Date: 7/04/2023

X308C NKG PH Status Update


7-Apr-23

**Confidential: “Any information, data and drawings embodied in this proposal are strictly confidential and are supplied on the understanding that
they will be held confidentially and not disclosed to third parties without the prior written consent of AIMFLEX Group Berhad and subsidiaries.” Revision: 00
Discussion Minutes

Autonomous . Intelligent . Machines . Flexible


1st Priorities Item

Autonomous . Intelligent . Machines . Flexible


1st Priorities Shipment Summary

Autonomous . Intelligent . Machines . Flexible


2nd Priorities Item

Autonomous . Intelligent . Machines . Flexible


Item List 2nd Phase

Autonomous . Intelligent . Machines . Flexible


Summary Proposed Shipment Date (2nd Phase)

Remarks : Discussion on WW14.3


Dyson agreed to proceed the shipment as proposed. Aimflex proceeded for the shipment booking for all the 2nd phase item.
Aimflex to revert space availability once the forwarder confirm

Autonomous . Intelligent . Machines . Flexible


P23-0134B TNT Machine – 6 unit
Status Update,
Latest Expectation requested on WW12.3 as below,
(more details to be attached)

i. ETD AIR SHIP WW15.7 x 2 TNT (5th & 6th)


- Mech assembly & wiring for TNT machine only - DONE
- TNT alignment & electrical integration for TNT - DONE
- Mech assy & wiring for conveyor M-Section – DONE
TNT5 - Integration testing – WIP, just started today
- No standard part risk
- Need to ready up test by WW15.1 for packing/crating WW15.2/3
TNT6 - Need to ready pickup to port by WW15.4 (shipment booking ongoing)

ii. ETD AIR SHIP WW16.7 x 2 TNT (7th & 8th)


- Mech assembly & wiring for TNT machine only - WIP
- TNT alignment & electrical integration for TNT - Pending
- Mech assy & wiring for conveyor M-Section - Pending
- No standard part risk
- Need to ready up test by WW16.1 for packing/crating WW16.2/3
- Need to ready pickup to port by WW16.4 (shipment booking pending)

TNT9 iii. ETD AIR SHIP WW17.7 x 2 TNT (9th & 10th) (Swap with Zone A conveyor Linkage)
- Mech assembly & wiring for TNT machine only – Partial assy WIP
- TNT alignment & electrical integration for TNT - Pending
TNT10
TNT7 - Mech assy & wiring for conveyor M-Section - Pending
- Standard part risk on TIM40, since still pending BAFA approval
TNT8 - Need to ready up test by WW17.1 for packing/crating WW17.2/3
- Need to ready pickup to port by WW17.4 (shipment booking pending)

Full conveyor depends on down time availability of NKG. TBD

Autonomous . Intelligent . Machines . Flexible


P23-0134B TNT Machine
Details Development Plan for TNT5, TNT6, TNT7, TNT8

Autonomous . Intelligent . Machines . Flexible


P23-0134B TNT Machine
Details Development Plan for TNT9, TNT10

Autonomous . Intelligent . Machines . Flexible


P23-0133D - Tube Insertion Machine
Status Update,
i. Mechanical Fabrication - completed
ii. Mechanical Assembly - completed
iii. Panel Wiring – completed
iv. Rack Wiring – completed WW14.2
v. Full Assy & Wiring – completed WW14.2
vi. Integration – WIP, for software & testing run with fully auto mode.
Target complete W15.1
vii. Purchase part – major part
SMC actuator WW12.4 - arrived
Bosch Part (conveyor, electrical sensor, stopper, damper) – arrived
WW13.5
Mitigate plan by expediting full assy/wiring & integration task. Then
air freight it with 5th & 6th TNT
- Proposed new shipment on WW15.7 – AIR freight (together with 5th
& 6th TNT)

Original plan to deliver via sea shipment on WW17, for setup WW19

Autonomous . Intelligent . Machines . Flexible


P23-0133D Tube Insert Machine
Details Development Plan

Autonomous . Intelligent . Machines . Flexible


P23-0133J - Motor Mount Machine

Status Update,
i. Mechanical Fabrication - completed
ii. Mechanical Assembly – completed
iii. Panel Wiring – completed
iv. Rack Wiring – WIP, target complete WW14.4/5
v. Integration – target to start integrate WW15.1 (will need more time to test
as it is newly developed machine by Aimflex)
vi. Purchase part – NA

Proposed remain sea shipment, proposed WW16.7 sailing date

Original plan to deliver via sea shipment on WW17, for setup WW19

Autonomous . Intelligent . Machines . Flexible


P23-0133J - Motor Mount Machine
Details Development Plan

Autonomous . Intelligent . Machines . Flexible


P23-0133E - Greasing Machine
Status Update,
i. Mechanical Fabrication - completed
ii. Mechanical Assembly - completed
iii. Panel Wiring – completed
iv. Rack Wiring – WIP, target complete WW14.5
v. Integration – Target start WW15.1
vi. Purchase part – Bosch Part (conveyor, sensor, stopper,
damper) received WW13.5

Proposed remain sea shipment, proposed WW16.7 sailing date

Original plan to deliver via sea shipment on WW17, for setup WW19

Autonomous . Intelligent . Machines . Flexible


P23-0133E - Greasing Machine
Details Development Plan

Autonomous . Intelligent . Machines . Flexible


P23-0133L Zone A Conveyor Linkage
Status Update,
i. Mechanical Fabrication - completed
ii. Mechanical Assembly – Only leg set assembled,
proposed to prioritizing TNT 9th & 10th
completion
iii. Panel Wiring – completed
iv. Rack Wiring – Only leg set assembled, proposed to
prioritizing TNT 9th & 10th completion
v. Integration – Pending
vi. Purchase part – partial Bosch part reached, balance
WW14.6/WW15.1

Proposed remain sea shipment, proposed WW18.7 sailing date to


prioritizing TNT completion

Original plan to deliver via sea shipment on WW17, for setup WW19

Autonomous . Intelligent . Machines . Flexible


P23-0134E Pallet Zone B (15 unit)
Status Update,
i. Fabrication part – completed, newly received
fabrication part WW14.1
ii. Assembly – Ongoing partial mech assy with the
standard part
iii. Standard part – No risk

Proposed remain sea shipment, proposed WW16.7 sailing date

Original plan to deliver via sea shipment on WW17, for setup WW19

Autonomous . Intelligent . Machines . Flexible


3rd Priorities Item

Autonomous . Intelligent . Machines . Flexible


P23-0134 Pre-TNT Machine
Status Update,
i. Mechanical Fabrication – Completed
ii. Mechanical Assembly – Partial mech assy ongoing/assembled on
structure (since prioritizing for 2nd phase item)
iii. Panel Wiring – completed
iv. Rack Wiring – pending
v. Integration – pending
vi. Purchase part - NA

Original plan to deliver via sea shipment on WW19

Autonomous . Intelligent . Machines . Flexible


P23-0134E Pallet Zone B (15 unit)
Status Update,
i. Fabrication part – completed, newly received
fabrication part, WW14.1
ii. Assembly – Ongoing partial mech assy with the
standard part
iii. Standard part – No risk
Original plan to deliver via sea shipment on WW17

Autonomous . Intelligent . Machines . Flexible


CONTACT US

Sales

SL/Richard
+6012-2999254 / +6017-7296867

Project

Muzamir/Bazli/Nik
+6018 987 4635 / +6018-7904049

AIMFLEX Group

www.AIMFLEX.com.my

12-2, Jalan Persiaran Teknologi,


Taman Teknologi Johor, 81400,
Senai, Johor, Malaysia

You might also like