Client Petroment.
Location Egypt Revision 0
Contractor Ali El Kenany company. Date 27-02-2023
Description Cathodic Protection System - Technical Offer
Time Schedule
Week
Action
1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7
Site Survey and
Soil resistivity
measurement
Engineering
Design
Anodes, test
points and After Design Approval
Cables supply
Installing anodes
and cables
Installing Test
Points