You are on page 1of 1

ATC Tires AP Pvt.

Limited, PROJECT SITE Doc No: Y-OHT/

LOCATION : APIIC, Atchuthapuram,A.P-531011. Rev No: -00

Job Safety Analysis Sheet- Glass Fixing for Façade Rev Date: 31.12.2022

Risk Rating
Status of action against
1)HIGH
Step No. Job step Description Photo Hazard and it's Description Existing control method Proposed control measures Responsibility proposed control
2) Medium
measures .
3) LOW

Activity Name: Glass Fixing


1 Glass Handling 1. Glass Breakage 1. Use proper PPE 1. TBT of All the Manpower to Be done Pre and FCS contractor HIGH
2. Glass + Al Frame slippage 2.More than 2 person will lift post erection.
3. Glass Tripping. the glass as per weight. ( 2. Power tools to be checked Per week.
45kg ) 3. Height Permit to be taken post which work to
3. Ensure permit system related start
to work. 4. Height passes available individuals only to be
4. No one should be around allowed for the work.
glass while handling 5. During Glass Handling 1.5 mtr radius position
barricting will be provided. to be barricaded to ensure safe work.
6. No person to work below the fixing section to
avoid Fall risk of breakage