hrs - No impact to operation
PYWP-23-1338 DEPOT)
- De-Energize MSB to conduct
preventive maintenance for
busduct and MSB.
- Normalize back MSB after
EP-23-1268-1 PM MSB & BUSDUCT SRRS SB 0000Hrs-0400Hrs
complete.
18/04/2023 - ATS will change over to
another source during this
work.

- Require to open AT2 at DCR


B.
ON-LOAD TEST FIXED GENSET FOR 1250KVA - Genset will run automatically
EP-23-1263-1 SUBD 0000Hrs-0400Hrs
GENERATOR to supply essential load.
- To operate pump to
maximise load.
WP-23-0445 PREVENTIVE MAINTENANCE BAUS NB 1900hrs-0000hrs - No impact to operation
WP-23-0445 PREVENTIVE MAINTENANCE SUJS NB 0700hrs-1300hrs - No impact to operation
COMPETENT ENGINEER INSPECTION (INCLUDING
WP-23-0444 SEMP - KAJS 0700hrs-1900hrs - No impact to operation
DEPOT)
WORK PERMIT ISSUE DATE TASK DESCRIPTION LOCATION DURATION REMARKS

- De-Energize MSB to conduct


preventive maintenance for
busduct and MSB.
19/04/2023 - Normalize back MSB after
EP-23-1267-1 PM MSB & BUSDUCT BTHS SB 0000Hrs-0400Hrs
complete.
- ATS will change over to
another source during this
work.

- Interruption possibility for all


EP-23-1265-1 PM BATTERY CHARGER KWSS 0000Hrs-0400Hrs connected load to battery
charger.
WORK PERMIT ISSUE DATE TASK DESCRIPTION LOCATION DURATION REMARKS
WP-23-0445 PREVENTIVE MAINTENANCE BAUS SB 1900hrs-0000hrs - No impact to operation
WP-23-0445 PREVENTIVE MAINTENANCE SUJS SB 0700hrs-1300hrs - No impact to operation

- De-Energize MSB to conduct


preventive maintenance for
busduct and MSB.
- Normalize back MSB after
EP-23-1266-1 PM MSB & BUSDUCT BSCS NB 0000Hrs-0400Hrs
20/04/2023 complete.
- ATS will change over to
another source during this
work.

- Interruption possibility for all


EP-23-1264-1 PM BATTERY CHARGER KDAS 0000Hrs-0400Hrs connected load to battery
charger.
WP-23-0445 PREVENTIVE MAINTENANCE TTDS NB 1900hrs-0000hrs - No impact to operation
21/04/2023
WP-23-0445 PREVENTIVE MAINTENANCE STKS NB 0700hrs-1300hrs - No impact to operation