Equipment No : Treated Crude Oil Tank-4

Report Number : VKSA-MKA-SEC-202403-43 Rev.0


Date Of Report : March 4, 2024
Tank location : SEC Juba Power Plant

7. EXTERNAL INSPECTION FINDING & RECOMMENDATION

Sl. No FINDINGS RECOMMENDATION PHOTO

1 Shell (Interior)
`
To rectify the blistering of the
coating in the affected areas, it
Upon inspecting the interior of is necessary to remove the
the tank shell, it was found to current coating and apply a
be in a visually satisfactory new coating on the interior of
1.1 condition. No damage was the shell.
observed, except for coating
blisters on approximately 1 Surface preparation and
meter of the bottom shell. coating application should be
carried out in accordance with
SEC specifications.

2 Shell (Exterior)

Based on the current ultrasonic


testing (UT) report, no thickness
No shell damage was visually reduction has been observed
observed during the visual during the tank's construction.
inspection, but coating failure
was noted on the exterior of Since there are no baseline
the shell in various random readings available, the current
locations. inspection thickness is
considered the baseline
2.1
Furthermore, a visual reading, and it is
inspection and ultrasonic recommended to continue
thickness test were conducted monitoring the shell thickness.
in accessible areas covered by
the ladder, confirming the Moreover, the sections
comprehensive coverage of experiencing coating failures
the first shell. need refurbishment, and a
coating patch repair should be
executed in compliance with
SEC coating specifications.

VKSA-MKA-SEC-MFL-202403-43 Page 9 of 137


Equipment No : Treated Crude Oil Tank-4
Report Number : VKSA-MKA-SEC-202403-43 Rev.0
Date Of Report : March 4, 2024
Tank location : SEC Juba Power Plant

Sl. No FINDINGS RECOMMENDATION PHOTO

3 Bottom Plates (Soil side)

MFL was applied to examine


the soil side (underside) of tank
bottom plates and estimate
the condition of the bottom The MFL report indicates a
plate's soil side. maximum EPL depth of 13%.
Overall, the tank bottom plates
3.1 The maximum Estimated were found to be in satisfactory
Percentage Loss (EPL) condition.
detected by MFL inspection is
13%. The estimated remaining life of
the bottom plates is
Refer to Appendix A for the 109.12 years.
comprehensive MFL report.

4 Bottom Plate (Product Side)

A new coating application will


The coating on the product
be applied. Surface
4.1 side of the tank plate has been
preparation and coating
removed to facilitate MFL
application shall be conducted
inspection.
in accordance with SEC
specifications.

The weld joints were found to


The welding joint of the tank
be in visually satisfactory
bottom plate has undergone
4.2 condition, and the VBT results
visual inspection, and VBT was
were deemed satisfactory as
applied.
well.

5 Annular Plate
MFL was applied to examine
The MFL report reveals a
the soil side (underside) of tank
maximum EPL of 11%. Overall,
Annular plates and estimate
the tank annular plates were
the condition of the bottom
determined to be in satisfactory
plate's soil side. The maximum
condition. A new coating
5.1 EPL detected by MFL
application will be applied in
inspection is 11%.
accordance with SEC coating
specifications.
Refer to Appendix A for the
The remaining life, calculated is
comprehensive MFL report.
73.5 years.

VKSA-MKA-SEC-MFL-202403-43 Page 10 of 137


Equipment No : Treated Crude Oil Tank-4
Report Number : VKSA-MKA-SEC-202403-43 Rev.0
Date Of Report : March 4, 2024
Tank location : SEC Juba Power Plant

Sl. No FINDINGS RECOMMENDATION PHOTO

6 Manways And Nozzles

The manway and its cover


were found to be in This information is provided
6.1
satisfactory condition. solely for reference.

The tank ladder access hatch


This information is provided
6.2 and cover were in visually
solely for reference.
satisfactory condition.

The roof projection radar


This information is provided
6.3 nozzles were found to be in
solely for reference.
satisfactory condition.

The corroded location should


The roof access manway is
be refurbished, and a coating
visually in satisfactory
application should be applied.
condition; however, coating
6.4 Surface preparation and
failure and corrosion were
coating application should be
observed on both the manway
carried out in accordance with
and its cover.
SEC specifications.

The failure location should be


The tank nozzles, inlets, and refurbished, and a coating
outlets nozzles are visually application should be applied.
6.5 inspected and found to be in Surface preparation and
satisfactory condition with coating application should be
general coating failure. carried out in accordance
with SEC specifications

VKSA-MKA-SEC-MFL-202403-43 Page 11 of 137


Equipment No : Treated Crude Oil Tank-4
Report Number : VKSA-MKA-SEC-202403-43 Rev.0
Date Of Report : March 4, 2024
Tank location : SEC Juba Power Plant

Sl. No FINDINGS RECOMMENDATION PHOTO

The failure location should be


The tank cleanout doors were
refurbished, and a coating
visually inspected and found to
application should be applied.
be in satisfactory condition,
6.6 Surface preparation and
although rusting was observed
coating application should be
on the davit arm and there
carried out in accordance
was a general coating failure.
with SEC specifications

The IFR pontoon access


manway is found to be in
This information is provided
6.7 visually satisfactory condition,
solely for reference.
although it is covered with dust
particles overall.

The internal floating roof


access manways are found to
be in visually satisfactory This information is provided
6.8
condition. although it is solely for reference.
covered with dust particles
overall.

7 Bottom Projection Plate

The projection plate is in


satisfactory condition;
The identified gap between the
however, a noticeable gap
projection plate and the ring
7.1 exists between the ring wall
wall should be addressed by
and the projection plate, and
applying a specific type of
no sealant was present at the
sealant material.
time of inspection.

8 Foundation

To actively participate in civil


Hair line cracks were
engineering practices in order
8.1 observed in the foundation of
to comprehensively address
the tank.
the underlying issue.

VKSA-MKA-SEC-MFL-202403-43 Page 12 of 137


Equipment No : Treated Crude Oil Tank-4
Report Number : VKSA-MKA-SEC-202403-43 Rev.0
Date Of Report : March 4, 2024
Tank location : SEC Juba Power Plant

Sl. No FINDINGS RECOMMENDATION PHOTO

9 Fixed Roof Exterior

The failure location should be


The exterior surface of the
refurbished, and a coating
tank roof displayed minor
patch repair should be
coating failures at various
applied. In the absence of UT
9.1 locations.
baseline readings, current
Ultrasonic thickness
inspection thickness serves as
measurements were
the baseline, advising ongoing
conducted on roof plates.
roof thickness monitoring.

The tank roof vent was found This information is provided


9.2
to be in satisfactory condition. solely for reference.

The mechanical level gauge


system was not present on the
The tank roof was observed to
tank at the time of inspection.
have an unused gauge port
9.3 If there are no plans for its
or drilled opening intended
installation, please temporarily
for future gauge installation.
seal the opening for future
installation.

10 Fixed Roof Interior

A visual inspection of the fixed


roof interior was conducted
from the tank's IFR Deck using This information is provided
10.1
a flashlight. The interior was solely for reference.
found to be in visually
satisfactory condition.

11 Internal Floating roof Exterior

A proper cleaning method will


The exterior surface of the be employed to effectively
floating roof has been remove the dust and dirt from
11.1
observed to be covered with the exterior surface of the
dust and dirt particles. floating roof for further visual
inspection.

VKSA-MKA-SEC-MFL-202403-43 Page 13 of 137


Equipment No : Treated Crude Oil Tank-4
Report Number : VKSA-MKA-SEC-202403-43 Rev.0
Date Of Report : March 4, 2024
Tank location : SEC Juba Power Plant

Sl. No FINDINGS RECOMMENDATION PHOTO

The exterior of the floating


A cleaning process is
roof pontoon is generally in
11.2 requested to remove the dust
satisfactory condition.
and dirt from the surface of
However, dust and dirt were
the floating roof pontoon.
observed on its surface.

`
The interior of the IFR (Internal
Floating Roof) pontoon is
found to be in visually This information is provided
11.3
satisfactory condition, with no solely for reference
leaks or damage observed.

The foam dam area has been A cleaning process is


observed to have requested to remove the dust
11.4
accumulated several dust and dirt from the foam dam
and dirt particles. area

During the inspection, it was


observed that the Rim Vent
and the Pressure Vacuum A root cause analysis was
Relief Valve with Flame conducted to investigate the
11.5 Arrestor were not present in installation issues related to the
the Internal Floating Roof (IFR) Rim Vent and Vacuum Relief
of the tank. Nozzles were Valve.
noted for potential
installation.

A new secondary seal unit


must be installed. During the
The tank wiper seal has installation, it is essential to
undergone a visual strictly adhere to the
11.6
inspection, revealing the manufacturer's guidelines to
presence of damages. ensure the best fit and optimal
performance of the new IFR
seal.

VKSA-MKA-SEC-MFL-202403-43 Page 14 of 137


Equipment No : Treated Crude Oil Tank-4
Report Number : VKSA-MKA-SEC-202403-43 Rev.0
Date Of Report : March 4, 2024
Tank location : SEC Juba Power Plant

Sl. No FINDINGS RECOMMENDATION PHOTO

12 Internal Floating roof Interior

The interior of the floating roof


has undergone a visual A proper cleaning method was
12.1 inspection and is deemed to employed to remove the sand
be in satisfactory condition. from the interior of the floating
deck.
Residual Sand were noticed.
A new primary seal unit must
be installed. During the
Upon evaluation, visual installation, it is essential to
damage has been identified strictly adhere to the
12.2
in the foam seal of the manufacturer's guidelines to
internal floating roof. ensure the best fit and optimal
performance of the new roof
seal.
13 Tank internal components

Based on the UT report no


The tank drain-off sump was thickness reduction were
visually inspected and found observed, a new coating shall
13.1 to be in satisfactory condition. be applied Surface preparation
Additionally, UT A scans were and coating application should
conducted. be carried out in accordance
with SEC specifications

The floating suction arms in


the tank were identified as
misaligned from the resting Open the flange joint to verify
arm capture. freedom from any damage.
A small bend was observed Inspect thoroughly to ensure
on the suction arms, and the joint is in good condition.
there were signs of product Service the swivel to ensure it is
leakage at the shell flange to free from any damage.
swievel joint flange. Conduct necessary repairs or
Furthermore, the stop chain replacements if any issues are
13.2 wire rope was found to be detected.
broken. Replace the broken wire ropes
Additionally, coating failure with a new one.
was observed. Ensure the new wire is securely
The sling wire of the suction fastened and in good working
arm counterbalance weight order.
has been identified as broken Remove the existing coating as
and separated. needed. Apply a new coating
The suction drums were found in accordance with SEC
to be in visually satisfactory coating specifications.
condition.

VKSA-MKA-SEC-MFL-202403-43 Page 15 of 137


Equipment No : Treated Crude Oil Tank-4
Report Number : VKSA-MKA-SEC-202403-43 Rev.0
Date Of Report : March 4, 2024
Tank location : SEC Juba Power Plant

Sl. No FINDINGS RECOMMENDATION PHOTO

Apply a new coating in


The floating leg support pads
accordance with the standards
13.3 were found to be in visually
set by the Saudi Electricity
satisfactory condition.
Company (SEC).

Remove the existing coating


and apply a new coating in
accordance with the standards
The tank center columns were set by the Saudi Electricity
13.4 found to be in satisfactory Company (SEC).
condition. `
The column rubber seal must be
replaced From the IFR Column
cover.

Remove the existing coating


within one or two meters from
the bottom and apply a new
The internal access ladder and
coating in accordance with the
Tank Guide pole was found to
13.5 standards set by the Saudi
be in visually satisfactory
Electricity Company (SEC).
condition.
Additionally, replace the ladder
rubber seals.

Auto Bleeder Vent Assembly


This information is provided
13.6 found with visually satisfactory
solely for reference.
condition.

14 Tank external components

Tank external attachment is This information is provided


14.1
found satisfactory condition. solely for reference.

VKSA-MKA-SEC-MFL-202403-43 Page 16 of 137


Equipment No : Treated Crude Oil Tank-4
Report Number : VKSA-MKA-SEC-202403-43 Rev.0
Date Of Report : March 4, 2024
Tank location : SEC Juba Power Plant

Sl. No FINDINGS RECOMMENDATION PHOTO

Gauge calibration is
Tank Automatic Tank Gauge recommended, and a
14.2 system found visually comprehensive report
satisfactory condition. documenting the calibration
process should be prepared.

The tank nameplate was found This information is provided


14.3
securely fixed. solely for reference.

The tank earthing cable is in This information is provided


14.4
good condition and well-fixed. solely for reference.

15 Spiral Stairway

Recommended to refurbish the


coating failure locations on the
The stairway of the tank was
stairway and apply a coating in
15.1 visually inspected, revealing
accordance with the
coating failure.
specifications outlined by the
Saudi Electricity Company.

16 Roof Handrail

The roof handrail is observed This information is provided


16.1
visually satisfactory condition. solely for reference.