WPRM No - 88 - SGPROJ - 08.04.23
WPRM No - 88 - SGPROJ - 08.04.23
Page 1 of 7
[Ph. – III,(1x660 MW, U#5) SGPROJ03]
Separat 20 14 15
or &
downwa
rd
89 30 15 nos. G.P.
1st pass 800 81 40 10 GP U/P in process.
2nd pass 200 53 30 10 GP U/P 76 20 By 15th of
Apr’23
30 APH area
Mill/ 80 30 05
Work on hold
Rotary Since Mar’23
ESP 1500 156 156 ESP I/L NO
Front avl.,
ESP O/L par.
Front. Avl.
Due to Chi-
mney work.
Page 2 of 7
The West Bengal Power Development Corporation Limited
Page 3 of 7
[Ph. – III,(1x660 MW, U#5) SGPROJ03]
4. Total tube joints completed as on Date (30.03.2023): Total tube joints completed as on Date (07.04.2023): 4840
3784 nos. (Excluding defective). no.
Per day Joint target 200 nos. RT will be done consequently
done.
5 CRITICAL PIPING CRITICAL PIPING
1. 250KVA P91 set available by 2nd week of April23. 1. 250KVA P91 set available by 15.05.23.
2. 02 nos. induction heating m/c available, PCP will supply another 02 nos. 2. 02 nos.induction heating m/c available, PCP will supply
by April 2nd week, another 02 nos. will be available by May’23. BHEL will another 02 nos. by April 2nd week, another 02 nos. will
provide another 02 nos. by April’23. be available by May’23. BHEL will provide another 02
3. Job started from 27.03.23. (Initial date: 18.03.23). Separate gang will be nos. by April’23.
arranged based on front and material availability. 3. Job started from 27.03.23. (Initial date: 18.03.23).
4. UT/RT will be arranged in time as per FQP. Separate gang will be arranged based on front and
5. All erection drawings need to be finalized. Issue to be taken up with BHEL material availability.
Trichy and WBPDCL /HQ/DCPL. 4. UT/RT will be arranged in time as per FQP. issue closed.
6.Critical piping job already started. Additional 10 nos. manpower 5. All erection drawings need to be finalized. Issue to be
mobilization by 07.04.23. Work will resume from 10.04.23. taken up with BHEL Trichy and WBPDCL /HQ/DCPL.
6. Critical piping job already started. Additional 10 nos.
manpower mobilization by 10.04.23. Work will resume
from 10.04.23.
7. Critical piping additional 02 nos. gang will joined by
15.04.23. 01 no. engineer already joined.
MECHANICAL- TG & AUX
6 TG- 1. Handover of Power House from Civil to Mechanical: ALL POINTS RELATED TO CIVIL & STRL . TAKEN UP IN
Mechanical Further floor 17mtr Handed over & 0 mtr in progress. CIVIL & STRL POINTS
2. TG deck side cladding: Detail drawing approved for A and B * 1. Handover of Power House from Civil to Mechanical:
row and submitted for C Row. Erection will start by 1st week Further floor 17mtr Handed over & 0 mtr in progress.
of April’23. Side runner fabrication will be started. All side 2. TG deck side cladding: Detail drawing approved for A
runners may be erected except between A1 & B1 and and B row and submitted for C Row. Erection will start by
between Col. #7 & Col. #8. 1st week of April’23. Side runner fabrication will be
3. TG Hall Permanent Lift: Permanent lift will reach site in end started. All side runners may be erected except between
of April’23 and will be erected by june’23. Also floor A1 & B1 and between Col. #7 & Col. #8.
connection from U-4 will be done. 3. TG Hall Permanent Lift: Permanent lift will reach site in
end of April’23 and will be erected by june’23. Also floor
connection from U-4 will be done.
Page 4 of 7
The West Bengal Power Development Corporation Limited
Page 5 of 7
[Ph. – III,(1x660 MW, U#5) SGPROJ03]
date: 20.03.23). Next week target TDBFP oil pit, Lift pit at grid 0.00mtr Floor: Next week target ABC bay (3-4) casting by
13-15. 10.04.2023 and A-Aa bay (9-11) casting by 08.04.2023.
8.5mtr Floor: BC bay (9-11) casting completed. (Initial date: 20.03.23). Next week target TDBFP oil pit, Lift
Feeder Floor:- LHS feeder floor structural handover for casting pit at grid 13-15.
by 05.04.2023 and fllor casting complete by 21.04.2023. Next 8.5mtr Floor: BC bay (9-11) casting completed. Issue
week target is deck sheeting at 03 spans and reinforcement closed
fixing at one span. Feeder Floor:- LHS feeder floor structural handover for
Transformer Yard: Rail track upto SAT will completed by casting by 08.04.2023 and floor casting complete by
15.04.2023. (Initial date: 31.01.23). 21.04.2023. Next week target is deck sheeting at 03 spans
ESP Control Room: 3.7mtr floor casted on 27.03.2023 (80%). and reinforcement fixing at one span.
0.0mtr grade slab casting completed (90%). Total Ground floor Transformer Yard: Rail track up to SAT will completed by
slab and 3.70m floor slab casting will complete by 15.04.2023 15.04.2023. (Initial date: 31.01.23).
(Initial date: 31.01.23). Lintel casting will start from 10.04.23. UAT Foundation: WBPDCL requested BHEL to finalised
CW channel & Feed Pool: 4th stage mechanical clearance for UAT foundation immediately.
reinforcement work by 07.04.23 and casting date will given in ESP Control Room: 3.7mtr floor casted on 27.03.2023
the next WPRM. (80%). 0.0mtr grade slab casting completed (90%). Total
Next week 02 nos. CW encasing will be done. Ground floor slab and 3.70m floor slab casting will
Fire pump side grade slab casting will start by 10.04.23. complete by 15.04.2023 (Initial date: 31.01.23). Lintel
CWTP: plinth beam completed First lift column casting done. casting will start from 10.04.23.
(Initial date: 18.03.23). ESP inlet side ID duct foundation (A, B CW channel & Feed Pool: 4th stage mechanical clearance
& C pass): for reinforcement work by 07.04.23 and casting by
Raft casting completed for A, B and C pass. Final bolt lift in 20.04.2023
progress and will completed. CW piping: 1st pipe encasing foundation completed .Next
FAE Tower: FAE 1& 2 foundation completed and pedestal week 01 nos. CW encasing will be done.
under progress. BHEL committed that FAE tower 1, 2, 3 & 4 Fire pump side grade slab casting will start by 10.04.23.
will complete by March’ 23 end in all respect. 04 nos. CW pipes will be fitted by 15.04.23.
FD Fan – A & B: Beam work completed and VIS spring fixing by CWTP: plinth beam completed First lift column casting
03.04.2023 Deck casting in April’23. done. (Initial date: 18.03.23).
ESP inlet side ID duct foundation (A, B & C pass):
Raft casting completed for A, B and C pass. Final bolt lift
completed . issue closed.
FAE Tower: FAE 1& 2 foundation completed. BHEL
committed that FAE tower 3 & 4 will complete by April’ 23
end in all respect.
FD Fan – A & B: Beam work completed and VIS spring
fixing by 11.04.2023 Deck casting in April’23.
10. ENCASING Encasing at Boiler: 17/26 nos. completed. Encasing at Boiler: 17/26 nos. completed.
WORK Balance 09 nos. column encasing boiler area as per front Balance 09 nos. column encasing boiler area as per front
availability. availability.
Encasing APH area: 21/38 nos. completed, balance to be Encasing APH area: 21/38 nos. completed, balance to be
completed by 15.04.2023. (Initial date: 25.01.2023). completed by 15.04.2023. (Initial date: 25.01.2023).
11 Structural As on date approved fabrication drawings available at site: As on date approved fabrication drawings available at
Works/ Main Power House: Drawing: - 8831/9700 MT (Excluding Bunker site: Power House: Drawing: - 8831/9700 MT (Excluding
Plant & BOP bay), Mill & Bunker approved fabrication drawing 1198/1636 Bunker bay), Mill & Bunker approved fabrication drawing
MT, Fabrication: 8251/8831MT, Erection: 7408/8141.59 MT. 1198/1636 MT, Fabrication: 8321/8831MT, Erection:
Bending machine issue resolved for ring beam. 7468/8141.59 MT.
RHS feeder floor beam clearance by April’23 First week. Bending machine issue resolved for ring beam.
RHS feeder floor beam clearance received on 1.04.2023
CHP/AHP
12. Structural/ As on date approved fabrication drawings available at site: As on date approved fabrication drawings available at
Civil/Works/ CHP-10000/11962 MT. site: CHP-10000/11962 MT.
AHP/CHP Fabricated 6056.67MT/10000. Available drawing for further Fabricated 6218MT/10000. Available drawing for further
fabrication is 3943.33 MT. fabrication is 3782MT.
Target for Mar ’2023 at CHP area: Target for April ’2023 at CHP area:
Fabrication – 983.912 MT, Erection –779.00 MT. Fabrication – 938.37 MT, Erection –752.518 MT.
TP-20: Fab. Completed 663.27/752 MT, erection 336.911 TP-20: Erection work is in progress. (337/752MT).
/752MT. TP-20A: Erection work is in progress. (269/1171MT).
TP-20A: Erection work is in progress. (267.41/1171MT). TP-21: Erection work is in progress. (298/826MT).
TP-21: Erection work is in progress. (297.54/826MT). TP-22: Erection work is in progress. (364/656MT).
TP-22: Erection work is in progress. (364.33/656MT). TP-23: Erection work is in progress (102/291MT).
TP-23: Erection work is in progress (102.00/291MT). BCN-23 A/B: Erection work is in progress 500/862MT.
BCN-23 A/B: Erection work is in progress 495.64/862MT. Gallery fabrication in progress & erection will be complete
Gallery fabrication in progress & erection will be complete by by 15.04.2023.
Page 6 of 7
The West Bengal Power Development Corporation Limited
BHEL WBPDCL
Page 7 of 7