1 Shell (Interior)
`
To rectify the blistering of the
coating in the affected areas, it
Upon inspecting the interior of is necessary to remove the
the tank shell, it was found to current coating and apply a
be in a visually satisfactory new coating on the interior of
1.1 condition. No damage was the shell.
observed, except for coating
blisters on approximately 1 Surface preparation and
meter of the bottom shell. coating application should be
carried out in accordance with
SEC specifications.
2 Shell (Exterior)
5 Annular Plate
MFL was applied to examine
The MFL report reveals a
the soil side (underside) of tank
maximum EPL of 11%. Overall,
Annular plates and estimate
the tank annular plates were
the condition of the bottom
determined to be in satisfactory
plate's soil side. The maximum
condition. A new coating
5.1 EPL detected by MFL
application will be applied in
inspection is 11%.
accordance with SEC coating
specifications.
Refer to Appendix A for the
The remaining life, calculated is
comprehensive MFL report.
73.5 years.
8 Foundation
`
The interior of the IFR (Internal
Floating Roof) pontoon is
found to be in visually This information is provided
11.3
satisfactory condition, with no solely for reference
leaks or damage observed.
Gauge calibration is
Tank Automatic Tank Gauge recommended, and a
14.2 system found visually comprehensive report
satisfactory condition. documenting the calibration
process should be prepared.
15 Spiral Stairway
16 Roof Handrail